Loading...
HomeMy WebLinkAboutPW Final Acceptance Letter~jQ/rE IDIAN~ IpAHO February 17, 2009 MDC LLC 4042 W Chinden Meridian ID 83646 RE: JAYKER SUBDIVISION Sewer Construction =Final Acceptance Dear Sirs: MayorTammy de Weerd City Council Members Keith Bird Joe Borton Charles Rountree David Zaremba Installation of this project's sanitary sewer system has been satisfactorily completed in accordance with the approved plans. These system has passed the required tests, in accordance with City of Meridian Standard .Specifications and Drawings, and are hereby accepted by the City for ownership and maintenance. Record drawings submitted to us for this project are also accepted and are being forwarded to the Idaho Department of Environmental Quality. The engineer of record is responsible for cert~cation of the record drawings as to horizontal and vertical location of all sewer facilities installed. In accordance with City of Meridian Standard Spec cations and Drawings, the installation and materials of the sewer is to be warranted against defect by the contractor for a period of one year from the date of this letter Sincerely, ~~ Clint Dolsby Interim City Engineer cc. City Clerk, Water Division, Wastewater Division, File RiverRidge Engineering DEQ Public Works Department . 33 E Broadway Ave, Suite 200, Meridian, ID 83642 Phone 208-898-b500 . Fax 208-898-9551 . www.meridiancity.org