Loading...
HomeMy WebLinkAboutTask Order No. 0610C with JUB Engineers for Ten Mile Road Franklin to Cherry Reuse and Sewer Main DesignCITY OF MERIDIAN TASK ORDER NO 0610C FOR ENGINEERING SERVICES FOR WATER, WASTEWATER, AND MISCELLANEOUS PUBLIC WORKS PROJECTS TEN MILE ROAD (FRANKLIN ROAD TO CHERRY LANE): REUSE AND SEWER MAIN DESIGN City Project No. 0610C Engineer Project No. toffs-too THIS TASK ORDER, entered into this ~y of January_2008, between City of Mertdfan, Idaho, hereinafter referred to as the "CITY", J-U-B ENC;jiNEER3. Inc.. hereinafter referred to as the ENGINEER, is subject to the grovlsku-s of ~e Agreement for Engineering Servit~ for Wffier, Wastewater, and Mlsc~ganeou8 Public Works Projects, approved January 1, 2007, hereinafter referred to as the MASTER AGREEMENT far PROFESSIONAL SERVICES. WHEREAS, the CITY Intends to c~tolete the seuuer and reuse oioeltne Imorovemerns on Ten MNe Road between Frankgr Road and Cherry Lane. hereinafter reterred to as the PROJECT; NOW, THEREFORE, the CITY and Jdf-B ENt3lNEERS. Inc ~ cor>sideratiarr of their mutual oovenar~ herein agree In respect asset forth betty. CITY INFORAAATtON AND RESPONSIBWTIES: The CITY wUl grovlde to ENGINEER the data and/or services specified in the AGREEMENT. In addition, the CITY witl fumfsh to ENGINEER items listed to Attachment °B". SCOPE Of SERVICES TO BE PF.RFORNtED 8Y ENGINEER: ENGINEER wi11 orovide titre sen-lo~ descried in Attachment °A_. SCHEDULE OF WORK TO BE PERFORfNED: ENGINEER will perform said services in a timely manner. BASIS OF FEE AND BILLING SCHEDULE: The CITY will pay ENGINEER for its services and reimtrursable expenses as fotiaws: Re#er to Attachment `C". File Folder Title: City o! Meridian -Ten Mile R~d(Franidin-Cherrvl - Sewer and Re-usa Piaeiirre Imp e Remarks: 1N WITNESS WHEREOF, the parties hereto have executed fttls TASK ORDER as of the day and year first above written. CITY: City of Meridian, Idaho 33 E. Idaho St Meridian, ID 83842 /'~~ Name/fltle:,~ammv de V,~(eerd. Mayor PUBLtC WORKS APPROVAL• By: NamedTitle: Li / v~r Approved by City Council: ~ ~ _ t 3 - a v o 9 ENt31NEER: J-U-B Engineers, Inc. 250 s Beachwood aye, ste, 201 Boise, ID 83749 _ / By.. `~~~ ~ t~~'~~ Namefritle• Phi ~ i i~ ti''~ ~ .,~ c3, ~pr~ . ATTEST• ~ ~ By. Name/Title: ark y $~ ~ Q~~~`' 9~ ~t ts~ ~ to 9 ~ ovlvc~ J-U-B ENGINEERS; lrrc. arrochmenr ~a• - Laos-ono CFTY OF MERIDIAN TEN MILE ROAD (FRANKLIN ROAD TO CHERRY LANE} SEWER MAIN AND RE-USE PIPELINE IMPROVEMENTS Task Order 0614C Attachment "A" -Scope of Engineering Services Proiect Overview: This project provides final design of sewer and reclaimed water improvements in the project area associated with Ada County Highway District (ACRD) Ten Mile Road widening project, between Franklin Road and Cherry Lane (ACRD Project No. 504003). The intent is for the City of Meridian (City) to incorporate these improvements into ACHD's construction contract. More specifically, the project entails the following: 1. Extension of the 18 inch trunk sewer from near the intersection of Ten Mile and Franklin Roads, easterly 900 lineal feet on Franklin Road. 2. Design of a 12 inch reclaimed water pipeline on Ten Mile Road, from Franklin Road to Cherry Lane. Table of Contents• Attachment "A" -Scope of Engineering Services • Task A -Preliminary and Final Design • Task B - AQencv Coordination anti Permitting • Tomsk C -Construction Assistance Services • Exhibit A-1 -Labor and Equipment Detail Attachment "B" -Items Provided by City Attachment "C" -Fee Schedule Ciry ofMerrdian -Task Order 061 DC Ten Mile Road !Franklin-Cherry): Sewer Main & Re-use Pipeline /mprrn:ernents Page -1 J•U•8 ENGINEERS, lnc. Attcrhment 'A' - 1Q-~-tOD CITY OF MERIDIAN TEN MILE ROAD (FRANKLIN ROAD TO CHERRY LANE) SEWER MAlN AND RE-USE PIPELINE IMPROVEMENT'S Task Order 06100 Attachment "A" -Scope of Engineering Services Task A -Preliminary and Final Design 1. Preliminary and Final Design, and Construction Documents A. Supplemental Topographic Survey, Control, and Mapping 1. This Task Order intends to utilize topographic survey and final design drawings available from the Ada County Highway District (ACHD). J-U-B will supplement this information as described herein; however, the accuracy of this information cannot be guaranteed. Future right-of-way (ROW) will be taken from ACHD road widening plans. 2. Wherever practical, benchmarks referenced on the ACHD plans will be located in the project area to reference ACHD control and stationing. Published elevations will be compared with the J-U-B supplemental survey. 3. Establish temporary construction benchmarks {T.B.M.'s) and control points at 500 foot intervals. 4. Contact utility companies (gas, power, telephone, storm drain, cable T.V., street lighting, traffic signals, and irrigation) and other utilities identtfied along the alignment prior to survey to request field locations of utilities and to obtain available utility mapping within the project area and public ROW. 5. J-U-B will field locate utility mark-outs as provided by the utility companies. At stream crossings and existing bridge or structure crossings, additional field topographic information wilt be taken to include cross sections of waterway, bottom flow line of structures, and benchmarks listed on ACHD's structure plans. B. Final Design of Trunk Sewer 1. Revise the preliminary plans of the "Ten Mile Diversion Trunk Sewer -Phase 2" to reflect revisions to the ACHD plans. Design alignment of the sewer will be based on section line stationing of the ACHD Ten Mile Road widening project. Complete final design of the trunk sewer with considerations regarding constructability, future ACHD facilities, impact to waterways, sanitary separations, dewatering, utility conflicts, construction access, excavation depths, easement issues, and other pertinent design iswes. The design will incorporate recent discussions with City staff regarding implementation of the sewer master plan in this area. The intent is to extend the 18 inch trunk 1n the Franklin Road ROW and construct ablock-out at the nearest manhole west of the Ten Mile Creek Bridge, to allow routing of a future interceptor sewer along the south bank of Ten Mile Creek as that area develops. 2. Design crossing under the Ten Mile Creek Bridge at Franklin Road. It is anticipated that the crossing will entail placement of a casing under the footprint of new bridge expansion using Ciry of Mer4lian -Task Order 06100 Ten Mile Road (Franklin-Cherry): SewerMaln & !te-use Pipeline Improremenrs Page - 2 J-!!-B ENGINEERS, inc. Attarhmertt 'A' - 10~Q&f00 conventional trenching canstruction. J-U-B will prepare casing and carrier pipe details, trench and bedding details, connection details, and other special details needed for construction. 3. Revise the existing construction base drawings with the new design and prepare 90Y complete plans, and wbmit to the City and ACRD far review. 4. Incorporate applicable review comments and prepare 100% complete "bid ready" plans. Preparation of the technical specifications wil! be completed under Subtask D. C. Preliminary Design of Reclaimed Water Pipeline 1. A cursory [and use analysis will be completed to identify potential reuse application areas adjacent to the pipeline corridor so that provisions for future service can be approximately hated. Analysis considerations will include development status, existing and future zoning, pressure irrigation service to existing residential subdivisions, and locality. Boundary of the service study area will be'/a mile west and east of Ten Mile Road between Franklin Road and Cherry Lane. Upon completion of the analysis, the Conwltant will meet with the City and jointly determine the locations of future facility services on the pipeline (see 60% plan review meeting below). Complete preliminary design {60%) of the reclaimed water pipeline with considerations on constructability, future ACHD facilities, impact to waterways, sanitary separations, dewatering, impacts to public traffic access, utility conflicts, construction access, excavation depths, connection detail, and other pertinent design issues. Alignment of the pipeline is assumed within the existing ROW of Ten Mile Road. Connection and/or termination mints will be immediately south of Franklin Road and north of Cherry Lane. Perform preliminary design drafting in AutoCAD 2009 using the ACHD construction plan and profile sheets as the base. The topography symbols on the plans shall be unchanged from the ACHD data. Similarly, proposed ACHD construction shall be screened on the background and shown on the base plan and profile drawings. Proposed City improvements will include the construction plans which will include project title blocks, City standard notes and details, vicinity maps, sheet indexes, north arrows, bar scales, topography, pipe size, type, slope, invert elevations, ground surface elevations, temporary surface repair, found monuments and property corners, wrvey control, pay limits, and special details necessary for a biddable pr~uct. Drafting shall be completed on base drawing sheets compatible with the ACRD project plans. To the extent practicable, the current edition of the City of Meridian Standard Specifications and Drawings for Construction wilt be utilized in the construction plans. 3. Location for the pipeline crossings at Ten Mile Creek, Ten Mile Stub Drain, Eightmile Lateral and the Union Pacific Railroad {UPRR) will be shown on the plan and profile sheets; however, final design and detailing will be completed in Subtask D. 4. Submit 60~ draft plans to the City and ACHD for initial review of the alignment and stream crossing locations. At the City review meeting, future service locations wilE be determined along with service detail connections. D. Final Design of Reclaimed Water Pipeline, Construction Plans and Technical Specification Preparation 1. Incorporate applicable review comments from the preliminary plan submittals and proceed with final design of the pipeline and details necessary for construction. City of Meridian -Task OrderO610C Ten Mile Road (Franklin-Cherry}: Sewer Main & Re-use Pipeline /mpmvements Page - 3 J-t1-B ENGINEERS, Inc. Attachment 'A' - 10-0& 100 Z. Design the pipeline crossings for Ten Mile Creek, Ten Mile Stub Drain, and Eightmile Lateral. A boring is anticipated at the 'fen Mile Creek Crossing within the existing road ROW. The crossings will incorporate steel casing sleeves. 3. Design bored crossing under the UPRR railway on Ten Mile Road with an anticipated nominal cover depth six (6) feet. 4. Prepare 9090 complete construction plans for the reclaimed water pipeline. It is anticipated that one (1) construction package will be prepared for inclusion into the ACRD Ten Mile Road widening project. Perform design drafting in AutoCAD 2009 of the construction plans which will include project title blocks, City standard notes and details, vicinity maps, sheet indexes, north arrows, bar scales, topography, pipe size, type, slope, invert elevations, ground surtace elevations, temporary surface repair, boring details, thrust blocking, service connections, found monuments and property corners, survey control, pay limits, and special details necessary far a biddable product. Drafting shall be completed on base sheets compatible with the ACRD project. 5. Prepare technical specifications in accordance with the 2t~8 Edition of the Idaho Standard Public Wortcs Construction (ISPWC) format, and City Standard Specifications and Drawings. J-iJ-B shall be responsible for preparing special provisions necessary for the project and for inclusion in the ACHD contract. A bid schedule will be prepared with estimated quantities using 15PWC pay items. 6. Complete in-house constructability review and Qp/tZC review of the 909b complete construction plans and contract documents. Incorporate appropriate suggestions into project design. 7. Submit three (3) sets to the City far review. 8. Incorporate appropriate revisions as ,suggested by the City and reviewing agencies in the final 100 complete "bid ready" set of plans and technical specifications. 9. Develop and issue to the City a final opinion of probable construdion cost. Task B - Aaencv Coordination and Permittint 1, Agency Coordination and Permitting A. ACHD Coordination 1. A kickoff meeting will be held with the City and ACHD to establish acceptable corridors. This is anticfpated to include meeting with ACHD to obtain available construction plans and pertinent design information for the Ten Mile Road widening project and associated Ten Mile Creek Bridges} construction. 2. Preliminary design plans (60~) will be submitted to ACRD for review and comment.. Pertinent comments will be addressed. 3. 90% complete plans and technical specifications will be submitted to ACHD for review and comment. Ciry ojMerutian -Task Order 0610C Ten Mile Road (Franklin-Cher-v): Sewer Main & Re-use Pipeline /mpmvemenrs Page - 4 J-U-B ENGINEERS, Inc. Attachment 'A' - 108-iQ0 B. Drainagellrrigation District Coordination and Permittfng 1. Permitting with Nampa-Meridian Irrigation District (NMID} will be required. J-U-6 will prepare one (1) license agreement wilt be required under Ten Mile Creek, Ten Mile Stub Drain, and the Eightmile Lateral at Ten Mife Road, and Ten Mile Creek at the Franklin Bridge. J-U-B will prepare the necessary license agreement applications and exhibits. Legal descriptions will not be required with the crossings in the public ROW. C. USCOE 404 Coordination with ACRD 1. J-U-B will coordinate with ACHD throughout the project and request that ACHD incorporate the Gity's work into the District's permit. D. UPRR Coordination and Permitting 1. J-U-B will coordinate with the UPRR and prepare the necessary application for construction of the bored undercrossing. it is assumed that the crossing will be completed in the Ten Mile Road ROW, and that no wetlands will be impacted. 2. Final design and construction documents will include permit provision. E. IDEQ Submittal Packages 1. J-U-B shall coordinate, prepare, and submit final construction plans, specifications, and checklists for approval to the Idaho Department of Environmental (IDEA). Task C -Construction Assistance Services J-U-B's level of effort during construction shall be as a consultant to the City. ACHD's Project Manager (PM} is acting as the Engineer and the City inspector wilt serve as the Resident Project Representative (RPR) on the City portions of the construction project. 1. Construction Assistance, Staking, and Record Drawings A. Construction Assistance Services 1. J-U-B will attend the pre-construction conference, if requested by the City, to discuss the project with the ACHD contractor and address questions during the meeting. 2. J-U-B will attend progress meetings throughout the duration of the construction as specifically requested by the City. It is assumed that two (2) meetings per month, over a period of two (2) months will be required. It is assumed that the contractor will provide meeting minutes. 3. Shop Drawing and Product Data: J-U-B wilt review shop drawing and product data submittals for general concurrence with the design concept and technical specifications. 4. Construction Administration: On an as-needed basis, as requested by the City, J-U-B witl assist the City in the review of contractor pay estimates, claims, change order and work directive preparation, and other miscellaneous construction administration activities. 5. Substantial and Final Site Visits: J-U-B will field review the project with the City assigned inspector and jointly prepare a tentative punchlist of construction items which wilt be City of Merullan -Task OrderO610C Tea Mrle Road (Franklin-Clurrv): Sewer Maln & Re-use Pipeline h»provemenu Page - 5 d-U-B ENGINEERS, Inc. dttachment 'd' - 1Q-08- 700 submitted to ACRD. Upon notification from ACHD that the tentative punchlist items have been completed, a final punchlist will be prepared with the City inspector. B. Construction Staking 1. J-U-B shalt provide one (1) set of construction control stakes in accordance with the approved plans for the trunk sewer and reclaimed water pipeline. ACHD's contractor shall be responsible for laying out alt work and protection of the control staking. Re-staking wilt be performed on an additional time and materials basis. The following stakes wilt be provided: A. Structures: Manholes will be staked to centerline with two {2) offset stakes. Each stake will be marked with the cut/fill to the indicated elevation. B. Gravity Sewer and Reclaimed Water Pipeline: Stake at 100-foot increments and at all angle points beginning at connections. At each location, two (2) offset stakes will be provided with cut to invert elevation indicated. C. Record Drawings 7. J-U-B will prepare record drawings from drawings received from the Contractor and City's RPR. Field survey work will established record invert elevations on the completed trunk sewer manholes. Two (2) mylar sets of the record drawings and one (1) CD will be delivered to the City for submittal to IDEA and City use. Each sheet will be sealed by a professional engineer with the disclaimer "These Record Documents have been prepared based on information provided by others. J-U-B Engineers, INC. has not verified the accuracy of this information and shall not be responsible for any errors or omissions which may be incorporated herein as a result. The seal{s) of the registrants represent that the preparation of these documents was completed by staff under the registrants' supervision". Clry of Meridian -Task Order 06100 Ten Mile Road (Frank/i»-Cherry}: SererMaia & Re-use Plpelfne /mproiemenu Page - 6 ~" 1 ~ I ~ ~I {~'~ . ~ !~' ~°~'aI3!' Ian`-~~~ ~'3 ~f 3• ~A~ jp I ~ m~ ~ ~~ I ~~~ rn 13 .a ~13' !S rn_ ~O p , ! v m.~ • l p `''4lg I , S ' ~~' '~ ' • ~I .~~ ~.: ~ g gq ~ - ~ m ; i~ ~ " ~ r , m y m ~ m C 6~t ~~ff ! ~a p ,O'i (Cg~~~ P2 ~9' ~',,,i O' ~ ~3~iicpm,g vg•~~~ ;~. ~ c ~ i~o'~ o1w; ~! ~ ~ t5'' ' ~IC~n 3 ~ ~' i ~ tpp it 7 ~m €.ZC~ ° a'Dfff-~u~I ~ ~ ° . ~,~ ~ ,pe ~ r y~q 17 L Ax~~~o-_ ~ ~ '~ ~3iAr ' `~ z Q p~~ a I W p ~ ' ta 5 eo I m ~ ~ :n ~ D Z fA. o ~ I .O !m ^ I ~ I~ I~I IS '~. .. m ~ZI?. (p l- ~, ~ 'al 'DSO ~ o ~i ~~:~ m g O' .~ ° ~ ~ b' I i C ~ , m ~ ~sIO=°~ 12 ~ 4~ C bS~T~ A ~ i~~l ~~C = ro ~ : . I i . ~ ~ ~ ~ ~ p m W - I W - - ._ t .. N N _ ~ ~ .. _ _.. ~ ._ .c ._ .. N ~^` N :N A INCA N.AI ' I I I W G mIN ~ ~-. N,W I IN ~ .. _ ~ O V I + N A m m ~ ... IW m,ON~ ~ , D ~0'}~I V ~N IW W m _ N N.. .I._ . i Z ' ~ I I ' , I I ~~ ~ 1 i ~ ~ ' q ~ ~ .. 1 _ ~ I I ~ _ ~ ~ 41 ~ W. N_ Ri - ~ ~ m ~ i N N~ _.. ~. ._. .. m a m .. N ~ ,m (N IN m'm' I . .. _ I v ~ ~O!A ~ ... - _.. ~m ,m imp ~ j 1.. __ I - ~~ ~° I ! _ I $ O i ~ - ~ ~ ~ ~ i ! . - ~ I ~ A ~~ 4m I - ~ i f W ~ W _ _.._ r I ~ ~i t. ~ . _.-.. ..._. _ - T __. N ~ 1 ~ I ~ i H , ~ ~ , ~ v ~ I .__. ~ .. _ ~.'__6 _. ~._~. .. 1 I I ~ I I I I I+ ~ ' I I I I ~ ~ ~ .. .. I ! .. - I 1 1~ i _ 1 I _. r iS mN V I I ~ ~ y L I qI f ~ ~, (yp ~: OaD m '. .p m~~ N~~~~ N m N:~ !~ Y~ _ ~j p VP~,NI O10' A ~ 4J ~ ~ tmJ W ~ ~ ! W + ~ I I ((qq t~ ~~pp tygg I~~(11 I I~ ~I I0 ~7C - _ _ j _ _ N __.,y. _. __ ~ _, _ ' ~ ...IN ~ ~WI _O.O F T _ -j o ~ W ~~IH.N ~tA.~ ~', ~ ~ cNi+w ~ IW~-. !'sI~ ~ tA! ( fy ~I~A`ai ~ 4t I !y Hi~ I N ;O ~ !9 Ac ~, ± ~i'iFo~v'.°~ ~, Cg c S ' ', ' I ~ i ~ i ~ ~ I I I I ' ~.. g _ I d ~ . ~OI'O' I~~~,~I I~i~'~4 '°;:~' ~ '~ ;~ c Inl ;~''°m. ,3 ~! i~! a~~l$,~ ~ i1C~~ ,m r ;~! a;~i~ ~~p~1'~~ ~p~~ ~ ~~''~ ~b`~ ~ `~• '~ ~ ~{~i ~r3 a,g /~ ~ ~ 3 ,A ^'. '3IC I ~ fsP ~ ~~ € ; ~ ~ ;'~1 ~ i~ '~y~ !Wi'g' m ,g! 1 y, ~ a~ g: ~ 'tO rr° ~ ~ C I C ~ I ~ ~ ,~ ~ ~ ~ C7 O O I -a ~~ I~ i -t ~ i ~ ~ , a ~ o a ~ ~ I F; ~ i ~ I i m ~ j _ I m r ~~ ! . ;, ~ ~ , ~ ' -;_ -t-.,- ! .~- - , . ~ N -, i ~ ~ i ~ I I ; '...I N' .i.. Q ' ~ i .s~&Y! ~ t W .O/1EO~N C> N ~ ~ ~ Y ~_. ~--j. i ._. ~. .. OD _ Oot , W t4ft,f ® N t>j, W _N A) I ~ i ~ ; ' i ~ i i ' ~ I ' ; I ..i E A N30~•.P ' _j._ Of W• A A i ~ -f ~ ~ , .0p W ,N.A. 1 ~ I~ ~ _ ~Ca~NI - I I ~ ~ ~ I I I ~ I J 1 ~ ' ~-~- - ~ .. ~ ~-- -~. _i i i ' i ! , i i :: 1 ~ I i i t. , ' (. ... 2. ~ .. 1. p A I ' ~ ' i i .A O A.OI~ ~ ~ ' r"' °~ i I I , Ali ~I~ ~ i ~ I! ~~,.t} , > ' C1 .A.w , LL 1 ~ ~ 1 . r~ . ~-.. .. -_ . ... , i ~ ~ ~ -r - ~ i. .~-~--• ~-t ,.... ,r I ! Ili ! j ' I ' I W h ~ i ~ I II IV I~, ' ~ ( ~~ ~I~-ro!~IV! A !~. ~ ;~~ i 1 ' w i~ ~~ NNw ~N~.~({(p~pw~~ ; IW V' ~ _ `-.. V W V.OD lm ~ N iN- til _._ m N Yri N IW ~A~ 1..i. _. i ~ °«I i „_~ ~ w~, j~pp: (~~f j ~ IFS ~ .. .~~J+~~ 1N ~wl V O~~ f fwl •O O~ ~ r~l ~ tOli ' O ~ ~~ ~ A 1N1 ..~ I ~ O'Ot~~!ODIN ~ I M II 1 ! !1 • ? ~ 1 ~I ' x a.,: oa= ~i7 o~~ ~ ' Avg A3 c" a m~ ~~ o~ -mot Z r~ N J-U-B ENGINEERS, Inc. crrY of MERIDIAN TEN MILE ROAD (FRANKLIN ROAD TO CHERRY LANE) SEWER MAIN AND RE-USE PIPELINE IMPROVEMENTS Task Order 06100 ATTACHMENT "B" - ITEMS PROVIDED BY THE CITY Attachment'"B"- 10.08.1D0 1. Provide on-going review of J-U-B's work and timely considerations of policy issues with in a time acceptable to the City and J-U-B. 2. Copies of development plans, concept plans, preliminary plats, etc. as available in the project area. 3. Pay far all permits, fees, or other payment required to secure permitting for the design and construction of the proposed improvements. 4. Record drawings of City facilities and other relevant City information of record in project area. 5. Provide a private development liaisonlcontact person. 6. Sizing and pressure class of re-use pipeline. Ctry of A-lertdian -Task Order 06!/70 Ten Agile Road (Franklin-Cherry): Seicer Main & Re-rrse Pipeline /mprovementr Page - ~ J-U-B ENGINEERS, Int. Attachment 'C - 10-Q8-1D0 CITY OF MERIDIAN TEN MILE ROAD (FRANKLIN ROAD TO CHERRY LANE) SEWER MAIN AND RE-USE PIPELINE IMPROVEMENTS Task Order 06100 ATTACHMENT "C" - FEE SCHEDULE Basis of Fee and Billing Schedule The City shalt pay J-U-B far its services and reimbursable expenses as follows. A detailed tabor and equipment is presented in Exhibit "A-1 ": Task A -Trunk Sewer Preliminary and Finai Design Preliminary and Final Design Lump sum price .............................................................................. $25,856 Task B -Agency Coordination and Permitting Agency Ordination and Permitting Time and material basis with an estimated budget of .................................. $7,144 Task C -Construction Assistance Services Construction Assistance Services Time and material basis with an estimated budget of .......:......................... $13,994 City ofMeridian -Task Order0610C Ten Mile Road (Fmnkiin-Cherry): Sewer Main do Re-use Pipeline lrnprovements Page