Loading...
HomeMy WebLinkAboutChange Order No. 5 with JC Constructors for WWTP Expansion Project~~ ~ CHANGE ORDER 5 PROJECT: City of Meridian -Wastewater Treatment Piant Expansion Project DATE OF ISSUANCE: October 18, 2007 EFFECTIVE DATE:: October 18, 2007 OWNER: City of Meridian CONTRACTOR: JC Constructors, Inc. ENGINEER: Carollo Engineers, P.C. Page 1 of 2 You are directed to make the following changes in the Contract Documents. • Pothole and field adjust Secondary Clarifier RAS piping tie-in (WCD 25) • Modify electrical power feed to tN system (WCD 26) • Add grating supports and sampling cutout at Secondary Splitter Box (WCD 29) • Final costs for construction of Five Mile creek bridge and outfall pipe (WCD 34a) • Realign 36"-SE pipe due to unforeseen location of Secondary Clarifier 4 effluent pipe (WCD 36) • Post Aeration Building entry steps and paving (WCD 38) • Removal of existing footing for uniform surface to construct Aeration Basin 1 & 2 extension (WCD 42) • Removal of unforeseen grout under filter media (WCD 45a) • Revise layout and preparation of paving around Primary Clarifiers 3 & 4 (WCD 47) • Add lighting for flag pole (RFP 022). • Credit for the elimination of asphaltic coating at the Primary Clarifier mechanism (RFP 23) • Removal and replacement of owner supplied Mag flow meter (RFP 26) • Revise pipe support hangers in Aeration Basins 1 & 2 (RFP 28) • Revise scum vault and pump slide rails at Secondary Clarifier 5 (RFP 29) Time Extension to include additional scope of work requested by the City, as follows: I. Five Mile Creek Bridge Crossing and Flow Meter 2. Tertiary Filter Installation 3. 42-inch Diameter Raw Sewage pipe expansion. 4. Chemical Feed Facilities for Chemicaily Enhance Primary Treatment and Anaerobic Digesters. Attachments: JC Constructors Change Proposal Request - (WCD 25) -September 21, 2007 for $4,789.44 JC Constructors Change Proposal Request - (WCD 26) -June 19, 2007 for $7,192.29 JC Constructors Change Proposal Request - (WCD 29) -June 20, 2007 for $83b.96 JC Constructors Change Proposal Request - (WCD 34a) -August 14, 2007 for $18,417.08 JC Constructors Change Proposal Request - (WCD 36) -May 29, 2007 for $2,174.37 JC Constructors Change Proposal Request - (WCD 38) -May 8, 2007 for $14,160.64 JC Constructors Change Proposal Request - (WCD 42) -August 16, 2007 for $2,077.82 JC Constructors Change Proposal Request - (WCD 45a) -October 1, 2007 for $12,264.33 JC Constructors Change Proposal Request - (WCD 47) -September 21, 2007 for $5,157.41 JC Constructors Change Proposal Request - (RFP 22) -June 16, 2007 for $3,052.94 JC Constructors Change Proposal Request - (RFP 23) -September 21, 2007 for (-$2,241.29). JC Constructors Change Proposal Request - (RFP 26) -September 21, 2007 for 2,867.20 JC Constructors Change Proposal Request - (RFP 28) -September 21, 2007 for $4,419.41 JC Constructors Change Proposal Request - (RFP 29) -July 31, 2007 for $11,068.15 Page 2 of 2 CIIANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price Original Contract Times Substantial Completion: 670 Davs - Sepember 1, 2007 $ 8,367,SOU.UO Ready for Final Paymentr 730 Days -November 1.2007 aaysordates Net Changes from previous Change Orders No. 1 to No. 4 Net Changes from previous Change Orders No. 0 to No. 4 $ 560 48 546 ~O L~ , . Days Contract Price prior to this Change Order Contract Times prior to this Change order Substantial Completion: 670 Daxs - Se~tcmber 1.2007 928 046 48 $ 8 Ready for Final Paytttent: 730 Davs -November 1, 2007 . , , days or dates Net Increase (decrease of this Change Order) Net Increase (decrease of this Change Order) $ 86 236 75 One Hundred Twenri (1201 . -- days Contract Price with all approved Change Orders Contract Times with. all approved Change Orders Substantial Complexion: 670 Davs -September 1.2007 $ 9.014,283.23 Ready for final payment: 850 Days -February 28, 2008 days ordates RECOMMEN ED Y ENGINEER: ACCEPTED BY CONTRALTO sy: sy. W is a Eb Co ctor Auth9rized Si tare) Date: 0 g b / 4 1 2 2g~I/`? ..al{11Ift11l /t.. BY OWNER: c~~ ~U~ ClintDolsby, P.E., Public Works Date: l d j t 9 ~d9 Date: aPptov~d by C~-y C~~~ I : Oc~'d~~ Z3, Zpo7 ~~ 'Weerd, $Ilay ~ „ G. B d ,~1 ,~ ~ .~'' City