Loading...
HomeMy WebLinkAboutChange Order No. 1 with Terra West, Inc. for Phase V East Parking Lot New City HallltaYl ~~ ~ U i CITY OF MERIDIAN 33 EAST IDAHO MERIDIAN, ID 83642 CONTRACT CHANGE ORDER CHANGE ORDER ND. 0'I pROJECI' N~. Cil'1'~'~1 DATE: 12/8 E~ECTivE DATE: CONTRACTOR: T®ma WaBt, Inc. PROJECT: MERIDIAN CITY HALL - Phase V -East Parkhtg Lot The Contractor ~ here~l directed to make Lire r~h~ng elranges Iran fire Contract Daeaarrerrts and Pte. Desalp~ton: h~corParats eevisk-rre for ASI 11F140, ASI 1F141, ASI #1~, ASI IH47, A81 iN158, estd A81 S'I84 for Mtsa Work Changes ALL OTHER TERMS ANO CONDITIONS REAWN THE SAME Rss~n fot Mtge Ordsr: Additional seape w rev~lons pet listed ASI's atM RFI's AtteadunerRS: Change order daacflpdon, dated 1?JZ~IM, wltt- corttraator quotes CHANGE IN CONTRACT PRICE: CHAN©E IN COI~Ti~ACT TIAAES: Origir~l Contrast Prime $127,>~0.00 ~ Contract Tbrrea: substanbiai Completion 10P3tt08 Net ohartgas form pre+r~a Chatge Orders Nat c9tar~ tam precious Change Ordms Nmte No.~ to _ (calendar days) $0.00 Nana Contract Price Poor to Change Order. Cordrae~ Tsn~ pnw to ~ Change Order. (calendar days ~ date) $127,900.00 ~ or3v Nat Increase (d~eaeaee) ~ this Change Orr: Net In~+~sa (daxaeee) of this change orcMr. (daysordade) $18,364.00 Norre Contract Price with all Apprara! Change Orders ContraC TirttaB wl~ all A~roved Change Order {ceterdar days) $14T,~4.00 Subs~iitlal CompleSon: 1W31/2008 . ia~r~srRtri ~ ~ _ ~ ~ / -- _ Petra ire. ~ Terra Walt, ins. GrG~ By:Thomas R CarghAn _-- Byr. Dray Date: ~ Q i~ ~' Q, . (drY G~~ ~ / / L APP1~1/AL 13Y I(e(tlr Walla / v Date: ~, _. ~ Date: APPROVED: (CITY) - ATTEST: By: Maya Tammy de Weeni By: City Cld1c, Jaycee Holman DaM: Die: CHANCE ORDER No. 00001 323-4500 BOISE. IDAHO RCE 1875 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: {208) 323500 • FAX: (208) 323-4507 TITLE: ASI & Misc. Changes - Phase V DATE: 12/31/2008 PROJECT: Meridian City Hall JOB: 060675 TO: Attn: Eric Howard CONTRACT NO: Terra-West mailing : ~ Box 904 phy:15977 Gunfire Rd, Caldwell 83507 Eagle, Idaho 83616-0904 Phorte:208-459-4477 Fax:208-459-6211 RE: To: From: Number: DESCRIPTION OF CHANGE **All taxes are included in casts** Item Description 00001 ASI #140 -Contaminated Soil Removal (CAR #11). Remove and dispose of contaminated sail an old gas station sUe as directed by MTI per City direction. Terra-West Work Order WO-0i, dated 9/9/08. 00002 ASI #1412 - Monitoring Wellhead Detail (COR #12). Add new steel sleeve casing & Ild to 10 existing monitaring wells. Terra-West quote 12/1/08. 00003 ASI #13fi -East Parking Lot Revised Drawings (COR #14). Lutall one additional etch basin in the alley and add striping and signs per ACRD comments. Terra-West quote 12/1/Q8. ($2,118.00). Extra prep/demo. Take out additional sidewalk & approach at Zamzows per ACHD, safety fence at intersection for irrigation box. Terra-West quote 12/10/08. ($1,860.00) 00004 ASI #147 -Precast Parking Bumpers (COR #15). Famish and install it precast parking bumpers for east parking lot only. Terra-West quote 12/1/08. 00005 ASI #155 -Railroad Track Paver Walkway (COR #16). Prep area for ~ncrete walk. Terra-West Quote 10/24/08. 00006 ASI #164 -Irrigation Box & Manhole Revisions (COR #18). Furnish and install revised precast irrigation box and new manhole. Terra-West quote 12/22J08. 59 Tax Tax Net Qua~ty Units Unit Pr1ae Rare Amoum /Unount 1.000 L5 $4,337.00 0.00% $0.00 $4,337.00 1.000 LS $1,100.00 0.00% $0.00 $1,100.00 1.000 LS $3,978.00 0.00% $0.00 $3,978.00 1.000 L5 $951.00 0.00% $0.00 $951.00 1.000 LS $927.00 0.0090 $0.00 $927.00 1.000 LS $8,071.00 0.00% $0.00 $8,071.00 Unit Cost: $19,364.00 Unit Tax: $0.00 Lump Sum: $0.00 Lump Tax: $0.00 0.0% GC markup: $ Total: $19,364.00 The Original Contract Sum was ................................................................................................ $127,900.00 Net Change by Previously Authorize! Requests and Changes ................................................ $0.00 The Contract Surn Prior to This Change Order was ...................................................... $127,900.00 The Corlitri~ct Sum Wilt be Increase! ................................................................................... $19,364.00 The New Contract Sum Including Thls Change Order ...................................................... $147,264.00 The Contract Time Will Not Be Changed ................................................................................. The Date of Substantial Completion as of this Change Order Therefore is „~ .......................... Petra Incorporated ~ LCA Arc rtects, P ~= ~~ ~ By: d o Co in Steve Christensen Hate: _ / c~ ® Hate: ti [ 5191 MERIDIAN CITY HALL PROJECT NO: CH-06-001 TERRA-WEST INC (58) - Phase V East Parking Lot CHANGE ORDER NO 1 12/26/08 CHANGE ORDER ITEMS 1 ASI 140 Contaminated Soil Removal (COR#11) 4,337.00 Remove and dispose of contaminated soil on old gas station site as directed by MTI per city direction Terra-West work order W0-01, dated 9/9/08 2 ASI 141 Monitoring Wellhead Detail (COR#12) 1,100.00 Add new steel sleeve casing & lid to 10 existing monitoring wells. Terra-West quote 12/1/08 3 ASI 136 East Parking Lot Revised Drwgs (COR#14) 2,118.00 Install one additional etch basin in the alley and add striping and signs per ACHD comments Terra-West quote 12/1/08 Extra prep/demo, take out additional sidewalk 8 1,860.00 approach at Zamzows per ACHD, safety fence at intersection for irrigation box. Terra-West quote 12/10/08 3,978.00 4 ASI 147 Precast Parking 8umpers(COR#15) 951.00 Fumish and install 11 precast parking bumpers for east parking lot only. Terra-West quote 12/1/08 5 ASI 155 Railroad Track Paver Walkway (COR#16} 927.00 Prep are for concrete walk. Terra-West quote 10/24 6 ASI 164 Irrigation Box & Manhole Revisions (COR#18) 8,071.00 Fumish and install revised precast irrigation box and new manhole. Terra-West Quote 12/22/08 19,364.00 Page 1 of 1