HomeMy WebLinkAboutTask Order No. 0732 with Hydro Logic, Inc. for Municipal Water Supply Well Rehabilitation and TestingTASK ORDER N0.0732
CITY OF MERIDIAN (OWNERf
AND
HYDRO LAIC, INC. (HYDROGEOLOGIST)
This Task Order is issued by Owner and accepted by the Hydrgist pursuant to
the mutual promises, covenants and conditions contained in the Agreement between
the above narrred panes dated February 18, 2008.
CITY OF MERIDIAN
MUNICIPAL WATER SUPPLY WELL REHABILITATION AND TESTING
PURP03E
The Hydre>geologist's scope of services, time of completion and compensation shad be
as set forth herein. Servit~s shah genera~y be described as Engineering Consu{ting
~rvioes per the Consul~nt's pro~sal dated February 14.2008.
TASK 1.1-CITY WATER WELL X14 REHABILITATION AND TESTING
Per the City's request, Hydrogeologist will evaluate, design, and inspect reconstructive
maintenance on City muniit~pai water supply Well #'14. The reconstructive design,
oversight, and documentation would include work tasks such as re-developmern of u~il
scxeen completion intervals, installation of plugs and/or liners amide well casings,
perforation arxl/or pressure routing of tine unsealed surface casirxt, welt developmerrt,
pump#esting and water quality sampling. and recommendations for stainable yield.
in addition to r~utatory submit~ls, individual task completion reports will be devek>pecl
as needed and/or requested by the City.
The Owner will provide all availat~e information r>evessary to conduct the rehabilitation.
Hydrogeologist will perform down hole video surveys, design the ruction, inspect
the work, obtain regulatory permit, review and approve the c~rrtractor's voices,
sohedufe and conduct pump testing, serve as the liaison between the drilling corrtractor
and the City to obtain cost estimates from contractors oral to develop c~ractual
agreenrerrts and technical sperific~tiorw for the work. Hydrogeologist wpl dev®lop any
necessary change onus to the work and keep the City regularly updated with respect to
the work. Hydrogeologist will also serve as inspector for th City/ with respect to the
work including review of contractor invoices and developing as-bunk re~rd drawings.
Hydrogeologist wdl follow through with regulatory agenc~s to cl~ure and wilt work
closely with the City's Public Wortcs Departinerot.
nI~E ol` coIwIIPI.ETION
Hydrogeologic services wiq be competed on an as needed basis and 6me of completion
wil! be set as services ar+e requested.
C011PENSATION
The Not To-Exca3ed amount for this Task Omer No. 0732 ~ finrentyfiv+e thousand dollars
{$25.000.00). The hourly note for services and direct expera3es is attached {Prevailing
Fee Schedule Effective January 1, 2008) and by this reference made a part her~f.
CITY OF MERIDIAN
BY: ~
TAMMY de ~ RD, MAYOR
Attest:
HYDROGEOLOGi3T
~~ `
ED SQUIRES HYDRO LOGIC, INC.
~ ~ ~ ... /.
,~,.L
CI~1( RK ~S' _
.~
O ~'
100? ~l'. Franklin Street Boise.lD 8370? i208~ 3-13-8369, (~) 34?-3100. h}~drologic.a mtest.net
Ed Squires
Mark Uttittg
Loren Pearson
Kurt Newbry
Jannette Young
Clerical office staff
H~~dro Loeic, Inc. Rste Schedule 20~
Managing Hydrogeologist
Project Hydrogeologist
Geophysicist/Projea Manager
Hydrog~iogist
Geologist
Direciiy auoc~bie
$120/hour*
$105/hour
$ 95/hour
$ 85/iwur
$75/hour
$ 45lhour
Mileage billed at $ 0.44/mile
I3own hole camera survey base charge = $ 850
Minimum geophysical logging charge ° $1,500
Mobile geophysics unit standby time = $ 200/hour
* Ed Squires = Expert witness in legal proceedings = $175/hr.
Billing rates for Hydro Logic, Inc. will remain fixed for 2008
C.... /d•r.wc-~.1 Febntarv 14, 201
~ .