Loading...
HomeMy WebLinkAboutTask Order No. 10006 with Murray, Smith & Associates for On-Call Collection System Engineering ServicesEXHIBIT A TASK ORDER NO.10006 ON-CALL COLLECTION SYSTEM ENGINEERING SERVICES CITY OF MERIDIAN This Scope of Services is for Professional Services between Murray, Smith & Associates Inc. (MSA) and the City of Meridian, Idaho. Services authorized by this Task Order No.10006 shall be for professional engineering services in support of the City's Collection System. The terms of this Task Order shall be in accordance with the MSA Master Agreement for Professional Services dated June 18, 2007. BACKGROUND Shad Roundy and David Stangel have supported the City's collection system model periodically since 2005. The initial project included converting the City's HYDRA collection system model to a model based on EPASWMM. This project also included validating the basic operation of the model to ensure that the results matched those generated from the previous HYDRA model. At the conclusion of the model conversion, a number of recommendations were made for additional wet weather calibration and evaluation of the appropriate "design storm" for use by the City. City Staff have noted significant infiltration and inflow issues within the system that could cause the WWTP to exceed its permitted flow rate. The City desires a plan to enable the identification of where the IBcI is occurring and potential mitigation steps for addressing it. SCOPE OF SERVICES -TASK 1 MSA will provide on-call technical support to the City on a tame and expenses basis. The on-call work may include, but is not limited to the following tasks: • Development of an initial flow monitoring plan for spring rainfall events in 2009 that could include: o Identification of near term flow monitoring locations o Recommendations for near term CCTV inspections o Review of CCTV logs o Assistance in placing flow meters and collecting flow data o Rental of flow meter equipment ° o Assistance in other sewer system inspection • Development of a longer term I&I reduction scope of work • Sewage Collection System Modeling in support of development reviews and development scenarios • Additional calibration support identified previously including: o Identify appropriate storm depth and storm distribution from historical records for use in wet weather modeling runs o Delineation of wet weather sewer catchments o Perform wet weather calibration • Additional engineering support for planning or design Meridian, ID HURRAY, SMITH & ASSOCIATES, INC. Collection System February 2009 EngineerslPlanners 1 . MSA will communicate with the City via conference calls, web meetings, and/or visits to the City as needed to gather project specific information and discuss tasks. Assumptions: MSA will provide requested support to the City up to the defined budget. This on-call scope is intended to provide some initial support to the City with the understanding that a larger effort will ultimately be required under a sepazate scope of work. BUDGET The overall Not-to-Exceed Budget for this scope of work is $24,500. The work will be billed on a time and expenses basis. MSA staff billing rates will be adjusters annually. The total budget for this Task Order shall not be exceeded without written authorization. If additional tasks aze requested beyond the initial budget allocation, MSA will provide a task specific scope and budget for each support request from the City. The City will provide email or hazdcopy authorization to MSA to proceed based on the scope and budget provided. Assumptions, deliverables, schedules, and data requests will be outlined in each task specific scope. Table 1 Labor Hours and Total Project Costs Task Nuunber Labor Hours Total Cast Task 1- On-Call Services 210 $24,500 Project Totals 210 $24,500 TIlVIE OF PERFORMANCE The completion date for this Task Order is 365 calendar days from Authorization to Proceed. MSA will make every effort to complete the work in a timely manner; however, it is agreed that MSA cannot be responsible for delays occasioned by factors beyond its control, nor by factors that could not reasonably have been foreseen at the time this Task Order was executed. Meridian, ID HURRAY, SMITH & ASSOCIATES, INC. Collection System February 2009 Engineers/Planners 2 Tammy d e r Mayor .~~`~~ Date: ~' ~ ~,~ .~`_~c` Attest: Jaycee Date: blic rks ~~~uunu~''i Of ~•, i~ i F o REAL ~, T ts~c •~ P.~~•`` ,,. ~crvrt ~' ~~ I~~~~~~mrn um~~~~~~``` Date:. ` Z~~1~1 axing Date: d~sr~ O Approved by City Council: 3 " 3 `a00°~ Murray, Smith & Associates Inc. By: Title: G+nc-~. ~ ~ Date: ~ ~~.~ l~ Meridian, ID MURRAY, SMITH & ASSOCIATES, INC. Collection System February 2009 EngineersJPlanners 3