HomeMy WebLinkAboutChange Order No. 1 with Tri State Electric for Phase 3 Tenant Improvements and MEP New City HallCITY OF MERIDIAN 33 EAST IDAHO MERIDIAN, ID 83642 CONTRACT CHANGE ORDER CHANGE ORDER N0. 01 PROJECT NO. CH-O6-001 DATE: 12/28/07 EFFECTIVE DATE: CONTRACTOR: TRI-STATE ELECTRIC PROJECT: MERIDIAN CITY HALL -Phase 3 Tenant Improvements & MEP The Contractor is hereby directed to make the following changes from the Contract Documents and Plans. Description: Electrical Scope revisions ASI-25, 26, 37 8 RFI-043 001 Add iwo 1000 Watt Security Lights on existing pole, for site security and safety. $ 1,934.31 002 Add temporary lighting in basement to facilitate construction until switch-gear $ 1,242.30 arrives on site. 003 Add 200% Neutral Bus Duil at BD-LA ~ BD-LB. Reduce feeder at °P° between $ (12,471.80) MSBL and IPCO 208V transformer to 8 ee 4° conduits each with 4-500 MCM conductors. 004 Replace specified light fixtures, fittings, & conduit with NEMA 4 Vaporproof rated $ 1,717.59 components per ASI 36 005 New ends on temporary power cords to meet safety requirements. $ 854.34 008 A-V floor box to be cast in concrete prior to A-V scope of work being bid. $ 658.30 Necessary to avoid delays in placement of concrete slab-on-deck. TOTAL $ (6,064.78) ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME. Reason for Change Order: Additional Scope per ASI's 25, 36, 37 & RFI-0043 AttachmerKs: CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price $ 2,749,895.00 Original Contrail Times: Substarrtial Completion 8/28/08 Net changes form previous Change Orders Net changes form previous Change Orders No._ to _ No._ to _ (calendar days) $ . 0 - None Contract Price Prior to this Change Order. Contract Times prior to this Change Order. (calendar days or date) $2,749,895.00 ~2el2oos Net Increase (decrease) of this Change Order. Net Increase (decrease) of this Change Order. (calendar days or date) ($6,064.76) None Contrail Price with all Approved Change Orders: Contract Times with all Approved Change Orders: {calendar days) $2,743,830.24 Substantial Completion 8/28/2008 RECOMMENDED: (CONSTRUCTION MANA ) ACCEPTED: (CONTRACTOR) PETRA INC .i TRl-STATE E CTRIC By: Tom Coughlin By: Jay Goode S ~~ Date: g~ 4 ~ ?4. •~,.'~ .. Date: PI~RC AGENn APPRO COUNCIL APPR VA j) / / /~/~ / \t ~ 14 i:l llif / v By: Ke atts Date: l~ ~ . D ~ ~{ `~ Date: / - '~ ~ ,~ APPROVED: (CIT`~ - ATTEST: ~J T W d d B Cit Cl k eer ammy e By: Mayor D y: er , y Date: Jay~se~oi - ~' ate: Z_ fS~v~ f'/ a, o` ~r.~ v CHANGE ORDER No. 00001 323-4500 BOISE, IDAHO 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 TITLE; ASI 25 , ASI 36, ASI 37 & RFI 43 PROJECT: Meridian City Hal! TO: Attn: ]ay Gooden Tri State Electric 7790 Mossy Cup Boise, ID 83709 Phone:208-362-4636 Fax:208-362-1716 RE: COR To: TRISTA QESCRI1~~~1~ 0~ ~H°AN G+ E DATE: 9/19/2007 JOB: 060575 CONTRACT NO: 34 From: CITYMER Number: 00001 Change 2 runs of 800 A 208Y/120V Bus Duct to 200% Neutral on Bus Duct run CTB-LA and CTB-LB in accordance with ASI 25 as issued by LCA dated 09-11-07. ,:. ::, .:. _ _ arc :. _, >tem::iptior~, F-.[Jhlts lTr~ce: ~ltste ~J~tt Amouirt ODn01 Add two 1000 Watt SEcudrty Ughts on existing pole, for site security and safety. 1.000 LS $1,934.31 0.00% $0.00 $1,934.31 ~ Add temporary lighting in basement to faal'~tate constn~ction until switch-gear 1.000 LS $1,242.30 0.00% $0.00 $1,242.30 arrives on site. South side $665.00, North side $577.30 00003 Add 200% Neutral Bus Duct at BD-LA & BD-LB. Reduce feeder at "P" between 1.000 LS ($12,471.60: 0.00% $0.00 ($12,471.60) MSBL and IPCO 208V transformer to 8 ea 4" conduits each with 4500 MCM conductors. 00004 Replace specified light fixtures, frttings, & conduit with NEMA 4 Vaporpr~f rated 1.000 LS $1,717.59 0.00% $0.00 $1,717.59 components per ASI 36. 00005 New ends on temporary power Ards to meet safety requirements. 1.000 LS $854.34 0.00% $0.00 $854.34 00006 A-V floor box to l~ cast in concrete prior to A-V scope of work being bid. 1.000 LS $658.30 0.00% $0.00 $658.30 Necessary to avoid delays in placement of concrete slaty-on-deck. Unit Cost: ($6,064.76) Unit Tax: $0.00 Lump Sum: $0.00 Lump Tax: $0.00 0.0% GC markup: $0.00 Total: {$6,064.76) The Original Contract Sum was ................................................................................................. $2,749,895.00 Net Change by Previously Authorized Requests and Changes ................................................ $0.00 The Contract Sum Prior to This Change Order was ...................................................... $2,749,895.00 The Contract Sum Will be Decreased ................................................................................... ($6,064.76) The New Contract Sum Including This Change Order ...................................................... $2,743,830.24 '~''~~ Contract Time WIII Not Be Changed ................................................................................. Date of Substantial Completion as of this Change Order Therefore is .............................. ACCEPTED: Tri State Electric City of Meridian By: sy: sy: Jay Gooden Date: Date: Keith Watts Date: Expedition