Loading...
HomeMy WebLinkAboutTask Order No. PKS 09-002 with STRATA for 8th Street Park Pedestrian Pathway and Box CulvertsTASK ORDER NO. PKS-08-042 CITY OF AERIDIAN (OWNE#t) AND STRATA (CONSULTANT) This Task Order Is issued by Owner and accepted by the Consultant pursuant to the mutual promises, covenants and conditions contained in the Mast®r Agreement between the above named parties dated December 13th, 2006. CITY OF MERIDIAN 8s' Street Park Pedestrian Pathway ~ Box Culverts -Phase 1 PURPOSE Tha Consultant's scope of sarvioes and compensation shall be as set forth herein. Services shall generally tte described as testing and inspections consulting services. TASK 1-Testing and Inspectlorus Consuiting Services Par the City's request, the Consultant w~l provide professional testing and inspections consulting services relating to the construction of the S'~ Street park Pedestrian pathway & box Culverts -Phase 1 project. These servioas are listed in STRATA's December 22, 2008 Cost Estimate (Attachment A). ,~ d . COMPENSATION The Not To-Facceed amount for Task Order No. PKS-09-002 is One Thousand Seven Hundred Nine Two and 40!100 do0ars ($1,792.40). CONSULT T ( thorized R®presentative) ~- ~~~ c~ Date Approved by City Council: 1- 2 ~ ~- d9 Date TASK ORDER NO. PKS-09-002 CITY OF MERIDIAN (OWNER) AND STRATA (CONSULTANT) CITY OF MERIDIAN 8~' Street park Pedestrian Pathway 8 Box Culverts -Phase 1 ATTACHMENT A ~~ S T R ?_-T a .+.••~..n.nw,•xmn u~aa.na~n ~:...a• ~. v.~vp: ,~iyfj, fio.. ICY.. ~iwnd Yr TO: CITY OF MERIQIAN QUOTE DATE: 12!22/2008 MAX JENSEN PHONE: 885-4433 CITY OF MERIOUW, PUBLIC WORKS DEPT. FAX: 887-4813 t~UOTE NUMBER: BP08469 PROJECT: 8th Street Park Pedestrian Pathway 8 box Culvert COST ESTIdAATE tTEM DESCRIPTION EST QUAD UNPT P_R~F ESTIMATED COST SOILS TESTw©& INSPECTION• 1) Technician far subgrade & structural fill density, per hr. 24A 43.00 1032.00 (8 Trips {~ 3hr each) 2) Nuclear density gauge, per hour. 24.0 12.00 288.00 A~ISCELLANEOUS 6) Mileage, 8 trips ~ 54 miles each, 432.0 0.70 302.40 7) Project Management 2.0 85.00 170.00 $) Overtime surcharge, if over, 8hrs/day, 40hrs/week, 0.0 21.50 0.00 9) weekends or holidays, per hour. 0.0 ~ 0.00.8 0.00 The above listed services will be provided for the estimated fee of 1 82.40 The services described above are based on our revtew of the plans. The cost shown are based upon the estmated quantlties Indicated and dependent upon the contractor's schedule and partormance. These fees represent the amount of tes8ng required from our knowledge of the project document. if the quantities change, a corresponding change In cost will occur. All prices include supervision and report, The above scope of services will be performed according to the terms and candltions desrrlbad !n the attached agreement for services. We will need at least 24 hours notice tti schedule our personnel. _j ~~~~~ Brian Shetler, Project Manager IDAHO MONTANA NEVADA OREGON UTAH WASHINGTON WYOMING www.stratageotech.com 8683 W. Hackamor9e Drive Boise, Idaho 83709 P.208.378.8200 F.208.376.8201 8th st box culvert repiacemen# PURPOSAL