PROJECT: IiAERIDIAN CITY HALL - Phase 4 Plaza 8 SI~e Irrtproverrtertt
The Contractor is hereby dh+es~rl to make the idloxdrrg ctrerrges 1'r~n the Coatraet Documer~fia and Plans.
Descriptlmr: Incor~rate rev~tons per A8t#166. RFt8183 8 M>se. Cfmrtg~
ALL OTHER TERMS RAID CONOITIOM8 REt4UdN THE SAME
Reason for Budged Contract Artrerulrnent Additlonal scams or revisiorrs per listed AS4 RF7, 8 Changan
Attach :Change hems p11on, datedilNlgdB, with eonbecioor qty
CHANGE tM CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original COntraict Price $194,585.00 Ori9Nre1 Cow Tines: Sutai Comp~tion ~28t08
Alet changes form prevbaus Budgeted Corrteact Amendment Alec changes form previous Budgeted Contrast Arrrendmern:
Aio. ~ to 01 No._ to _ (calendar days)
$6,398.00 Mare
Contract Price Prior M the Budgeted Contract Amendment: Corttrad Times prier to this Budgeted Contract Amendment
(ca[ertdar daye w date)
$200,983.00 u2eriooe
Net Increase (datnseee) of the Budgeted Contract Amerrdnuurt: Net Increase (decrease) of this Budgeted Contract Arrrerrdrner~
(~lw~ days ord~a)
$5,198.00 Alarre
Contras! Pr~::e with afl Approves Budgeted Contract Contract Times with all Approved Budgeted Contract
Arrrendmer-t Amendment:
( days)
$206,181.00 1 Comply 8!28!2008
RECOMMEAIbEb: (CONSTRUCTdOAI
Petra IrtG. EPTED: (CO )
~pha Masonry
'?~'
By: Thomas R. Coughlin ~~
By: Daryl Golemen
Date: ~/ ~~ ate: //
APPROVED: (cmr ~ AGE
////////// COIJNC APPROVAL
By: Keith Watts
/ /-~
Date: _ t l~ ~ C.J
~~'
APPROVED: (CITY) - TTEST;
By: ARaysr Tammy de Weerd By: Cittr C~Hc, Jaycee Harman
Date: ~:
CHANGE ORDER
~~~~~~~ .ooooz
323-45~ ~~ NOV 21 ~00~
>sots~, mnxo
1097 N. R~ARIO STREET • MERIDIAN. ID 83642 • 14iONE: (Z~) 323-4500 • FAX: (2~ ) 323-4507
TITLE: ASI, RFT & Misc. Changes Phase IV DATE: 11/11/2008
fPRQ7ECT: Meriden City Mall ~B: 060675
TO: Attn: Daryi Coleman CONTRACT NO: 41
Alpha Masonry
2645 S. Sut>staUon itd
Emmetk, ID 83617
Phane:208-365-1367 Fax: 208-~i5-4606
RE: To: From: Numb:
DRON OF CHANGE
**AII taxes are lnch~ded in oosts**
7ao~ Tax Net
Item Des~iptlon Q~ttity Uniics Unit iPrioa 1Rate A ira~mt Amount
~- 0~1 AS[#156 Plaza VYa6et' Feature ~ (c~t~o4~- Ir~stan ~ veneer 1.000 LS $isi2.aa o.00% x.00 $2,812.00
around wars at bah entry pow. Alpha DFA dated 10/6/08 ($1733.00). Furn~
new wp stw~e at canal water fealarre tTor rewaic ~ vriers. Alpha DFA dated
10/16/08($1079.00)
00002 Irrflll bride at Main entry canopy ar~axl steel Alpha DFA dales 1.000 LS $600.00 0.00°Yo x.00 $b00.00
8/24/08
00003 RFI#193 Provide sdld qp ~ anal water feature ' ~ nom, ~ perimeter cap 1.000 15 $26o.m 0.0090 $0.00 $260.00
stotres. Alpha ~A dates 8/17/08
00004 Provide tx~c on exposed wall on crest end of t~ water feature, per 1.000 LS $1,526.00 O.OO~o $0.00 $1,526.00
Land~ape Ardt instrtxtlons, not shown on drawrings. Alpha DFA dais 8/24/08
UnR Cost: $5,198.00
Unit Tax: $0.00
Lump Sum: $0.00
Lump Tax: $0.00
0.0% GC rtmrlap: ;~~
Total: $5,198.00
Title ~lglnal Con#r~ct Sum was ................................................................................................. #194,585.
Net Change by Pneviiousiy Authorized Requests and t~anges ................................................ $6,3~8.~
The Contract Sum f?Nor to This Change Order was .......„............~ ............................... $200,983.
'Tim Contract Sum Will be Incxeased ................................................................................... $5,198.00
'The New Contract Sum Including This Change Otrd~ ...................................................... ~20S,18i.00
Th@ Contract Thtte Mull Not t3P1 ChBnged .....................„..........................................,...............
The Date of Su~rtt3al CompieNon as of tltds Change Order Ther~'are ~ ...~ ........................
ACCEPTED:
Alpha M ry
Daryl Coleman
Date: / ~, O ~
Ecpal$bn
)Petra 1
BY~
Tom ou in /1
Date: ~~ ® (/
fi,CA Ar~hitet
~ ~~ Steve Christensen ti
Date: V~ 6~ 3 ~ C ~