Loading...
HomeMy WebLinkAboutStandard Form of Agreement with Custom Electric for WWTP UV Disinfection System1-tv~Qa' 07y3 STANDARD FOB OF AGREEMENT BETWEEN OWNER AND CONTRACTOR ON THE BASIS OF A STIPULATED PRICE THIS AGREEMENT is dated flee -__ day of M~~-, Ada County, Idaho (hereinafter called OWNER and 'n ~ Yeat 200'7 by and between City of CONTRACTOR). ) Custom Electric, Inc. (bereinafter called OWNER and CONTRACTpIt, ~ ~iderabion of the mutual co Amide 1 WORK. Vey heremat~er ~ fO~' agree as follows: ~N ~ll ~oR wiI1 c~tplete all Work as speciffed or indicated in the Agreement. The WORK is genetaliy T1~ Project consists of the installation of the third bank of the W disinfection system with a control panel and rerouting the cables so that adjacent units are controlled togedter. The project for which the Work tttrder the At~ement ~ described as follows: W WZP W ~.d Bah Installation. ~~ cement omterlals and wa.~~~p e,® meet the City of Meridian S gs. The Contractor should become familiar with the sPedScations. tandard St~dBcations and Article 2 ENGINEER The City of Meridian Pnblic Works Depatttrtent v~rill be the ENGIlVEIiR. ~ City of Meridian Pablic Works DePaztrnent is to act as OWNER's representative, asswmeallduties and authority assigned m ENGINEER is the Contract responsibilities and have the rights and accordance with the Contract Documents. ~~ m e°ffiection with completion of the Work in Artiide 3 CONTRACT TIME. The Work wilt be completed within frnty five (f~) calendar Sys from the date when the Contract Tigre commences to run. Time is of the essence. Artide 4 CONTRACT PRICE. OWrTER ~ Fay CONTRACTOR for completion of the Work in current fiords as follows: $7,521.00 Ardide S PAYMENT PROCEDURES. The CONTRACTOR will submit an Application for Payment ups completion of the Work. Applications for Payment most be submitted to the Public Works Departerie~. Payments• Tbe OWNER w171 make progress P$Y~nts on account of tins CONTRACTOR's Application for Paymeert as reco Y COII~ Price on the basis of day of each moth during construction for h~mmended b the Public Works Department, on or about the 15~ ofthat month, All `~ milted to the Public Works Department prior to the 1st day progress Payments w~71 be on the basis of the progn;ss of the work measmred by rite schedule of values established in Article 4. The OWNER ~ o made~tance of all Work covered by this Agreeyment, ~ S ~ 1 ~ ~ of the Payment until Smal completion ~' ~lu~ P~entages, lees authorized d~eauch'~ witluma thi~~30~ ~~ O1k' payment will 11/15/2007 Page 1 of 3 •m m Article 6 INTERF,ST. ~ moneys ~t paid when due will bear interest at 12% per annum or the ~ rate allowed by law at the place Project, whichever is leas. Article 7 CON'CRACTOR'S REPRESENTATIONS. In order to induce the OWNER to enter into the Agreer~nt, the CONTRACTOR makes the following representations: 7.1 The CONTRACTOR has familiarized itself with the nature aml extent of the Work, site, locality, and all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or famishing of the Work. 7.2 The CONTRACTOR has studied carefuIIy all drawings of physical conditions. 7.3 The CONTRACTOR has given Public Works ~ ~~ notice ofall conflicts, errors or discrepancies that he has discovered anti the written resolution thereof by ENGINEER is acceptable rA CONTRACTOR. Article 8 CONTRACT ItOCUMENTS. The Cornract Documents, which comprise the entire agreement between die OWNER and the CONTRACTOR concerning the Work, consist of the following: 8.1 This Agree 8.2 Exln'bits to this Agreement -NIA. 8.3 Information For Bidders. 8.4 Drawings. 8.5 CONTRACTOR's Quote. 8.6 19991daho Standards for Public Works Construction, including. Division 100, except as superseded by the I~orrnation For Bidders, contained herein. 8.7 Revisions to the Standard Specifications and Special Provisions. 8.8 Documerdation sabmitted by CONTRACTOR prior to Notice of Award. 8.9 advents listed in paragraph 8.2 above are attached to this Agreement (except as expressly acted otherwise 8.10 City of Meridian Standard Specifications & Draw~gs - 2002 8.11 EJCD General Conditions There are no Contract Documents other than those listed above in this Article 8. The Contract Docurnts aiay only be amended, modified or supplemented by written Change Order. 11/15/2007 Page 2 of 3 .rt. ^a- Ar4lcle 9 MISCELLANEOUS. 9.1 Np assignment by a parry hereto of any rights under or interest in tlu: Contract Documerris w>Zl be binding on another Parry hereto without the written consent of the party sought to be bound; and specificauy but without limitation moneys that may become due and moneys that are due nnay not be assigned without such consent (except to the extent that the effect of this restriction maybe limited by laws and unless specifically sued to the confirary in any written consem to an assignment no assignment will release or discharge the assignor from auy duty or respoasibdity under the Contract Docaimems. 9.2 OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect of all covenants and obligations comained in the Contract Documents. A,r6lcle 10 OTHER PROVISIONS. None IN WITNESS V~JHEREpF, OWNER and CONTRACTOR have signed this Agreement in triplicate. Ooe counterpart each has been delivered to OWNER, CONTRACTOR and ENGINEER. All portions of tbe Contract Documents have been signed or identified by OWNER and CONTRACTOR or by ENGIlVEER on their behalf The Agreement will be effective on 2007. Owner OF .RIDIAN Contractor _ _ ~-~iS"C~M ~ee~: @„_ Name: T ''~ ~`~' L_y ~ i Attest: ~'L= /~ A William G. Berg,~r. C e z A~~a Approved by City Council:+ ZW~, %'~~ ~'~ tc''f ~ . ~ ~ z?ti ~'^~... ~`:fa?''..j 11/1 S/200? Page 3 of 3 tr ~ ~,.