Loading...
HomeMy WebLinkAboutTask Order No. 10002 with CH2M Hill, Inc. for Odor Control StudyTASK ORDER NO.10002 UNDER THE MASTER AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN CITY OF MERIDIAN AND CH2M HII.L, INC. This Task order is entered into by and between City of MERIDIAN (OWNER) and CH2M HILL, Inc. (ENGINEER), according to the terms and conditions of the Master Agreement (AGREEMENT) for Professional Services, dated January 1, 2007. See Attachments A and B for the Scope and Fee for Task 10002. All other terms and conditions of the original agreement will remain in full force and effect. IN WITNESS WHEREOF, the parties execute below: For CHZM HILL, Inc. dated this ~ day of ~//$ , 2009. Name Title For City of Meridian dated this day of 2009. ```~~~~~~-~uur By: ~ M! de JlVeerd, Mayor HLLe L: 1 L/ Vt ~ aycee Holman, City Clerk ~ c` Approved By City Council: ~ ~ % "9p ~~'r ts~ • 1 .20 ,~` v' chasing ~_ ~ ~o~'r Public Works Attachment A Scope of Services Odor Control Study Project Understanding The City of Meridian would like to control odors from the Headworks at their wastewater treatment plant. This study will provide a review of treatment alternatives and enclosure options, and recommend a course of action for odor control facilities. Scope of Work CHZM HIL.i, will perform the following tasks as part of this scope of work. Task 1--Project Management Project management includes project scoping, staff management, task coordination, monitoring project progress, preparing invoices, and overseeing project quality control. Task 2 Technology Evaluations Housekeeping, process configuration and odor treatment technologies will be reviewed. Housekeeping and process configuration items, including nLnimi~ing weir drops, scum removal practices, Yni,,;,,,;7;,,gtucbulence, and screenings handling will be reviewed. Up to four odor control technologies will be evaluated. These include biofiltration (organic and inorganic), chemical scrubbing, biological towers, and the Bioway Odor Control process. The criteria for evaluation includes: H2S removal efficiency, size of footprint, and estimated cost. Task 3-Enclosure Evaluation An analysis of the estimated cost of enclosing the Headworks with a building either of metal or masonry will be provided versus the estimated cost of covering the channel only. The results of the analysis will be included in the Preliminary Engineering Report submitted to IDEQ. Task 4~Evaluation Report An evaluation report will be written that will sunwnarize the analyses of Tasks 2 and 3. This report will be the sole deliverable for this project. Four copies of the draft report will be submitted to the City for review and comment. A meeting will be held to discuss the results of the technology and enclosure evaluations. DC Engineering will provide electrical engineering support for this report. Attachment B Compensation Level of Effort The task level of effort estimates are summarized in the following table. CH2M HILL has developed this level of effort estimate based on the work plan presented herein and assumptions stated previously. The fees will be billed as time and material, and will not exceed the total amount below without prior approval by the City. Level of Effort Task Description Tota! Task i Project Management $2,155 2 Odor Control Technology Evaluation $g 509 3 Enclosure Evaluation $3,775 4 Evaluation Report $5,443 Summary - AEI Tasks $17,882 Schedule The schedule is listed below: • Draft report submitted to City - 4 weeks after NTI'