Loading...
HomeMy WebLinkAboutTask Order No. 2.1 with JUB Engineers for Ten Mile Creek Sewer Crossing ReplacementCITY OF MERIDIAN P~~~ w,,~ks Pt-o,Qr 07S 3 TASK ORDER NO. ~; l _FOR ENGINEERING SERVICES FOR WATER, WASTEWATER, AND MISCELLANEOUS PUBLIC WORKS PROJECTS TEN MILE CREEK SEWER CROSSING REPLACEMENT City Project No. Engineer Project No. 10-Q8-011 THIS TASK ORDER, entered into this day of ,2008, between City of Meridian, Idaho, hereinafter referred to as the °CITY°, J-U-B ENGINEERS Inc hereinafter referred to as the ENGINEER, is subject to the provisions of the Agreement for Engineering Service for Water, Wastewater, and Miscellaneous Public Works Projects, approved December 12, 2006, hereinafter referred to as the MASTER AGREEMENT for PROFESSIONAL SERVICES. WITNESSETH: WHEREAS, the CITY intends to tronatn ~ imern~emerlts to the Ten Mile Creek Sewer C,rossitxr, hereinafter referred to as the PROJECT; NOW, THEREFORE, the CITY and _ J-ll-B ENGINEERS inc in cons~eration of their mutual covenants herein agree in respect as set forth below. CITY INFORMATION AND RESPONSIBILITIES: The CITY wilt provide to ENGINEER the data and/or services specified in the AGREEMENT. In addition, the CITY will furnish to ENGINEER items listed in Attachment °B°. SCOPE OF SERVICES TO BE PERFORMED BY ENGINEER: ENGINEER will provide those services described in Attachment °A° SCHEDULE OF WORK TO BE PERFORMED: ENGINEER will perform said services in a timely manner. BASIS OF FEE AND BILLING SCHEDULE: The CITY wilt pay ENGINEER for its services and rehrrbursable expenses as folwws: as shown on Attachment °C°. file Folder Title: Cipl of Merkiian -Ten Mile Creek Sewer Grossing Remarks: iN WITNESS WHEREOF, the parties hereto have executed this TASK ORDER as of the day and year first above written. CITY: City of Meridian, Idaho ENGINEER: J-U-B Engineers, Inc. 33 E. Idaho St 250 S Beachwood Ave, Ste, 201 Me~rjidyi~a~n,,, ID 63642 Boise, ID 837 gy. ~ By: ~~ `ri i, ~~` •( ';. ~ "~ ': NamelT'rtle: d or NamefCttle: P ' ' b ' O `' PUBLIC WORKS APPROVAL: ATTES ~ - By: ~ a_ -li ~~ By: ~~~~ _ ~o~ ~ y Name/Title: r Pn Gradv P E City Engineer NameJTdle: iatw&r.6tare~.lre. City ale Inc _ ~, ` 1"p JFl~ft` ~OrP1'laYt % ~+ APpr„,~b7 Cry ~~~;~ ~,~, y z6, z,ooV ''~-~,,, ~,,-r~ . ~'.~~''~ J-U-B ENGINEERS, Inc. Attachment 'A' - fa-~-Of f CITY OF MERIDIAN TEN MILE CREEK SEWER CROSSING REPLACEMENT This project provides design of the replacement of the Ten Mile Creek sewer crossing as described herein and shown on Figure 1. It is assumed that the project will be designed as one {1 ~ bid package, and that the City will serve as the Engineer during constrtxtion phases. Table ~ Contents: Attachment "A" -Scope of Engineering Services • Task A -Project nes • Task B -Feasibility Analysis • Task C - Preliminary and Finai Desism • Task D - Ad itional Services • Task E - Ageencv Coordination and Permitting • Task F -Easement Coordination Exhibit A-1 -Labor and EcRdfament Detail • Figure 1 -Protect Overview Attachment "B" -Items Provided by City Attachment "C" -Fee Schedule City of Meidian -Ten Mile Creek Sewer Crossing Replacement Page - l .r-u-s ~ri~~zs, r-~. artadmenc ~a ~ - raoe-vr r CITY OF MERIDIAN TEN MILE CREEK SEWER CROSSING REPLACEMENT Attachment "A" -Scope of Engineering Services Proiect Understandinit The fallowing is J-U-B's understanding of the Project. The City of Meridian identified a s~ment of the Ten Mile Trunk, crossing Ten Mile Creek, that has failed or is nearing failure. The aerial sewer crossing is an un-sleeved 15-inch diameter steel carrier pipe. The Project includes a preliminary evaluation to determine a preferred replacement method, pipe material(s), and alignment. The project includes design of the replacement and possible upsizir~g of the 15-inch Ten Mile Trunk Sewer Crossing of which includes approximately 725 lineal feet from the existing Ten Mite Interceptor/landing Lift Station diversion structure to the manhole near the intersection of W. Kimra Street and S. Heidi PEace. The project does not include hydraulic modeling of the sanitary sealer system or Ten Mile Creek. Task A~Proiect Meetinlts 1. Proied Meetirtas A. Attend progress meetings, as required over the duration of the project for the purpose of updating the City, presenting information, designs, and facilitation of issues. An assumed number of meetings is shown on Exhibit A-1. B. Attend property owner meetings, if requested by City, to present project information and identify property owner issues that affect design and construction. Task B -Feasibility Analysis 1. feasibility Analysis A. Review feasibility of alternate trunk sewer replacement methods, materials, and locations as follows: • Open "cut and cover" replacement of buried trunk sewer at existing alignment easement corridor. Pipe bursting existing of concrete pipe. • Replacement of aerial crossing with PVC carrier pipe and steel pipe sleeve. • Replacement of aerial crossing with alternate pipe materials such as ductile iron or fiberglass reinforced pipe. • Alternate sewer crossing location and alignment. • Short term temporary replacement of failing section of aerial crossirq; followed by tong-term solution involving one of previously listed options in this paragraph. B. Prepare a draft summary letter report and submit three (3) copies to the City for review. C. Incorporate applicable review comments and issue final letter report to City. Ciry of Meritiipn -Ten Mile Creek SewerCmssing Replacement Page - 2 J•U-B ENGINEERS, ~-K. arr+r ~a ~ - ~aaa-o~ ~ Task C - Prelimina_rtiand Final Design 1. Trunk Sewer Preliminarv 1)esisttt A. Research, Control, and Topographic Survey and Mapping 1. Research Ada County Surveyor's records for survey monuments to add in establishing horizontal control and include research of land monuments, plats, records of survey, right-of-ways, and easements of record along the preferred trunk sewer alignments. Worizontal coordinate system shall be based on NAD 1983 translated to the Ada County G.I.S. system. Vertical control shall be based on NIAVD 19>~. 2. Establish temporary construction benchmarks (T.B.M.'s) and control points on the south side of Ten Mile Creek and near W. Kimra Street. Conduct field research of survey monuments of ` adjoining subdivisions. 3. Contact utility companies {gas, power, telephone, storm drain, cable T.V., street lighting, traffic signals, irrigation) and other utilities identified along the alignment prior to survey to request field tocatior~s of utilities and to obtain available utility mappfng. 4. Complete topographic wrvey along the alignment as generally shown on Figure 1. Supplemental topographic survey of Ten Mile Creek cross-section will be developed at the crossing alignment chosen for final design. 5. Complete topographic mapping to AutoCAD 2008. The anticipated scale of the plan and profile drawings will be 1 "=z0' and 1 ~=5' vertical scale. Topographic features shall be depicted using standard symbols. Topographic features shall be shown on the construction plans to the extent that they are found or field located by the utility companies, such as fences, utility poles, surtacing, utilities, top of bank and waterway flowlines, and include monuments of record and physical survey of monuments and property pins that are found. Property lines will be shown based on Ada County G.1.5. mapping. Where easements are to be secured, property lines shall be determined using research from title reports and field search of found land monuments. C. t3asic iir Final Destgn of Trunk Sewer Et Crossin$ 1. Complete preliminary design of the preferred trunk sewer replacement option with considerations on constructability, wrtace disturbance, impact to waterways, sanitary separations, dewaterirng, impacts to public traffic access, utility conflicts, construction access, excavation depths, easement issues, maintenance of sewage conveyance, and other pertinent design issues. 2. Design details for the trunk sewer crossing will be provided including: aerial crossing of Ten Mile Creek; trench and bedding details, connectton details, surface details, and other spatial details needed for construction. 3. Prepare 90% complete construction plans and contract documents. It ~ antidpated that one (1) construction package will be prepared for the Ten Mile Creek Sewer Trunk Crossing. Pertorm design drafting in AutoCAD 2008 of the construction plans which will include project title blocks, City standard notes, vicinity maps, sheet indexes, north arrows, bar scales, topography, pipe size, type, slope, invert elevations, ground wrtace elevations, wrface repair, boring details, property lines, easements, found monuments and property comers, land ownerships, survey control, pay limits, special details necessary for a biddable product. Ciry of Meridian -Ten Mile Creek SewerCrossing Replacament Page - 3 J-U-B EMGII+tEERS, lnc. Atrcct-ment ~A' - iO.OS-Ot f Drafting shall be completed on 11 "x17" sheets, ANSI standard size "B" sheets. To the extent practicable, the 2002 City of Meridian Standard Specifications and Drawings for Construction will be utilized in the design. 4. Prepare technical specifications in accordance with the 2007 Edition of the Idaho Standard Public Works Construction (ISPWC) format, and City Standard Specifications and Drawings. J•U-B shall be responsible for preparing special provisions necessary for the project. If formally bid, Contact Documents will be prepared using ISPWC standard front-end documents and City revisions. 5. Submit three (3) sets to the City for review. 6. Prepare 100% complete construction plans and contract document for agency review and approvals. Provide an estimate of probable construction cost. 7. Incor~rate appropriate revisions as suggested by the City and reviewing agencies in the final set of pions and contract documents. 8. Develop and issue to the City a final opinion of probable construction cost. D. Constructability Review and RNQC Review 1. Complete in-house constructabifity review and Qq/Qc review of the 909K complete construction plans and contract documents. Incorporate appropriate suggestions into project design. Task Q -Additional Services J-U-B will initiate these services only upon approval by the City. 1. Geotechnical InvesNstation and Analysis J-U-B will retain the services of an Idaho licensed geotechnical subconsultant to provide a geotechnical reconnaissance and related geotechnical engineering support servkes as described below. The focus of the exploration will be to provide the design team base data and information to Bidders on subsurface conditions south and north sides of the Ten Mile Creek sewer crossing. The cast listed in Exhibit A-1 is budgetary value. An estimate from Strata, Inc. wil! be provided for review to the City. 1. Field Investigation: a. Obtain all necessary permits for the drilling and/or test pits. b. Complete one (1) test piton the south side of Ten Mile Creek. c. Complete sampling, togging, and classification of soils. 2. Analysis and Design Recommendation a. Review available geologic and geotechnical infon~nation in the area. b. Develop recommendations for aerial crossing foundation design and construction performance requirements. c. Prepare a draft summary letter report and submit three (3} copies to JUB and the City for review. d. Incorporate the review comments and publish four {4) copies of the final report. Task f - Aaencv Coordination end Permitting City afMerirlian -Ten Mile Creek SewerCrosstng Replacemetu Page - 4 J-U-B EIVGtMEERS, trx. Atracturtenr .~ ~ -1o-os-o1 t 1. l~irencv Coordination a~1 Permitting A. Drainage/Irrigation District Coordination and Permitting 1. Permitting with Nampa-Meridian Irrigation District will be required. J-U-B will meet with NMID after a preferred sewer trunk replacement method is selected by the City and prior to initiating preliminary design. J-U-B will coordinate and submit 9015 complete plans to the NMID for review prior to initiating the license agreement. 2. For the purpose of estimating this Scope of Service, it is assurrred that vne license agreement will be required for the trunk sewer crossing of Ten Mile Creek. JUB will prepare the necessary license agreement applications, legal descriptions and exhibits. It is also assumed no floodway infringement will be considered as this is an existing facility. B. UStOE 404 Coordination and Permitting 1. This task encompasses the design and permitting of aerial sewer crossing of Ten Mile Creek that is under the jurisdiction of the U.S. Army Corps of Engineers(USCOE) and requires 404 permitting. For the purpose of estimating fees in the Scope of Services, preparation of one (1) Nationwide 12, 4D4 permit is assumed to complete the crossings. Z. Complete a field visit with representatives from the USCOE to review project scope and waterways. The field meeting will deternrine if a joint 404 permitting is required. Coordinate with the U.S. Army Carps of Engineer for crossing requirements and construction methods for preparation of a Nationwide 12, 444 permit for utility crossing ar stream alterations. A wetland inventory study may be required at the crossings to define sensitive wetland areas and restoration requirements and will require an addendum to this Scope of Services. 3. A crossing plan; details, and specifications will be developed and 404 permit application wbmitted to the Corps of Engineers. C. IDEQ Submittal Packages A formal IDEQ submittal is not anticipated since this is a sewer replacement project. However, ff an IDEQ submittaE is required, J-U-B will perform the following tasks. 1. J-U-B shall coordinate, prepare, and wbmit final construction plans, specifications, and checklists for approval to the Idaho Department of Environmental (IDEQ). For the purpose of these Scope of Services, it is assumed that one (1) submittal package will be required. 2. Incorporate applicable IDEA review comments into the construction plans and specifications. Task F -Easement Coordination 1. ~0t Acouisition The existing trunk sewer lies within a platted 20-foot sanitary sewer easement as shown on the plat of Crest Wood Estates Subdivision No. 4 (Ada County Records Book 56, Page 5239). If additional temporary construction easement is needed, ar the City chooses an alternate sewer crossing alignment requiring acquisition of a new sanitary sewer easement, J-U-B will assist the City with permanent and temporary construction easement acquisition as follows. A. Easement IdentiflcaHon and Preliminary Exhibits 1. Reconfirm easements required from preliminary engineering task. City ofMeridian -Tao Mile Creek SewerCrassing Replacement Page - 5 .I-U-B ENGINEERS, inc. attachment 'a' - lass-Qf f 2. Prepare preliminary easement maps using available COMPASS aerial mapping, Ada County G.I.S. base mapping, and preliminary alignments. These preliminary easement maps will be used for initial property owner contact. 3. Research Ada County G.I.S. data base to determine parcel tax identification number, and assessed value. 8. Easement Legal Descriptions 1. Prepare legal descriptions and exhibit drawings necessary to secure additional temporary construction or new permanent easements. For the purpose of estimating fees, preparation of two (2) legal descriptions are assumed. C. Property Owner Meetings and Negotiations 1. Property Owner Meetings: Attend meetings with City staff and each affected property owner to review the preliminary alignment maps, discuss easement acquisition process, confirm specific issues and concerns, request access to survey. For the purpose of estimating fees, {2) properly owners are assumed. There will be one (1) meeting with each property owner. Interview notes will be prepared documenting each meeting. 2. Easement Negotiations: It is assumed City staff -will conduct easement negotiations with property owners. J-U-B will assist City staff with easement negotiations through incorporation of property owner and City provisions into the easement(s) and construction contract documents. 3. Prepare easement documents. Note that legal descriptions are provided under Task E.1.8. Ciry of Muidlaa -Tea Mile Creek Sewer Crossing Replactmenr Pagr - 6 J-U•B ENGINEERS, Int. Attachment 'C' - i0-Q8-Ot f CITY OF MERIDIAN TEN MILE CREEK SEWER CROSSING REPLACEMENT ATTACHMENT °C° -FEE SCHEDULE Basis of Fee and Billing Schedule The City shall pay J-U-B for its services and reimbursable expenses as follows. A detailed labor and equipment is presented in Exhibit "A-1 ": Task A -Project Meetings • Task A -Project Meetings Time and material basis with an estimated budget of ......................................... $695 Task B -Feasibility Analysis • Task B -Feasibility Analysis Lump sum price .................................................................................... $3,288 • Lts~rice' ................................................................................... $r46;i350 • T T ....................................... ~3;5?$ Task E -Agency Coordination and Permitting • Tasks E -Agency Ct~rdination and Permitting Time and material basis with an estimated budget of ....................................... $7.202 Task F -Easement Coordination • Task F -Easement Coordination Time and material basis with an estimated budget of ...................................... $2,08 ~ J3,270 Ciry of Meridian -Tdr Mlle Creek Sewer Crossing Replacemau p~+Se • I F~411$tT A-1 Pegs f of 2 CITY OF MERIDIAN -TEN MILE CREEK TRUNK SEWER CROSB1NCi LABOR AND EO111PMENT DETAIL Project Protect Structural 8uvay 2 - Ma~~ CaP;; TASK Marra FJ inset E 6tear EIT PLS Tech. Orates C1er~ca! Sur E: ~ SsbccmauNarft TOTAL ERI HO P ~ .84 $44.37 $42.14 $23.57 $41.27 $22.33 $!7.[~ $14.59 $IS.W a5fl.9li TASK A • PROJECT MEETINGS (T&1~ 1 1 ttseum 1 1 i 2 Owner 2 TOTAL TASK A t. 3.00 0.00 1.00 0.00 0.00 0.00 0. 0.00 0.00 5895 TASK 8 • FEASIBILITY ANALYSIS (LUMP SU f l~auola M) Evahaie R M Msthopa 1 4 2 E>r8htafa AAakrtate 1 2 I3reNtate Aderttate Tnnk Loaatbrl/ d 0.5 2 _ _ Letlre rt 2 8 2 1 TOTAL TA6K B 4. 14.00 2.00 0;00 0.00 4: 2.00 1.04 .00 .00 S .288 TASK C - PAELJMiNARY AND FINAL DESIGN 1 tltW T hto , aA SLUMP 6UM~ . Reaearotl IiNY std Montenetlle 1 2 EafaC48ir Hat 3 derlNfal Cotttrd 0.8 1.6 0.6 Ob Bet Cae~trrrAbn THM'efGontrd Poilrts 0.5 f 1.5 1S coos. w cxm ~. slm vas os T OS 1 OS 2 B 8 T 0.8 1 4 8de Volt b Fbtl Chexk T .. Add~brtal .1 0 OS 0 1S 7.5 S 8 8 0 Z Baelo b Plrtel a COFI>gr110tlOr1 PIMP Tank Samara 1 4 4 pest Ot-taie 1 2 4 8 1 4 24 Prepare 6096 Cbmpbis CtlretruaUat Plans and Corrheck Oearrrerde 2 4 4 1 Prepare TeghrlCfll 8pa~atlons Mtl Cagred OOCUmertte f 8 f _. 2 _ ..-_-- -' .. . Prepare 100% Complete Cenetrudtm Plero and CI1fHIH01 DOa811B1U8 1 2 4 _ 4 2 of PiGbabte Cortatrtaf0at Coot 025 2 1 - _ Prepare F-fal Casple0e Plare std Cdrtheol Datrtmerrta ZO gate 2 2 9 Co l~isw end QAKiC Revlsrr 425 6 36 0 0 sS0 0 Revlew at6o96 a __ .. AL 0 0 0 0 0 0 7 ALT ..K C 6:25 19:50 8:00 d0:S4 2 7.60 54 B.50 8.00 8.00 SO 16.8$0 TASK D -TRUNK SEWER ADDITIONAL SERViCfiS R~ 1 Oaortee1dt14e1 In:,walEp~tbn and Anti~ets , St'a[ne lowtlnt Cieotadlhcal atbn flrrd boats 1 53,600 OT TASK D 0:00 0:00 ~0: 1. 0.00 .00 0.00 0.~ 0.00 0.00 S3 "a00 57 EXHIBIT A-1 Page 2 of 2 CITY OF MERIDIAN -TEN MILE CREEK TRUNK SEWL+R CROSSINti LABOR AND EQUIPMENT DETAIL Pr~3Ct Project 9tntCttral Survey 2 • Man f v TASK E meer e~eer EIT pL5 Teen, Draft Clencat E uy. S:&cm'<uttant TOTAL EmpbyeeWotrWPayt~ 5`•x.84 $44.37 $42.74 $23.57 $at27 $22.34 Et7.00 $14.5D 5.00 AC1 TASK E -AGENCY COOROINATKjI+I AND PERMi1TING 1 WYrfct Coor~nalbn and (T&M) sire & ~ a 2 tmre ett~ t 88stmet'!), CeOird<tl8tldi 1 4 2 4 4 1 e. 1 0 2 a a ~ o ,tt?3 2 u8t~e 404 Coor~mtbn 6 Ppmtittl Eta 1 1 Atldmanal Fteq T 1 1 4 4 Pre Etddbfte. Plan, Seclicre. Data4e t 4 8 USCOE and iDWR Perm 1 2 D.6 IDL and EtthNBs t 1 2 2 0.5 AL 0 4 3 10 1 0 4 T . S IDEA SUBIW7TAL PACKAti6 !(600m - - ~ _ Trttnk 88WBt 1 2 In~rpot~e Ttta4c Senor erde 1 2 2 2 0 8 0 6 s0 8 OTAL TAS E 2.40 18 0.00 .04 10.00 14.00 30.08 a.00 B.OD 8.00 S4 57,202 TASK F - EASfMERT COORDINATION (TB~Mj 1 Eesaotard tdenttftatton aM Pr~knl Etddblta E¢eerneat idenD9lcatlOn 1 1 Preim Easement - - _ 2 _ -- .- _ -. Reseatelt 7 _ 8331 Z Easatlront Daarl tstn al D ertd Etdttbf~ 0 2 4 1.5 5888 9 OMMI Nhat attd arts Oam~ owttera, 4 Easemetd 2 2 2 ~ O AL K F 4,00 1.2b 0. 8: 4. 4.00 3. O.OD .00 0.00 S2,085