Loading...
HomeMy WebLinkAboutStandard Form of Agreement with Knife River for Black Cat Trunk Sewer Phase 4t c FORM 00500 STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR Taken From 2007 ISPWC For the CITY OF MERIDIAN BLACK CAT TRUNK SEWER PHASE 4, SCHEDULES B & C ADA COUNTY, IDAHO CITY OF MERIDIAN BLACK CAT TRUNK SEWER PHASE 4, SCHEDULES B & C ADA COUNTY, IDAHO STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR ON THE BASIS OF A STIPULATED PRICE THIS AGREEMENT is by and between the City of Meridian (hereinafter called OWNER) and Knife River (hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: ARTICLE 1-WORK CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Project consists of construction of approximately 2,493 lineal feet of 27-inch PVC gravity sewer, 1,9461ineal feet of 10-inch PVC gravity sewer, 165 lineal feet of 8-inch gravity sewer, asphalt, sod and other surface repair, manholes, dewatering, lift station abandonment, traffic control, storm water management, trenching, and other related and miscellaneous work. It is the intent of these documents to describe the work required to complete this project in sufficient detail to secure comparable bids. All parts or work not specifically mentioned which aze necessary in order to provide a complete installation shall be included in the bid and shall conform to all Local, State and Federal requirements. ARTICLE 2 -THE PROJECT 2.01 The Project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: Black Cat Trunk Sewer, Phase 4, Schedules B & C ARTICLE 3 -ENGINEER 3.01 The Design Engineer is J-U-B ENGINEERS, Inc., 250 S. Beechwood Avenue, Suite 201, Boise, Idaho 83709. The Construction Project Engineer is the City of Meridian, hereinafter called ENGINEER, and who is to act as OWNER's representative, assume all duties and responsibilities, and have the rights and authority assigned to ENGINEER in the Contract Documents in connection with the completion of the Work in accordance with the Contract Documents. ARTICLE 4 -CONTRACT TIlVIES 4.01 Time of the Essence A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents aze of the essence of the Contract. 00500 - 1 4.02 Days and Dates to Achieve Substantial Completion and Final Payment A. The Work will be substantially completed as listed below: 1. Bid Schedule B ~~ ~~ s The work will be substantially completed within 120 days after the date when the contract times commence to run as provided in paragraph 2.03 of the General Conditions and completed and ready for final payment in accordance with paragraph 14.07 of the General Conditions within 140 days a~~fter/the date when the contract times commence to nw. 4.03 Liquidated Damages A. CONTRACTOR and OWNER recognize that tune is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 4.02 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. The parties also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty), CONTRACTOR shall pay OWNER $500 for each day that expires after the time specified in paragraph 4.02 for Substantial Completion of each milestone date listed until the Work is substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, refuse, or fail to complete the remaining Work within the Contract Time or any proper extension thereof granted by OWNER, CONTRACTOR shall pay OWNER $500 for each day that expires after the time specified in paragraph 4.02 for completion of each milestone date listed and readiness for final payment until the Work is completed and ready for final payment. ARTICLE 5 -CONTRACT PRICE 5.01 OWNER shall pay CONTRACTOR for completion of the Work in accordance with the Contract Documents an amount in current funds equal to the sum of the amounts determined pursuant to paragraphs S.O1.A. A. For all Work, at the prices stated in CONTRACTOR's Bid, attached hereto as an exhibit. ARTICLE 6 -PAYMENT PROCEDURES 6.01 Submittal and Processing of Payments A. CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions. 6.02 Progress Payments; Retainage A. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR'S Applications for Payment on or about the 25th day of each month for work through the last day of the preceding month during performance of the Work as provided in paragraphs 6.02.A.1 and 6.02.A.2 below. All such payments will be measured by the schedule of values established in paragraph 2.07.A of the General Conditions (and in the case of Unit Price Work based on the number of units completed) or, in the event there is no schedule of values, as provided in the General Requirements: 1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below but, in each case, less the aggregate of payments previously made and less such amounts as ENGINEER may determine or OWNER may withhold, in accordance with paragraph 14.02 of the General Conditions: a. 95% of Work completed (with the balance being retainage); and b. No payment for cost of materials and equipment not incorporated in the Work. 00500 - 2 2. Upon Substantial Completion, OWNER shall pay an amount suiflicient to increase total payments to CONTRACTOR to 95% of the Work completed, less such amounts as ENGINEER shall determine in accordance with Article 14 of the General Conditions and less 100% of ENGINEER's estimate of the value of Work to be completed or corrected as shown on the tentative list of items to be completed or corrected attached to the certificate of Substantial Completion. If, at Substantial Completion, the character and progress of the work has been satisfactory, the OWNER may, at the OWNER's sole discretion, reduce the amount of retainage being held. 6.03 Final Payment A. Upon final completion and acceptance of the Work in accordance with paragraph 14.07 of the General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said paragraph 14.07. ARTICLE 7 -INTEREST 7.01 All moneys not paid when due as provided in Article 14 of the General Conditions shall beaz interest at the rate of 7% per annum ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS 8.01 In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following representations: A. CONTRACTOR has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents. B. CONTRACTOR has visited the Site and become familiaz with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. C. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, and performance of the Work. D. CONTRACTOR has cazefiilly studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in paragraph 4.02 of the General Conditions and (2) reports and drawings of a Hazardous Environmental Condition, if any, at the Site which has been identified in the Supplementary Conditions as provided in paragraph 4.06 of the General Conditions. E. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or perfom~ance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by CONTRACTOR, including applying the specific means, methods, techniques, sequences, and procedures of construction, if any, expressly required by the Contract Documents to be employed by CONTRACTOR, and safety precautions and programs incident thereto. F. CONTRACTOR does not consider that any fiuther examinations, investigations, explorations, tests, studies, or data are necessary for the perfom.~ance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. G. CONTRACTOR is aware of the general nature of work to be performed by OWNER and others at the Site that relates to the Work as indicated in the Contract Documents. H. CONTRACTOR has correlated the information known to CONTRACTOR, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents. 00500 - 3 I. CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies that CONTRACTOR has discovered in the Contract Documents, and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR J. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. K. The CONTRACTOR is an appropriately licensed public works contractor per Section 54-1902 (Idaho Code). L. The CONTRACTOR will submit within 30 days of the date of this agreement a Public Works Contract Report (Form WH-5) to the Idaho State Tax Commission in compliance with Section 54-1904A and 63-3624(f), Idaho Code. ARTICLE 9 -CONTRACT DOCUMENTS 9.01 Contents A. The Contract Documents consist of the following: 1. This Agreement (pages 1 to ,inclusive); 2. Performance Bond (pages to ,inclusive); 3. Payment Bond (pages _ 4. Other Bonds (pages a. b. c. 5. Certificates of Insurance (pages to ,inclusive); (pages to ,inclusive); (pages to ,inclusive); 6. General Conditions, Division 100 of the 2007 Idaho Standards for Public Works Construction (ISPWC). 7. Project Manual. 8. Owner's Supplementary Conditions, Form 00810. 9. Standard Specifications and Standard Drawings - 2007 Idaho Standards for Public Works Construction (ISPWC). 10. Owner's Revisions to the Standard Specifications and Special Provisions (pages 1 to ,inclusive). 11. Ada County Highway District latest Supplemental Specifications to ISPWC. 12. TI'D RO.W. Encroachment Permit 13. Plans consisting of a cover sheet and sheets numbered 1 through ,inclusive with each sheet bearing the following general titles. City of Meridian Black Cat Trunk Sewer, Phase 4, Schedules B & C Ada. County, Idaho 14. Addenda (numbers to ,inclusive); to ,inclusive); to ,inclusive); 00500 - 4 15. Exlu~bits to this Agreement (enumerated as follows): a. CONTRACTOR's Bid (pages to ,inclusive); Form 00300 b. Contractor's Affidavit Concerning Taxes, Form 00710 c. Notice of Awazd, Form 00450 d. Notice to Proceed, Form 00720 e. Documentation submitted by the Contractor prior to Notice of Award 16. The following which may be delivered or issued on or after the Effective Date of the Agreement and aze not attached hereto: a. Written Amendments b. Work Change Directives c. Change Order(s) d. Application for Payment e. Certificate of Substantial Completion B. The documents listed in paragraph 9.01.A aze attached to this Agreement (except as expressly noted otherwise above). C. There aze no Contract Documents other than those listed above in this Article 9. D. The Contract Documents may only be amended, modified, or supplemented as provided in paragraph 3.05 of the General Conditions. ARTICLE 10 -MISCELLANEOUS 10.01 Terms A. Terms used in this Agreement will have the meanings indicated in the General Conditions. 10.02 Assignment of Contract A. No assignment by a party hereto of any rights under or interests in the Contract will be binding on another party hereto without the written consent of the party sought to be bound; and, specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction maybe limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 10.03 Successors and Assigns A. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns, and legal representatives to the other party hereto, its partners, successors, assigns, and legal representatives in respect to all covenants, agreements, and obligations contained in the Contract Documents. 00500 - 5 10.04 Severability A. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon OWNER and CONTRACTOR, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision. IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement in duplicate. One counterpart each has been delivered to OWNER and CONTRACTOR All portions of the Contract Documents have been signed or identified by OWNER and CONTRACTOR or on their behalf. ~ ~ ~ This Agreement will be effective o ~ ~Y(which is the Effective Date of the Agreement). OWNER: William G. Berg, Jr.~yil~~~ Qom` 'sAS,s//~ ~~~ll ~~ 11i1\\~~~~\\a~e Approved by City Council: / ~ /Q,~~O Address for giving notices: 33 East Idaho Ave Meridian, ID 83642 (If OWNER is a corporation, attach evidence of authority to sign If OWNER is a public body, attach evidence of authority to sign and resolution or other documents authorizing execution of OWNER-CONTRACTOR Agreement.) CO~N/TRACTOR: ~ 71 /V1FE /Cl V'E~Q BY• .~~~/ [CORPORATE S Attest Address for giving notices: ISE ~ / ~ '83~7~9 155,1{ ~A- ~ - e2. License No. (Where applicable) Agent for service of process: (If CONTRACTOR is a corporation or a partnership, attach evidence of authority to sign.) Designated Representative: Name: Title: Address: Phone: Facsimile• Designated Representative: 00500 - 6 l1TT~) l1T l IT!T Tr\ T ~ l~ T . \ \ ~ , + ~ ~ ~ 0 1 i 1 ~ % r / / i l . .._ ..~ Bid Form PROJECT IDENTIFICATION: City of Meridian Black Cat Tnmk Sewer, Phase 4, Schedule B Ada County, Idaho CONTRACT IDENTIFICATION AND NUMBER: THIS BID IS SUBNIITTED TO: DELIVER TO: MAIL TO: City of Meridian same , City Hall, City Clerk's Office 33 East Idaho Avenue Meridian, Idaho 83642 (208)888-4433 1.01 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with OWNER in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other temps and conditions of the Bidding Documents. 2.01 Bidder accepts all of the terms and conditions of the Advertisement or Invitation to Bid and Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. The Bid will remain subject to acceptance for 60 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of OWNER 3.01 In submitting this Bid, Bidder represents, as set forth in the Agreement, that: A. Bidder has examined and carefully studied the Bidding Documents, the other related data identified in the Bidding Documents, and the following Addenda, receipt of all which is hereby acknowledged. Addendum No. Addendum Date Signature or Initial 1 ttgd ~_ a. V 119 ~ra.~' B. Bidder has visited the Site and become familiar with and is satisfied as to the general, local and Site conditions that may affect cost, progress, and performance of the Work. C. Bidder is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress and performance of the Work. D. Bidder has carefiilly studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in paragraph 4.02 of the General Conditions, and (2) reports and drawings of a Hazardous Environmental Condition, if any, which has been identified in the Supplementary Conditions as provided in paragraph 4.06 of the General Conditions. E. Bidder has obtained and carefully studied (or assumes responsibility for having done so) all additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying the specific means, methods, techniques, sequences, and procedures of construction expressly required by e Bidding Documents to be employed by Bidder, and safety precautions and programs incident thereto. 00300 - 1 F. Bidder does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents. G. Bidder is aware of the general nature of work to be performed by OWNER and others at the Site that relates to the Work as indicated in the Bidding Documents. H. Bidder has correlated the infom~ation known to Bidder, information and observations obtained from visits to the `, Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents. I. Bidder has given ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and the written resolution thereof by ENGINEER is acceptable to Bidder. J. The Bidding Documents aze generally sufficient to indicate and convey understanding of alI terms and conditions for the performance of the Work for which this Bid is submitted. 4.01 Bidder further represents that this Bid is gemiine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; Bidder has not directly or indirectly induced or solicited any other Bidder to submif a false or sham Bid; Bidder has not solicited or induced any individual or entity to refrain from bidding; and Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over OWNER. 5.01 Bidder will complete the Wark in accordance with the Contract Documents for the following price(s): BASE BID SCHEDULES CITY OF MERIDIAN BID SCHEDULE -BLACK CAT SEWER -PHASE 4, SCHEDULE B SPEC. PAYMENT ITEM DESCRIPTION EST. REFERENCE ------------------------------------------------------------------ (Unit Price/Lump Sum Price written in words} QIiAPITITY UNIT UNIT PRICE TOTAL PRICE 307.4.1.A.3 Miscellaneous Surface Restoration (Sod) -------------------------- ------ ------------------------------= 851 LF ~(J 3 a0 3t 3 7( For - 2b • . o o, 307.4.1.A.9 Miscella eous Surface Restoration (Stormwater Retention Pond)-- -- ------- r----------------- ------ --------- 193 LF 307.4.1.F5 ype "P Surface Restoration - - - - ---------- --~ -~-------------------~------- 329 LF t~ ' ~ O ~ ~~ ' 7 • / 0 • T 1 307.4.1.F.7 Type " - "Surface Restoration -- - -- - ------- -- -- ---------------------------- - 381 LF as •~l~ ~d 5~1 8 cJi ~~ i its • , 307.4.1.F.9 Type "P-3" dace Restoration -- - --------------------------------- ----------------------- - d- 640 LF 3• a0 a'l to~18 . o0 r r~ 1 , 307.4.1.L.1 Grass Pav s --------------------------------- 100 SY 501.4.1.8.1 Gravity wer Pipe - 2T PVC - 2493 LF -- --------------- ---------_-----~--------------- q - ----- s 8 3 9o act i~a• 501.4.1.8.1 Gra ' Se r Pipe - 8" PVC 100 LF ------------_~iv --------- -----p ---~s--------------------- 35•q® 3,590• 502.4.1.A.1 Sanitary Se er Manhole - 48" Type "A" -- -- --------- - --- - ----- ------ ----- --- -- -- 1 EA ~OO ~ a ~ y~ ~~ S ~ ' ' 50Z.4.1.A.1 Sanitary Sew Manho - 60" Type "B_ ~ t~2 ~OL1SQxlC~ 8' ~ ~ C s _ ----------- - - - - - 5~~?(~•®~ oZ~ -If!Di~.Q 502.4.1.A.1 Sanitary Sewer Manhole - " Type_B_ 6 LF - 502.4.1.C.1 Sanitary Sewer Manhole - 60" Type "B" lastic Lined)---1~h~----- -- ------ ---- --- ------- --- - - 1 EA - ~ , e ~ $,q~lo.Op ~yq~d .vo 502.4.1.F.1 Connect to Existing Manhole , EA - ~ -------- --- -~ - h~ -S\1t ------- ------ ----------------- (c8fo •oo Co 8Cn .oU 502.4.1.G.1 Connect to Existing 2 Sewer Stub ~~~ ~~~ 1 EA - - -- - ------------------~~- --- 105 `la~•~ /~ {~o~I~DUo-~ J 00300 - 2 ~~ a 504.4.1.E.1 Maintain ft Reconnect Sewer Service --~ ~ 4 EA ~ ~ d Leo 507.4.1.E.1 Remove Existing 8" Sewer - - --------------------- a~----- ~ ------------- 266 LF q o a 7 `~ r .~c7 . 507.4.1.H.1 Remove Obstruction -Manhole - FiV---------- ---- -- ------- ------------- ------ -`~,~ 2 EA ~4.(~t~ 1108~.0~ 601.4.1.8.1 Storm Drain Culvert Crossing - ----------------=---- --------- ------- ---- ------ ----- ---- 7 EA I00.OO I '1`100=Ot~ 5 ~ 706.4.1.8.1 Concrete Valley Gutter ---------_--------------- ---- -- ------------------------------- 15 LF ~la yo 3(~.oe~ C r o . c 706.4.1.E.1 Type 1 5 dewa(k Repair ------------------------ -------- -------------------------------- ,>J ~~~ - 20 LF ao•~o ~I~-1.o0 706.4.1.E.3 Type 2 Sidewal Repair ---- - 60 LF ' 706.4.1.E.5 Type 3 Si ewalk Repair -------------------------- ------ -------------------------------- 171 LF ly 't0 ~0513.~v r . 1103.4:1.A.1 Construction Traffic Control - ------- ------------- '~x~e_-~ ~no~ ~ 1 LS 3 '130~00 '13~•rJo 3 0 l , 2010.4.1.A.1 Mobilization ~3afr,,}Q~~ ~~ 1 LS 2020.4.1.F.1 Reference Et Reset Monuments - - - ------------------ ---- --------- ------ ------- 1 EA ~,oo SCx~~ rV I S SP 2102.4.1.A.1 Construction Coordination -- ---- ----------------- ----- --------------- ----- ------------- 1 LS S10•o0 S10•e~c~ 0 SP 2105.4.1.A.1 Se a Bypass Control Systems ------------------- ---- ---------------------------- -~ ------ 1 LS g°71.c~ ~,'71.~0 SP 2142.4.1.A.1 Rem eft Relocate Tree --- ---- ---~ 3 EA /~ U. ® ,` ~~o•~lJ ~ Y VV 1 V ~ SP 2142.4.1.6.1 Remove 8 Replace Tree ----- ---- ----------------- ----- -- --------------- ------ ----- 2 EA ~O.t~ll (~80.0~ L ~ r o 0 ) SP 2216.4.1.A.1 Storm Water Management ~,~-- -- pub ---- ------ - -------------Cl -r - -- --- 1 LS tjap,L~O ~p 5a0,CX~ ~ l , SP 2220.4.1.A.1 Hardin Drain Crossing - ---- ------------~- ----------- --------~----------- ----- -D 5 EA I~100~00 $ ~p.00 ~ ? CITY OF MERIDIAN - B!D SCHEDULE -BLACK CAT SEWER -PHASE 4, SCHEDULE C SPEC. PAYMENT ITEM DESCRIPTION EST. REFERENCE ---------------------------------------------------------------- (Unit Price/Lump Sum Price written in words) QUANTITY UNIT UNIT PRICE TOTAL PRICE 307.4.1.A.3 Miscellaneous Surface Restoration (Sod) ------------------- - ---- ---------- --- --- - -- --- 50 LF ~i5•yo a~a~o.oo 307.4.1.F.5 Type "P-1 urface Restoration - - ----------------------------- ------ -------------- iC- ~71J ~O 1441 LF ~• ~ ~ $~• e 307.4.1.F.11 Type"P-4" urface Restoration ---- - ------------- -------- ---------------------- 438 LF o •w C ~Da~• o~ ax vo . t 307.4.1.F.13 "Asphalt Approach" Repair ----------~ ----------_ ----- ------------------------- ~- - -® 10 SY ~la.~o ~i~$.c~ 405.4.1.A.1 Non-Pota le Waterline Crossing ~~~~®~ - - ---- 1 EA 501.4.1.8.1 Gravity Sewer Pipe - 10" PVC ------------- -------------------------------- ------- ---------- 1946 LF aa ~ ~~,,g5- -~0 50 00~ . 501.4.1.6.1 Gravity Sewe Pipe - 8" PYC ------------------------- ------------------------------ ----- 65 LF o?I.'7o i,~lto.so ~ 502.4.1.A.1 Sanitary Sew r Manhole - 48:Type "A" ~-~A~~~~~y-~ - --------------------- - -------- 3 ~ ~1 a~ ~ g•.~0 DD ( Ck-Y1C~ ~ 1 ~ $ ~ of • Di A 502.4.1.C.1 Sanitary Sewer Manhole - 60" Type "B" Plastic Lined)EI h-~ --_ ~--- ---------------------------------- ---------------- 1 EA 57000 8 50,00 8 a s ~c~u un , , 502.4.1.0.1 Drop Manhole - 60" Type "B" ------------------------- ------------- ---- ------ ---- ------- ~ 1 EA 5,500,0 5,~00~0 ve oo s ~v ou 00300 - 3 502,4.1.F.1 Connect to Existing Manhole ----------------------- ------------------- -~ ----------J --- 1 EA `~~ ~ • ®~ `~ ~ ~ •~~ 507.4.1.H.1 Remove Obstruction -Manhole 1 EA ------- ------- ---- ----------------------- ---- -------------- l v - t ~ S 00 5loi'a • ~ • o0 601.4.1.&.1 Stonn Drain Culvert Crossing - - - ---------------: --------------- -------------- 1 EA g8 .qo gg .~d i s 706.4.1.E.1 Typ 1 Sid walk R air -; ----------------------------- --------------------- ---- ~0 .. LF ^~,'7® OCR ~a''~ ~ O O of . j 706.4.1.E.3 Type 2 Side lk Repair -- - --- ----r -------------- ------ ----------- - - 20 ~ ya: ICS ~ a oo r . 1103.4.1.A.1 Construe n Traffic Control per,-~-r~~~ ---- ---------- ------------------------- ------- - - 1 LS l ~~o~~ ~ gyO,QO E tin r~ r ~ ~ , 2010.4.1.A.1 Mobi zation ~ su1 1 tS r ~®S Iy~3c>,.caD i~,~ado SP 2102.4.1.A.1 Construction Coordination 1 LS lr ~ SUO.00 500 •vO SP 2105.4.1.A.1 Sewage Bypass Control Syst_ems,~.~~~^^ --- -- ---- ----- -- -••--------- ~® ~®lY •-.------- a 1 LS ~ ~d I • ~~ SP 2155.4.1.A.1 Lift Station Abandonment 1 LS SP Z216.4.1.A.1 Storm Water Management 1'1•e. y~^Z _ -- ------------------- ~ ------ - ~- ' -- 1 LS 5So,o0 1 580.00 1 ~ ~y ~ i~o to , , SP 2220.4.1.A.1 Hardin Drain Crossing - .(~ -- P ~ - -------~ ---- ---- ----- ------------- 2 EA 1,550,00 3,IOO.00 J TOTAL OF ALL ESTIMATED PRICES -BID SCHEDULE B & C ($ L~ ~.~,p a 9`1~I . a~ TOTAL WRITTEN INWORDS -BID SCHEDULE B & e . _ 1 _. _ - _._ .__ Unit Prices have been computed in accordance with paragraph 11.03.B of the General Conditions. Bidder acknowledges that estimated quantities are not guaranteed, and are solely for the purpose of comparison of Bids, and final payment for all Unit Price Bid items will be based on actual quantities provided, determined as provided in the Contract Documents. 6.01 Bidder agrees that the Work will be substantially completed and completed and ready for final payment in accordance with paragraph 14.07.B of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement. 6.02 Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the times specified above, which shall be stated in the Agreement. 6.03 Bidder agrees to comply with Idaho Code 44-1001 through 44-1006, regarding employment of Idaho residents. 7.01 The following documents are attached to and made a condition of this Bid: A. Required Bid security. B. Bidder shall include in his Bid the name, addresses, and Idaho Public Works Contractor License Numbers of the Subcontractors who shall, in the event the Bidder secures the Contract, subcontract the plumbing, heating and air conditioning work, and electrical work under the general Contract. If none are required, mark none on form. C. In addition to subcontractors for plumbing, heating and air conditioning work, and electrical work, provide the names and addresses of the additional subcontractors, suppliers, individuals or entities called for in the Instructions to Bidders (include Idaho Public Works Contractor License Numbers for any subcontractors). If none are required, mark none. Y ~ ' rr a 8.01 The terms used in this Bid with initial capital letters have the meanings indicated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions. 00300 - 4 SUBMITTED on ~®/~EMIBEiP 2(~ 2007. Idaho Public Works Contractor License No. 15~~o4~-AAA =~- 02. . Expiration Date ~ANCAAd21P 3/ , ~o 003W - 5 y ~ If Bidder is: An Individual Name (typed or printed): By: Doing business as: Business address: Phone No.: a~ (Individual 's signature) ts~) FAX No.: 00300 - 6 A Partnership Partnership Name: By: (SEAL) (Signature of general partner -attach evidence of authority to sign) Name (typed or printed): Title: Business address: Phone No.: FAX No.: 00300 - 7 ~. ~' A Corporation ~.~ .;~~ -~- } Corporation Name: ~~~~Y~.012 4~- ~DA1S ba ~ !FE ,1~ VEIL (SEAL} By: _ ;,,, (Signature -attach evidence of authority to sign) Name (typed or printed): __L~AV E /uR~/E12 .~ ~ Title: T'/C'ESI DENT• ~ Attest tore of Corporate Secretary) ~':"~) Business address: ~'~Jr ~~ ~i~ ~~.10 ICI EA.f ~IJ .4~ J~U! rJ~ l ~ ~ .3 ~ ~ -9 PhoneNo.:C ~1 t7~Do~-C~I.rJo( FAXNo.: ~~~j~- ~~~ State of Incorporation: C~~ ~ (a d I Type (General Business, Professional, Service, Limited Liability): ~ FNE/e ~{ 1- Date of Qualification to do business is .IL~NUA~y ~" , ~cX~ 3 00300 - 8 CERTIFICATE I, KARL A. LIEPIT'Z, hereby .certify that I am the duly elected and qualified Assistant Secretary of Hap Taylor & Sons, Inc., an Oregon corporation; that the following is a true and correct copy of a resolution adopted by Written Consent of the Board of Directors dated July 17, 2007; and that said resolution has not been modified or amended and is presently in full force and effect: RESOLVED, effective July 2, 2007, all of the officers of the Company, both newly elected and incumbent, are as follows: Terry D. Hildestad C'hainnan of the Board William E. Schneider Chief Executive Officer Todd M. Taylor Region President Hap Taylor President Rainey Gage Vice President -Administration and Assistant Secretary. David K. Johnson President -Spokane Division Dave Turner Presider -Southern Idaho Division David A. IblidtIyng Vice President Operations -Spokane Division Fancy K. Christenson Ti~asurer and Chief Financial Officer Paul K. Sundress General Counsel and Secr~ry Karl A. Liepitz Assisiant Secretary I further certify that the following is a true and correct copy of Section 5.13 of the Bylaws of Hap Taylor 8c Sons, Inc., an Oregon corporation, which sets forth the powers of the oiTicers to execute documents; and that said Bylaw Section is presently in full force and effect: 5.13 Execution of Instruments, All- deeds, bonds, mortgages, notes, contracts and other instruments shall be executed on behalf of the Corporation by the Chairman of the Board, Chief Executive Officer, the President, or any Vice President or Assistant Vice Presidern or such other officer or agent of the Corporation as shall be duly authorized, by the Board of Directors. Any officer or agent executing any such documents on behalf of the Corporation may do so (except as othen+vise required by applicable law) either under or without the seal of the Corporation and. either individually or with an attestation, according to the requirements of the form of the instrument_ If an attestation is required, the documern shall be attested by the Secretary or an Assistant Secretary or by the Treasurer ar an Assistant Treasurer or any other officer or agent authorized by the Board of Directors. `1Vhen authorized by the Board of Directors, die signature of any of~rcer or ageirt of the Corporation may be a facsimile. IN WITNESS WHEREOF, I have hereunto set my hand. and affixed the seal of this Company on October 17, 20Q7. ~; a 6 8 F.---- ~ • --~ a i >~ ~ / f t ~~- •. P ~ - 3 L, . o~ d•° -° rl ,~ °fgwm06•s• A. LIEPITZ, Ass' Secretary 2 c~T}r aF ~,.~ Foiu+a c>U3lo BLACK CAT TRUNK SEWER, PHASE 4, SCHEDUL]r5 B d$ C ADA COUNTY, IDAHO PENAL SUM FORIvi .[1i1J Bi~~ HiDD)ER fName and Addr~s,l: .KNIFE RIVER 5450 W GOWEN ROAD BOISE IDAHO 83709 -2854 HWY 55 STE 250 PAGAN. MN 55121 "" '-"--~--- O~ .,R ame and Addresfi : Meridian ~ R~t442 BID HID DLJE BATE: As ti.sted in the Advc~tisetnent for Bids. PRQ.IECT (Brief Deseripdan Including Location. The Project consisis of conbtruetion of approximately 2,493 Gteeal feet of 27-inch PVC gravity sewer, 1,945 lineal Fc~t of l0ant:h PVC gavity sewer. 16S Iineai feet of 8~inch FVC gravity sewer, stsphslt, sod and osier surface r~air, manholas, dewaterinn, lift station ahandotuneni, trafNic contra!, storm water managemertt, trenching, and other related and miscellaneous vl+ark. It is the incept of these documents to describe the work required to complete this project in sufficient detull to secure comparable bids. All parts or work not spectfic:ttlly mentioned which are nreessary itt osrrlGr is provide a eornptere instaltation shall be included in the bid pad shall canfornt to ail Local, State and Federal requirentenos, BOND BOND NUMFlER: N/A DATE (Not lutr:r than Bid due dais); NOVEMBER 20 2007 PENAL SUM:.~LOT TC) FXC:FFD FI /F PFRC`FI~L(?F Ah~n(~T RID"'~"`* *****JC%~-*~»,-* (WOrdS) ~) Iiv WITNESS WHEREOF, Surety stud Bidder, intending to be legally bound hereby. subject to the terms bn the reverse side hereof. do each cause his Bid Bond uo be drily executed on its behalf by its $uthoriz~i U~icer, ~, repre~nrative. BIDDER KNIFE RIVER {~~) Bidder's I*lad~ and Cxtrporate Seal ' Signature and ?isle '' i Attest: ~!ons~tott fc SLfI.ETY LIBERTY MUTUAL INSURANCE COMPANYI~) ' Surety's Aiame and f.'orpgtate Seal By: Signature snd'Itit3e ~~ aIId ~i'e MARGIE JOHNSON ,ATTORNEY-IN-FACT (Attach Pow Attorr~Y) /1 NICOLE J. WEDMORE, SI~iETY ACCOUNT MANAGER Note: { t) Above suddresses are to be used for givislg required notice. (2) Any singular reference w Bidder, Surety, OWNER nr other party snail be considered plural where applicable. ' 00310-1 TH,ISPOWEA OF ATTORNEY:15 NOT VALID UNLESS IT 1S PRINTER QN RED BACKGRQUND., : ° This:Power e# Attorney ilmi#s the acts of those named heroin, acid'-they have nc author}ty to bind the Gompafiy except in tile-manner and to .the extent hgreinstated.=: :: = ~. > - ;: - 1_IBERT~FIUitITEIALIRtSURA1VCE CON[Pf~L~(Y, ; OS ,: '. TON, R11kS5ACMFJSETTS .. ~ B ; ~ 1?S3VIfER C7F'ATTOFZNEY :: KNO?N ILL :PEf1SOA1S 61~ THESE PRESENTS 'That i~barty AAUtual Insurande Gomparty (the "Cgrt]pan~r°J, a ~ iNassachasetts atoEt4 lnaurance ' GQmpany, Doreu2rat to and byaiati~tinty of the ~y-l~yta~ AutFicin3aUon Etiereinafter setfurti~;daes ~iereby narrie;,cvnst~tufe aFld appouxt; ., :, 111fA)FtG1E JO~LyS~71~1, ~1-1V~~ RY ~I~GER, ~tQ1-1~1 xl- 1~EEi~EDSf, ~QHN ~.L~IN, IE~l~k1 Y ALCn ~"~f CdT~f~~ SPi~q~L~F1E~D, S'~~4TE OF O~E~I~, ..__,..~ ~ i~ n. ,. - .i ~ , ,,.. .; ~ ~-. ,_~ , ~ .~ .~:~.~......-" .,.. ~ i. _...~. , . _ ~ ,...i . ` ~~I.rr ~*Mlf~!a) ra.r~i~1.1 S7~~ii ~i n1.F . ~ -.~'., -,. ~..- ,, ~ ~_`.: ~ _ _ _ _ _ 5i! ~; 17 Lim. i+iR i~tY 7iiA~rintisY 4 ~Mei in'iY Aw. } -4n~! eacPi ind~viciua_ !ly ~# There b$; r%~ora~ian One ~aau~d~, xts tie ~end~.lavuitii atfa~rl-fact fa:rriakQ eXe~!?te:'sieaF, aclmiawled je-arac~ del~Qr, ";fail aru~ wits '> ~@hai# as sc!~~~ rr erlc3 as`-ts eCt: rand. dead; ~y ~ri~:' dll ~~td@ciatEic~gsr b4stads, rseog~ai~nees and b~F':saC~ty ~b~ig~fiot~rri tire- pec]aP surja rfa! ~~eedm EIFTIF 6i11l.L14?nF AI~FC~Q4ttfJD****°''~*"~***'"Y* ~ .:~I.:LAi~~.~~. s~El,El1~0,QOEI.DI1•**`.~~ .: :~) eat, aFld e~ceeudor} r7# each ander~a&ings, b#>rTds, raeocJr~arreas ,atad-othgr spret3t glitu,;~tr`,erts,, ~ putsuancs:~of ttieSe~ prasen~ siiaii- be ~s dtr~} upon the L Eocnpan3+ a~ ttthey -had': E2@en du{y sigPle~fi.b~!:~a~:~r8sideri~~ac+c#.~ fly #t-as~PDlaty pf ifa@ f~?~pan.~r7-a tfTe3i :Fjop~~ ~+'.sHrls, , .. a - ~ -_ ~ - er s ~h 'Butt ~ 7C a~ pow_ ._ t .ode _ ~. et~~::>~i~~~}t ~:~ "~:~x~ ' ~~~~ 'a ~t~ fi~ilew{n~ . ~ . jai : Vie:" lam ~. Ar~-c~ ... ... ,, .:~._. .. ~, . .. ....- -- - :.. /kRTIGL.~E ~ffti f~ecy#i~~ ox Co~§~~'t~ Sec~rrl~~ s~fe'b~1~6nd~ a~SftJad~ic-gs _ 9r~, dfftcer o~'thfl 04?~r1P~y ~utfa"oQ,zed~for th~C p~rpaSe trk ~-?EI .F~->~:~~trtratr or iYce:pte~i~ier~_and ~crblect to suc7tc 1ich~fattor~s<at~3J~ ahairrnaci ae;the prescient tnay presenbe, sAali app~ihfi=such ~tfi~nsysr~ _ . e~tecut~r seal, acknfrmlre~dgp .aiK# deliver as` surely : ar}d: Iti}liradett - ~ttotn8ys }rufac~; subjecf to-tf~e~ firartafloi~s s~ for~Tra their t~De~t~~p ,?2tt,l}'e ensl axecufion of ariy sllr}s'trurFler~t~.and fo aftach thereto ~Fre a~ f~ndrng as tf scll~::~de~r.~srd'en~ ~xr#~ ~t#ester~ k~ythe~e~'etar~c the toflowing.instrumerrttlte chairman r?r~he p~sldecr~has.arntioFi~ed~ie.-o~'rc2r 1?arsiiant to ~rdele ~lil, Sec~oh 5 bf the Sy-LaiwsL ~2rnet 111 Eiliutt, a. aufhdp#~ a@pQfrxt suQh a4tots_git ad Iraay be~e~te act 3. , - ~etlver as s~re~ aoy;~d.aN~tu~der~in_g~,~ioads, ~ey~Fl!Lc,~ssuld o`il~ Th2ttk~e ~„y~-leak ~d ~ie,A~ie~atPoFl. s~fFlr~li uabgv~ #%i~e 'r~s theft; ~d ar+ :.: - . :ier _ _ liirigs ~otid~ ~tecegn}~artces mid-`pier ~irb#3c 96iigations ; 54}sla lets 4~attorr}ey; snalihaue ~Il pa~~ to Cf .tile ~~r?Dar}y hY their <. leaf QE-'1ke~Czainipa~r il~Riea:-~Q~~ec~ted sneh-instr~ur"r~ec~fs ~al~l~q it ~er affr~ai rtariied 3ifE}r~lrl t0 apD4int attorneys-Ir, I~G~. .~, s~y~t~a~n~t{~5~retat/3~a~.o~fygL~iberty ~I 7,~ dns/l~~an~e ~CyQm' igs~.~~idre,,b,,~~+1 ;: R Ld01~W~ Qf t~ C'"Q'.~f .. ~ t0 7~~4u~R,'~CP.i~r~@,~ wS'~e$IL l~~if~y~/;.~N ~~l ~. ;~1t~ abligat+orl§ -" ~1 ;max }tx hill ~ aPtc~ effect !bnzaCi ~}ffI+Eer ~}r ova! Qf tl'-@ ~nipany a~~i-tkirs:r~rruarestr~ ~~a~}'nf ;. E~'bec~yy N~"fbsrrrance ~tnpa~ has been afffxed"xhere~ iFl P~iVEe~n~ ~'engs~Ivariia this 'f~i~r ~a~ c~,. ~`~rt~, ' a ~. Ili! ')~S~1MQ~~f WH - ~ ~g subscri6~ try r}arrxe.ara~i affj~e~d~r~nptaFlal fieal~t t?iyino}t~t- i~leet?-~c , ~nnslav~„a, on ite eFay and mar ,; -si. first above v~iften - ~ ... _ ~ t~ =m: ~ ; ~€ ;rte' ~ _ ;, ~ ~ ~ ~ ~ _ ~$ ice ~ ~ ~ '.. ~ Pasfalla f+lpfar~± P~ib!~ ~ ~a : ~ . ~ ca.. CERT1f iCAT~ : ~ . ` ~~ f -the;unders~gn.~d AssLstan ret~y9fl:,rGlertq 1Vls~tuai 1ti~ur~nce CotnpaC#y dt~ttereby ee[~'fy tltaCth~e~n9i~al po+~erp€~ney of ~arhieFi tlleiQt ain is ~ f~lf; tn~e 2nd correctcepy, }s:irpfcitl ford and effect Qrr't}ie date-af_#t~:~eCt~ic2te aru~i=do #urther.~ertififttiaf~#t~Q-gfficer qc Q~-ai yvk4 executetl fh~s ; - 'said power of ;attorney'-is ar} ~ssfsteirft Seece"farr~ s}ieb}aUy. ~u1`iidazecf ~.jr3Fje~!e}~aimiarr grtlie president: ttr ap~icrt.attorneys 1rr fac[; as provld@d ~r~ Article ': ~IIC 5ectfon 5 of the By Iawe of I.i4erty Ivlut~l Insprarice t~omDany;,~ , ::This ce~ficate and the above.power of altorngy~.may be; signed vy faesintlle or mechariiealfy reproduced slgnatu~$s Udder:and_ 6y .arathorty, of the ; "~ „_ foltpsting kite:of. tFie b©ard of directors of Liberty=llArshaai.lnsurance Company at a meeting, d~iy called and deli AFl the ,i 2th day of IVlarch, 198Q_ I ; ,. : VOTED that the facsimle or niechanicaliy reproduced Signature of any ,:assistant secretary of the company, wf5erever appeanng upon a Ceitified-copy of .any pov~er of attorn~y.Isstgd by. tfie company in ccinneGdari witf} surely bonds,: sktaH be: valid and binding upon,tFie company , ; with tkie.same force and effect as tha4Ygfi manuai[y affixed; :_ , ~ - I~ TESTIMONY WHEREOF,.I have hereunto su6scnbed"my name and affixed the corporate seal of the said company, this 2"UTH aay pf - ~ • ~ ~^ B 'r y ~ ~ ~ 'Da ' M. Carey, As$i t5eeratary i~ i~ Form 00430 Naming of Subcorrtractors Form Per Idaho Code, 67-2310, Bidder-shall include in his or her Bid the name, or names and address, or addresses, and Idaho Public Works Contractor License Numbers of the Subcontractors who shall, in the event the Bidder secures the Contract, subcontract the plumbing, heating and air-conditioning work, and electrical work under the general Contract. Failure to name Subcontractors as required shall render any Bid submitted by the Bidder unresponsive and void. If the work is to be done by the Contractor, contractor shall If none are recwired to complete the Work, mark "None " Subcontractor Name and Address ~E~E'S~i` t N C . l y`l~"t Est~~~-r ~15E, ID 831 i~ Approx. % Total Classification License No. Contract Amount Plumbing ~C)qq~°AD-A~ ~ ~o (tSloC), tJZZ2OyOZ34tJ~01Z~~ 4~sy~,i15ro00, 0`t'i~0y 0~2.gL0, 0250p ~ 15540,t3g3O~ ~~,A ury ~ ~e.~ ~ ~ EL.IEC.-r~~cA>_ iol~5-a~~ ~- tty~ ~1~ ~1SE , I1~ X31010 00430 - 1