Loading...
HomeMy WebLinkAboutBuss Mechanical for Phase 3 Tenant Improvements New City HallCITY OF MER®IAN 33 EAST IDAHO MERIDIAN, ID 83642 CONTRACT CHANGE OR~R CHANGE ORDER NO. 04 PROJECT NO. CH-~-0O'1 DATE: 9-2-l~ EFFECTIVE DATE: Buss Tire Contractor ~ herby dfrecled to rtrake ~ faliowing from ~ Cartrsd Dam and Plans. Deacrtption: Incorporate rrivtalons per ASPS 1108,121.1288. Wag Barrel quote OTHER TERMS AND ~NDiI'IONS N TH£ SAME. Corr far Chance Order: addt0onai scope or revPsiorre per ifsmd ASPS & Wad Boxes quote Attachmerttrp: Change Orr Items Desaip0an, dated 8i, with corrt~or quotes CHANGE NI CONTRACT PRICE: CHANGE IN CONTRACT TiME3 Origitral Contract Price $953,385.00 co~,trad Ttrrres: suttslartd~ Compietiorr t3/28f08 Net Gmrtges form previous change Orders ~ forrrr pieviam Charge ONers No. 01 toti3 Na`to_ (ral~Qardays) $27.285.00 Name trhao{ Prise Prior ~ ih~ Charms Order: Corte Torres pr~r to this change Order: {caterrdeu daps or date) increase o0tlds Change Order. ln~e~ (r~rxeasey or tide cirarrge O-~r: nr~ days or date) contract Price will, a@ approved change orders: contract Timms w81f au approved Chance Orders: (ealer~ aay8) ffi886,974.~ Subsfaetlal Campyion 8!28/2008 RECO#IOED: (co aCCEPTteD: (coNrtaACraR) PETRA INC % ~f~~ L._..-- BUSS IMECHA ~L. By: Tom Coughlhe ~~/ By. John Buss Date: ~-l~b° d ~ Date: ~f/Y r~$ APPROVED: (crnr couNCI~APPr~va~ Date: I -~. a-~ 9 Die: APPROVED: (cinr) Mayor Tammy de Weend City Clerk, Jaycee Holman ~yo~~~- CHANGE ORDER ~~~ ~ [~ (~ [~ ~ (~ (~ No. 00004 323-4500 SEA as 2008 BOISE, IDAHO ,,.. 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323507 TITLE: ASI# 110R, 121, 126 Pricing DATE: 8J25/2008 PROJECT: Meridian City Hall 70B• 060675 TO: Attn: John Buss CONTRACT NO: 32 Buss Mechanical PO BOX 190476 phys: 4471 S. Henry Boise, ID 83719 Phane:208-562-0600 Fax:208-562-0555 RE: To: From: Number: DESCRIPTION OF CHANGE **All taxes are included in casts** Tax Tax Net Item Descaiiption gl,~ntity Units Unit Prise Rate Amour Amount 00001 ASI#110R Exhaust Fan EF-2 Exhaust Modification (COR#38} Re-route sewer ~ I~ gj``pOpOpp LS $873.00 0.00% $0.00 $873.00 line to new location. Buss quote 7/24/08 00002 ASI#121 Boiler Control Modifiptions (CAR#39)- Install a bypass with control ~ 1.000 LS $2,831.00 0.00°k $0.00 $2,831.00 valve for the boiler loop. Buss quote 7/25/08 00003 ASI#126 Dishwasher Reloption from Rm 145 to 340 (COR#40)- Add supg~Y '~" 1.000 LS $639.00 0.00% $0.00 $639.00 and drain for new dishwasher location. Buss quote 8/5/08 C. ~ ) 00004 Wall Boxes for Refrigerator Ice Makers (CAR#41} Provide and ir~siall 10 ea 1.000 LS $961.00 0.00°l0 $0.00 $961.00 metal wall boxes for water connections to refrigerator i~ makers. Buss quote 6/6/08 Unit Cost: $5,304.00 Unit Tax: $0.00 Lump Sum: $0,00 Lump Tax: $0.00 0.0% GC markup: __ ~0 00 Total: $5,304.00 The Original Contract Sum was ................................................................................................. Net Change by Previously Authorized Requests and Changes ................................................ $953,385.00 $27,285.00 The Contract Sum Prior to This Change Order was ...................................................... $980 670 00 The CoM~act Sum Uiilll be Increased ... , . ................................................................................ The New Contract Sum Including This Change Order ...................................................... $5,304.00 $985 974 00 The Contract Time Will Not Be Changed ................................................... . , . . .......................... The Date of Substantial Completion as of this Change Orda~Therefore Is ........................... AAERIDIAN CITY HALL PROJECT NO: CH-06-001 BUSS MECHANICAL -Phase 3 (32) CHANGE ORDER NO 4 08!25/08 CHANGE ORDER ITEMS ASI 8 RFI Changes 1 ASI 110R Exhaust Fan EF-2 Exhaust Modification (COR#38) 873.00 Re-route sewer line to new location Buss quote 7/24/08 2 ASI 121 Boiler Control Modifications (COR#39) 2,831.00 Install a bypass with control valve for the boiler loop. Buss quote 7/25/08 3 ASI 126 Dishwasher Relocation from Rm 145 to 340. (COR#40) 639.00 Add supply and drain for new dishwasher location, Buss quote 8/5/08 4 - - Wall Boxes for Refrigerator Ice Makers (COR#41) 961.00 Provide and install 10 ea metal wall boxes for water connections to refrigerator ice makers. Buss quote 6/6108 $ 5,304.00 Page 1 of 1