Budgeted Contract Amendment No. 6 with Buss Mechanical for Phase 3 Tenant Improvements New City HallCITY OF MERIDIAN 33 EAST IDAHO MERIDIAN, ID 83642 BUDGETED C®NTRACT AMENDMENT BUDGETED CONTRACT AMENDMENT N0.06 PROJECT NO. CH-06-001 DATE: 1 /19/09 EFFECTIVE DATE: CONTRACTOR: BUSS MECHANICAL PROJECT: MERIDIAN CITY HALL -Phase 3 Tenant Improvements The Contractor is hereby directed to make the following changes from the Contract Documents and Plans. Description: Incorporate revisions per ASI's #121, #166, #166R S Backcharge for damage ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME. Reason for Budgeted Contract Amendment: Additional scope or revisions per listed ASI's Attachments: Change Items description, dated 1/14/09, with contractor quotes CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIIlAES: Original Contract Price $953,385.00 Original Contract Times: Substantial Completion 8/28/08 Net changes form previous Budgeted Contract Amendment: Net changes form previous Budgeted Contract Amendment: No. 01 to 04 No._ to _ (calendar days) $38,444.00 None Contract Price Prior to this Budgeted Contract Amendment: Contract Times prior to this Budgeted Contract Amendment: (calendar days or date) $991,829.00 s/zs/2oos Net Increase (elesree3e~ of this Budgeted Contract Amendment: Net Increase (decrease) of this Budgeted Contract Amendment: (calendar days or date) $16,477.00 None Contract Price with all Approved Budgeted Contract Contract Times with all Approved Budgeted Contract Amendment: Amendment: (calendar days) $1,008,306.00 Substantial Completion 8/28/2008 RECOMMENDED: CONSTRUCTION MANAGER) ACCEPTED: (CONTRALTO Petra Inc. ~ Buss Mechanical By: Thomas R. Coughlin By: John Buss Date: ~°-Z„~ -c, Date: ~_~c~_~ APPROVED: (CITY PURCHASING AGENT) COUNCIL APPROVA By: Keith Watts Date: Date: APPROVED: (CITY) - ATTEST: By: Mayor Tammy de Weerd By: City Clerk, Jaycee Holman Date: Date: 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 TITLE: ASI 121, 166, 166R & Damage PROJECT: Meridian City Hall TO: Attn: John Buss Buss Mechanical PO BOX 190476 phys: 4471 S. Henry Boise, ID 83719 Phone:208-562-0600 Fax:208-562-0555 RE: CO To: BUSS DESCRIPTION OF. CHANGE **All taxes are included in costs** From: PETRA item Re~cription 00001 ASI #121: Boiler Control Modifications (COR#39). Install connection saddle for additional flow meter and two sound boxes on hot water pumps. Buss invoice #12-8482, dated 12/1/08. 00002 ASI#166 -Glycol for Heating Hydronic Loop (COR#43). Provide 30% glycol solution in the heating hydronic loop per engineers direction. Buss invoice #12-8493, dated 12/23/08. 00003 ASI#166R -Glycol Feed Pump Connection (COR#44). Connection heating hydronic system to glycol feed pump. Connect e~asting glycol low fluid alarm contact to DDC system alarm. Buss quote dated 12/29/08. 00004 Backcharge for damage to paint finishes and repair at added access doors. Commercial Paint invoice #290254, dated 9/13/08 = $52.50 Commercal Paint Invoice #290261 dated 9/27/08 = $115.00 Commercal Pafnt Invoice #290266 dated 9/2008 = $35.00 Commercal Paint Invoice #290274 dated 10/2/08 = $105.00 DATE: 1/19/2009 JOB: 060675 CONTRACT NO: 32 Number: 00001 Tax Tax ` Net Quantity Units Unit Price .Rate Amount Amount 1.000 LS $637.00 0.00% $0.00 $637.00 1.000 LS $13,725.00 0.00% $0.00 $13,725.00 1.000 LS $2,423.00 0.00% $0.00 $2,423.00 1.000 LS ($308.00) 0.00% $0.00 ($308.00) Unit Cost: $16,477.00 Unit Tax: $0.00 Lump Sum: $0.00 Lump Tax: $0.00 0.0% GC markup: $0.00 Total: $16,477.00 The Original Contract Sum was ................................................................................................. $953,385.00 Net Change by Previously Authorized Requests and Changes ................................................ $38,444.00 The Contract Sum Prior to This Change Order was ...................................................... $991,829.00 The Contract Sum Will be Increased ................................................................................... $16,477.00 The New Contract Sum Including This Change Order ...................................................... $1,008,306.00 The Contract Time Will Not Be Changed ................................................................................. The Date of Substantial Completion as of this Change Order Therefore is .............................. ACCEPTED: Buss Mecha c I Petra Inc porated LCA A chitects John Buss Steve Christensen Date: ~_ ~ ~_ ®~ Date: Zs ~ s~~ Date: ~ ~ 2~?, 4~ .-~~ Expedition IWERIDIAN CITY HALL PROJECT NO: CH-06-001 BUSS MECHANICAL -Phase 3 (32) CHANGE ORDER NO 6 01/14/09 CHANGE ORDER ITEMS ASI 8< RFI Changes 1 ASI 121 Boiler Control Modifications (COR#39) Install connection saddle for additional flow meter & two sound boxes on hot water pumps. Buss invoice #12-8482, dated 12/1/08 2 ASI 166 Glycol For Heating Hydronic Loop (COR#43) Provide 30% glycol solution in the heating hydronic loop per engineers direction Buss invoice 12-8493, dated 12/23/08 3 ASI 166R Glycol Feed Pump Connection (COR# 44) Connection heating hydronic system to glycol feed pump. Connect existing glycol low fluid alarm contact to DDC system alarm Buss quote 12/29/08 4 Backcharge for damage to paint finishes and repair at added access doors. Commercial Paint invoice #290254, 9/13/08 Commercial Paint invoice #290261, 9/27/08 Commercial Paint invoice #290266, 9/08 Commercial Paint invoice #290274, 10/2/08 $ 637 $ 13,725 $ 2,423 $ (308) $ 52.50 $ 115.00 $ 35.00 $ 105.00 $ 307.50 $ 16,477 Page 1 of 1