HomeMy WebLinkAboutPW Final Acceptance Letter~jQ/rE IDIAN~
IpAHO
February 17, 2009
MDC LLC
4042 W Chinden
Meridian ID 83646
RE: JAYKER SUBDIVISION
Sewer Construction =Final Acceptance
Dear Sirs:
MayorTammy de Weerd
City Council Members
Keith Bird
Joe Borton
Charles Rountree
David Zaremba
Installation of this project's sanitary sewer system has been satisfactorily completed in
accordance with the approved plans. These system has passed the required tests, in
accordance with City of Meridian Standard .Specifications and Drawings, and are hereby
accepted by the City for ownership and maintenance.
Record drawings submitted to us for this project are also accepted and are being forwarded to
the Idaho Department of Environmental Quality. The engineer of record is responsible for
cert~cation of the record drawings as to horizontal and vertical location of all sewer facilities
installed.
In accordance with City of Meridian Standard Spec cations and Drawings, the installation and
materials of the sewer is to be warranted against defect by the contractor for a period of one
year from the date of this letter
Sincerely,
~~
Clint Dolsby
Interim City Engineer
cc. City Clerk, Water Division, Wastewater Division, File
RiverRidge Engineering
DEQ
Public Works Department . 33 E Broadway Ave, Suite 200, Meridian, ID 83642
Phone 208-898-b500 . Fax 208-898-9551 . www.meridiancity.org