Loading...
HomeMy WebLinkAboutChange Order No. 5 with Hobson Fabricating for Phase 3 Tenant Improvements New City HallC`~ 1 -~ ot~ - C1 `I ~~ ~'Q~ CITY OF MERIDIAN 33 EAST IDAHO MERIDIAN, ID 83642 CONTRACT CHANGE ORDER CHANGE ORDER NO. 05 PROJECT NO. CH-06-001 DATE: 1 /20/09 EFFECTIVE DATE: CONTRACTOR: HOBSON FABRICATING PROJECT: MERIDIAN CITY HALL -Phase 3 Tenant Improvements The Contractor is hereby directed to make the following changes from the Contract Documents and Plans. Description: Incorporate revisions for Misc. ASI's & backcharge ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME. Reason for Change Order: Additional scope or revisions per listed ASI's and RFI's Attachments: Change order items description, dated 1/20/09, with contractor quotes CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price $2,060,000.00 Original Contract Times: Substantial Completion 8/28/08 Net changes orm previous Change Orders Net changes form previous Change Orders No. 01 to 0 No._ to _ (calendar days) $95, 921.0 None Contract Price Prior to this Change Order: Contract Times prior to this Change Order: (calendar days or date) $2,155,921.00 8/2e/2oos Net Increase (decease) of this Change Order: Net Increase (decrease) of this Change Order: (plendar days or date) $2,725.00 None Contract Price with all Approved Change Orders: Contract Times with all Approved Change Orders: (calendar days) $2,158,646.00 Substantial Completion 8/28/2008 RECOMMENDED: (CONSTRUCTION MANAGER) ACCEPTED: (CONTRACTOR) Petra Inc. _ _ ~- Hobson Fabricating'~'~ ~ ~~ By: Thomas R. Cough in ~ By: Ted Frisbee, Jr. Date: Date: ~ ~ ~ APPROVED: (CITY PURCHASING AGENT) COUNCI APP OVAL By: Keith Watts Date: Date: APPROVED: (CITY) - ATTEST: By: Mayor Tammy de Weerd By: City Clerk, Jaycee Holman Date: Date: TITLE: ASI 166 & 166R PROJECT: Meridian City Hall TO: Attn: Ted Frisbee, Jr. Hobson Fabricating Corp. 6428 Business Way Boise, ID 83716 Phone: 343-5423 Fax: 343-5446 RE: To: DESCRIPTION OF CHANGE DATE: 1/20/2009 7OB: 060675 CONTRACT NO: 33 From: Number: It~irrit ;Description 00001 ASI 166 & 166R -Glycol & Feed Pump Connection for Hydronic Heating Loop (COR # 47 & 48) Provide 30% glycol solution in the hydronic healing loop and connect the heating hydronic system to glycol feed pump. Connect e:asting glycol low fluid alarm contact to DDC system alarm. Hobson quote 1/16/09 & e-mail 1/19/09. Design Lssue. 00002 Backcharge for painting work by others. Prep and paint access door added after initial painting work was completed. Commerdal Painting invoice #290262 dated 9/08. Construction Issue. Tax Tax Met, Quantity Units unit Price Rate Amount Amount 1.000 LS $2,760.00 0.00% $0.00 $2,760.00 1.000 LS ($35.00) 0.00% $0.00 ($35.00) Unit Cost: $2,725.00 Unit Tax: $0.00 Lump Sum: $0.00 Lump Tax: $0.00 0.0% GC markup: $0.00 Total: $2,725.00 The Original Contract Sum was ................................................................................................. $2,060,000.00 Net Change by Previously Authorized Requests and Changes ................................................ $95,921.00 The Contract Sum Prior to This Change Order was ...................................................... $2,155,921.00 The Contract Sum Will be Increased ................................................................................... $2,725.00 The New Contract Sum Including This Change Order ...................................................... $2,158,646.00 The Contract Time Will Not Be Changed ................................................................................. The Date of Substantial Completion as of this Change Order Therefore is .............................. ACCEPTED: Hobso~ri ti C Petra I porated LCA Arc itects, P ~~ ~ By; ~~ ~ ~~.~/ Vim' By; By; ~ q ~ .nn T d Frisbe Jr. om Coughlin Steve Christensen Date: ~ ~ Date: Date: ' 1 ~-~ ~ C Expediflon ® ~i 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 MERIDIAN CITY HALL PROJECT NO: CH-06-001 HOBSON FABRICATING -Phase 3 (33) CHANGE ORDER NO 5 01 /20/09 CHANGE ORDER ITEMS 1 ASI 166 & 166R Glycol & Feed Pump Connection for Hydronic Heating 2,760.00 Loop (COR#47 i~ 48) Provide 30% glycol solution in the hydronic heating loop and connect the heating hydronic system to glycol feed pump. Connect existing glycol low fluid alarm contact to DDC system alarm. Hobson quote 1/16/09 & email 1/19/08. 2 Backcharge for painting work by others. (35.00} Prep and paint access door added after initial painting work was completed. Commercial Painting invoice #290262, dated 9/08 2,725.00 Page 1 of 1