Loading...
HomeMy WebLinkAboutTask Order No. 10003 with DC Engineering for WWTP SCADA Automation___ ~~ ENGINEER/NG December 3, 2008 Mr. Clint Dolsby City of Meridian Public Works Meridian City Hall 33 E Broadway Ave Suite 200 Meridian, ID 83642 Subject: Meridian Waste Water Treatment Ptant SCADA Automation Task Order Mr. Dolsby, A40 E. Corporate Orivg 3u8a 103 Marldlan, Idaho 83842 Phone: 208.288.2181 Fax 208.288.2182 Thank you for the opportunity to provide you with this propped task order to complete the automation of the W WTP. The foAowing is our proposed Scope of Service tn~d on the SCADA t+elmrt provided to you on Oct. i ~ 2008. Task Order Understanding We understand that this task order will provide services to implement the automation of the W WTP corttroi systems as outlined in the SCADA report. Those services included installation of electrical wiring, devices, and progranuning necessary to modify existing control schemes which will allow the plant to operate in an automated condition during normal operating conditions. The system also takes into considen~on automatic re-start after the loss of power and providing and implementation of redundant SCADA computers to eliminate the existing possible single point of failure. The task order includes a new laptop that will be capable of accessing the SCADA system from off site for monitoring plant status and alarms by administration and on call personnel. Services Provided • Meet with plant staffto coordinate SCADA security and screen requirements. • Install new switches and modify electrical wiring in control panes to allow for both automated and manual override. • Coordinate PLC interface with new equipment and system integration. • Comptete the PLC programming as requrred. • Complete the WonderWare and SQL Server programming. • Commissioning and testing on an individual and site basis. • Set up and programming for 3 new PC's and one laptop. • Coordinate with the City Public Works and W WTP personnel regarding off site access requirements for security and plant HMI interface r~uirements. • Provide SCADA training for plant staff urn completion of project. • Custom Electric will be subcontractor and bill directly to the City (fees included) Deliverables • Electronic copies of all PLC and WonderWare programs u~d for the project. • Hard copies of all PLC programs used for the project. DC Enghns3ring 4 new programmed computers to interface with the SCADA system. • New/Upgrade Wanderware licenses necessary far networking new PC's • Testing acid training on all new automabetl systems. Fee Services for Task Order No, 10x03 shall be completed under the conditions contained in the Master Services Agreement betwan the City and DC Engineering dated Jamrary, 20(}7. The project will be completed an a time and material basis not to excxed $75,000.00 (Severity Five Thousand Dollars). Thank you again for the opportunity to work with you. If yon have arty questions, yr require additional infarrnation, please do not hesitate to ask See attaches breakdown for additional information. Sincerely, DC ENOI1vEERING, P.C. David Cutbirth, PE President Accepted by: Printed Name ~n~.~,tir, ~~'`~ ~ro, ~ Title '~?gl~ Owner CITY F MERIDIAN By: Name: Mayor T de Weerd Approved by City Council: ~ -3 -~.OC~ [CORPORATE SEAL] .~`~.~ O~ ~ERIp~ ''~ Atte - Jaycee Holman, City Clerk = ~ ~~ Address for giving notices ~~''i.~ L'OI~~'`( • ~ `~~~` 33 East Broadway Ave. Meridian, ID 1pb42 Purchasing l~ Enghte~ing