HomeMy WebLinkAboutChange Order No. 2 with Brown Construction, Inc. for Black Cat Trunk Sewer Phase 4 (2)CHANGE ORDER 2 PROJECT: North Black Cat Trunk Sewer DATE OF ISSUANCE: 1/24/08 EFFECTIVE DATE: OWNER: Primeland Development Co. LLP CONTRACTOR: Brown Construction, Inc. ENGINEER: JUB Engineers Page 1 of 3 You are directed to make the following changes in the Contract Documents. Attachments: CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price Original Contract Times $ 1,717,487.31 Substantial Completion: 168 Davs - Mav 1, 2008 Ready for Final Payment: 213 Davs -June 15, 2008 days or dates Net Changes from previous Change Orders No. 1 to No. Net Changes from previous Change Orders No. 1 to No. 1 $ (23 198.00) o , Days Contract Price prior to this Change Order Contract Times prior to this Change order Substantial Completion: 168 Davs -Mav 1.2008 $ 1,694,289.31 Ready for Final Payment: _ 213 Days -June 15.2008 days or dates Net Increase (decrease of this Change Order) Net Increase (decrease of this Change Order) $ 400 00 o.s . says Contract Price with all approved Change Orders Contract Times with all approved Change Orders Substantial Completion: Days -168.5 $ 1,694,689.31 Ready for final payment: Days -213.5 days or dates RECOMMENDED BY OWNER: B. Date: ~'~ /Q~I APPROVED BY OWNER: Date: __Z I19~ob' ACCEPTED BY C AC OR: By: Date: ~ ^ ~ / ~ ~ " ~~z ~~~ Tam~rtiy d eerd, Mayor i~ G (~ Date: ~ ~ f/ % ' D d" Approved by City Council: Z~ \\\`\\\\\~,~t~,~ll 11 nllrrlJ~~``a~P,,', ~~ ~ r~~ ,' Attest: _ ~, Cit r~L _ ~a.~CQrE Nd~wta~n 1 Date: r 1~ • ~~ ~ ®~. ~ `q`a ~'/,`~IIIIIf PI 11 tIV1141,`0 W .+~ North Black Cat Sewer Proiect Change Order #2 Brown Construction was required to remove concrete from the connection point at manhole # lA in order to make their connection to this manhole. This required 2 men for 4 hours each utilizing hammers and pry bars. No one seemed to know why this connection point was sealed off. The labor rate for this work is $50.00 per hour as is identified in the attached rate sheet as provided by Brown Construction. Glenn Fitch Project Manager Primeland Development Co. LLP Y t .'(~ f ~ 3rf,' -fig ~ `~ °-~ 'z'- mfa y~ 77 ~ F _ e•.. '::.r EQUII'MENT RENTAL PRICE LYS~': 325 EXCAVATOR 140.00 320 EXCAVATOR 125 ~ 330 EXCAVATOR 155.00 350 EXCAVATOR 175 00 410 BACKHOE 70 ~ - 936 LOADER 85.00 938G WHEEL LOADER 95.04 ~~ 95.00 SWEEPER 55.00 LABOR/MAN 50.00 FOREIVIA~1 W/TRUCK 70.00 DUMP TRUCK 70.00 END DUMP ~.~ 345 EXCAVATOR 175.00 950 LOADER 105.00 966 LOADER 115.00 375 EXCAVATOR 190.00 MOXIE TRUCK 140A0 WATER TRUCK 95.00 R®'~D GRADER 110.E 330 EX. W/FL~IMIVJER 390.00 ~~~ ~~ '0~~~12'/ ~ ~~~ ~y