HomeMy WebLinkAboutChange Order No. 1 with Tri State Electric for Phase 3 Tenant Improvements and MEP New City HallCITY OF MERIDIAN
33 EAST IDAHO
MERIDIAN, ID 83642
CONTRACT CHANGE ORDER
CHANGE ORDER N0. 01
PROJECT NO. CH-O6-001
DATE: 12/28/07
EFFECTIVE DATE:
CONTRACTOR: TRI-STATE ELECTRIC
PROJECT: MERIDIAN CITY HALL -Phase 3 Tenant Improvements & MEP
The Contractor is hereby directed to make the following changes from the Contract Documents and Plans.
Description: Electrical Scope revisions ASI-25, 26, 37 8 RFI-043
001 Add iwo 1000 Watt Security Lights on existing pole, for site security and safety. $ 1,934.31
002 Add temporary lighting in basement to facilitate construction until switch-gear $ 1,242.30
arrives on site.
003 Add 200% Neutral Bus Duil at BD-LA ~ BD-LB. Reduce feeder at °P° between $ (12,471.80)
MSBL and IPCO 208V transformer to 8 ee 4° conduits each with 4-500 MCM
conductors.
004 Replace specified light fixtures, fittings, & conduit with NEMA 4 Vaporproof rated $ 1,717.59
components per ASI 36
005 New ends on temporary power cords to meet safety requirements. $ 854.34
008 A-V floor box to be cast in concrete prior to A-V scope of work being bid. $ 658.30
Necessary to avoid delays in placement of concrete slab-on-deck.
TOTAL $ (6,064.78)
ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Reason for Change Order: Additional Scope per ASI's 25, 36, 37 & RFI-0043
AttachmerKs:
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price $ 2,749,895.00 Original Contrail Times: Substarrtial Completion 8/28/08
Net changes form previous Change Orders Net changes form previous Change Orders
No._ to _ No._ to _ (calendar days)
$ . 0 - None
Contract Price Prior to this Change Order. Contract Times prior to this Change Order.
(calendar days or date)
$2,749,895.00 ~2el2oos
Net Increase (decrease) of this Change Order. Net Increase (decrease) of this Change Order.
(calendar days or date)
($6,064.76) None
Contrail Price with all Approved Change Orders: Contract Times with all Approved Change Orders:
{calendar days)
$2,743,830.24 Substantial Completion 8/28/2008
RECOMMENDED: (CONSTRUCTION MANA ) ACCEPTED: (CONTRACTOR)
PETRA INC .i TRl-STATE E CTRIC
By: Tom Coughlin By: Jay Goode S
~~
Date: g~ 4 ~ ?4. •~,.'~ ..
Date:
PI~RC AGENn
APPRO COUNCIL APPR VA
j)
/ /
/~/~
/
\t
~ 14 i:l llif
/
v
By: Ke atts
Date: l~ ~ . D ~ ~{
`~
Date: / - '~ ~ ,~
APPROVED: (CIT`~ - ATTEST: ~J
T
W
d
d B
Cit
Cl
k
eer
ammy
e
By: Mayor
D y:
er
,
y
Date: Jay~se~oi - ~'
ate: Z_ fS~v~
f'/
a,
o`
~r.~
v
CHANGE ORDER
No. 00001
323-4500
BOISE, IDAHO
1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507
TITLE; ASI 25 , ASI 36, ASI 37 & RFI 43
PROJECT: Meridian City Hal!
TO: Attn: ]ay Gooden
Tri State Electric
7790 Mossy Cup
Boise, ID 83709
Phone:208-362-4636 Fax:208-362-1716
RE: COR To: TRISTA
QESCRI1~~~1~ 0~ ~H°AN G+ E
DATE: 9/19/2007
JOB: 060575
CONTRACT NO: 34
From: CITYMER Number: 00001
Change 2 runs of 800 A 208Y/120V Bus Duct to 200% Neutral on Bus Duct run CTB-LA and CTB-LB in accordance with ASI 25
as issued by LCA dated 09-11-07.
,:.
::, .:.
_
_
arc
:.
_,
>tem::iptior~,
F-.[Jhlts lTr~ce: ~ltste ~J~tt
Amouirt
ODn01 Add two 1000 Watt SEcudrty Ughts on existing pole, for site security and safety. 1.000 LS $1,934.31 0.00% $0.00 $1,934.31
~ Add temporary lighting in basement to faal'~tate constn~ction until switch-gear 1.000 LS $1,242.30 0.00% $0.00 $1,242.30
arrives on site. South side $665.00, North side $577.30
00003 Add 200% Neutral Bus Duct at BD-LA & BD-LB. Reduce feeder at "P" between 1.000 LS ($12,471.60: 0.00% $0.00 ($12,471.60)
MSBL and IPCO 208V transformer to 8 ea 4" conduits each with 4500 MCM
conductors.
00004 Replace specified light fixtures, frttings, & conduit with NEMA 4 Vaporpr~f rated 1.000 LS $1,717.59 0.00% $0.00 $1,717.59
components per ASI 36.
00005 New ends on temporary power Ards to meet safety requirements. 1.000 LS $854.34 0.00% $0.00 $854.34
00006 A-V floor box to l~ cast in concrete prior to A-V scope of work being bid. 1.000 LS $658.30 0.00% $0.00 $658.30
Necessary to avoid delays in placement of concrete slaty-on-deck.
Unit Cost: ($6,064.76)
Unit Tax: $0.00
Lump Sum: $0.00
Lump Tax: $0.00
0.0% GC markup: $0.00
Total: {$6,064.76)
The Original Contract Sum was ................................................................................................. $2,749,895.00
Net Change by Previously Authorized Requests and Changes ................................................ $0.00
The Contract Sum Prior to This Change Order was ...................................................... $2,749,895.00
The Contract Sum Will be Decreased ................................................................................... ($6,064.76)
The New Contract Sum Including This Change Order ...................................................... $2,743,830.24
'~''~~ Contract Time WIII Not Be Changed .................................................................................
Date of Substantial Completion as of this Change Order Therefore is ..............................
ACCEPTED:
Tri State Electric City of Meridian
By: sy: sy:
Jay Gooden
Date:
Date:
Keith Watts
Date: