Loading...
HomeMy WebLinkAboutTask Order No. 0784 with Hydro Logic, Inc. for Hydrogeologic framework and ground water geochemistryTASK ORDER N0.0784 CITY OF MERIDIAN (OWNER) AND HYDRO LOGIC, tNC. (HYDROGEOLOGIST) This Task Order is issued by Owner and accepted by the Hydrogeologist pursuant to the mutual promises, covenants and conditions contained in the Agreement between the above named parties dated January 9, 2007. CITY OF MERIDIAN HYDROGEOLOGIC FRAMEWORK AND GROUND WATER GEOCHEMISTRY STUDIES OF THE AQUIFER SYSTEM RELIED UPON BY THE CITY ~~~~~~ The Hydrogeologist's scope of services, time of completion and compensation shall be as set forth herein. Services shelf generally be described as Hydrogeologica! Consulting Services per the Consultant's proposal dated December 15, 2008. TASK 1.1-CONDUCT HYDROGEOLOGIC FRAMEWORK AND GROUND WATER GEOCHEMISTRY STUDIES OF THE AQUIFER SYSTEM UNDERNEATH MERIDIAN Per the City's request, and in cooperation with the City Public Works Department, Hydrogeologis# will conduct a hydrogeologic framework study of the aquifer system beneath Meridian. Among other tasks, the Hydrogeologist will 1) synthesize, interpret, and re-plot available borehole geophysical records as sub-surface cross-sections beneath the City, 2) compile, plot on tri-linear diagrams, and model all available geochemistry data for existing supply and test wel{s, 3) attempt to correlate the sub- surface drilled geologic sections from well to•well across the City including inference of s#ructural geologic faulting, 4} obtain and evaluate existing research and petroleum explora#ion deep seismic reflection geophysical surveys as may be helpful to interpretation of the sub-surface stratigraphy and structure beneath Meridian, and 5) develop a hydrogeologic framework report on the current understanding of the 3-D geometry of Meridian's aquifer system with conclusions and recommendations. The Owner will provide all available information necessary to conduct the modfications. Hydrogeologist wiN perfomt aQ work tasks, evaluations, plots, and reproductions, for approval by the City. Hydrogeologist will develop any necessary change orders to the work and keep the City regularly updated with respect to the work. Hydrogeologis# will work closely with the City's Public Works Department and the City's Water Department. TIME OF COMPLETION Hydrageoiogic services will be completed by year end 2009 or sooner if possible. COMPENSATION The Not To-Exc~d amount for this Task Order No. 0784 is forty-seven thousand, five hundred and fifteen dollars {$ 47,515.00). The hourly rates for servit~s and direct expenses is attached as an F~ccet spreadsheet and by this reference made a part hereof. CITY OF MERIDIAN HYOROGEOLOGIST ./""~~ ~ BY: `'~ 'i TAMMY de ERD, MAYOR ED SQUIRES HYDRO LOGIC, INC. Attest: ``~~,,~~-~~~~~~~, ~~ ~ .9,y `,°R'~r~ .~` '~• JAYCEE ITY~L RK gEAL /y. j J r ~~,,'pp ~~r is'~ ~, ZO ~~`• ~ovvr~c City Council Approval Daze: ~~ Public Works Approval: Date: 1-~5 -r~9 g Appro Date: