HomeMy WebLinkAboutTask Order No. 0730 with Civil Survey Consultants, Inc. for Bower Street Water Main ImprovementsTASK ORDER N0.0730
CITY OF MERIDIAN (OWNER)
AND
CIVIL SURVEY CONSULTANTS INC. (ENGINEER)
This Task Order is issued by Owner and accepted by the Engineer pursuant to
the mutual promises, covenants and conditions contained in the Agreement
between the above named parties dated November 8, 2006.
CITY OF MERIDIAN
BOWER STREET
WATER MAIN IMPROVEMENTS
PURPOSE
The Engineer's scope of services, time of completion and compensation shall be as set
forth herein. Services shall generally be described as Engineering Consulting Services.
TASK 0730 -Design and Construction
Per the City's request, the Engineer will provide professional engineering services
related to the construction of approximately 700 lineal feet of 10n0 potable water main in
Bower Street west of Meridian Road. The existing 8"i?1 potable water main will be
abandoned and all existing services will be converted over to the new main.
The engineer proposes to provide the following under this scope of services:
1. Perform a field survey as necessary and prepare complete plans and
specifications for construction.
2. A water main flush line will be constructed at the west end of Bower
Street at Nine Mile Creek as part of this project. All approvals and
easements for the flush station will be obtained as part of the 2008 Water
System Flush Lines project.
3. The construction plans and specifications will be submitted to the Idaho
Department of Environmental Quality, and the Ada County Highway
District for their review and approval.
4. Assist the City of Meridian in advertising the project for bids, be available
to answer questions during the pre bid period, attend the bid opening, and
assist in the award of the contract.
5. Be available to answer questions during construction and provide one set
of construction stakes for the water line.
6. Perform field surveys of as constructed improvements and prepare record
drawings as per the City of Meridian Acceptance of Record/Electronic
Drawings dated February 7, 2007.
INFORMATION PROVIDED BY OWNER
The following information will be provided by the owner.
1. All construction contracting, administration, and inspection.
2. Red-lined plans showing any changes made during construction for use
in preparing record drawings.
3. Assist the engineer in obtaining an easement from Plum Creek Northwest
Lumber for construction of the flush station.
TIME OF COMPLETION
Engineering services will be completed as needed.
COMPENSATION
The Not-To-Exceed amount for this Task Order No. 0730 is Eight Thousand Three
Hundred Twenty dollars ($8,320.00). The hourly rate for services and direct expenses is
per the previously approved Prevailing Fee Schedule Effective October 1, 2006, and by
this reference made a part hereof.
CITY OF MERIDIAN
BY: ~ ay~GG~
TAMMY de ERD,
MAYOR
Attest:
ENGINEER
BY:
TIMO HY A. BU ESS,
VICE PRESIDENT
~$ s;~.
e
~, .
~a~~ ..
WILLIAM G. BERG, JR.,~GITY CLERK ~ti.: ,,
r ~0 ~/////IOflll~yl\\\,,,\
Approved by City Council: ~l Z
(Date)