Loading...
Memo from PlanningRequested Changes to the Agenda: .~', .~ Item 8. Project: Education Campus Final Plat -Continue to January 27, 2009 ~~ ~ ~, J,q ' .~' Item 9. Project: Sommersby Final Plat ~ ~ ~ 3~~ . Location: Northwest corner of W. Pine Avenue and W. Franklin Rd. ~~ ~ ~'~ ~ ,~~'' c~ Applications: Final Plat Approval for four (4) lots. Highlights of Proposed Development: The City Council approved the preliminary plat for Sommersby Subdivision in January, 2005. The final plat for Sommersby Subdivision No.2 (FP- 06-024) was approved by Council in June, 2006. The entire preliminary plat consists of sixty-two (62) buildable lots and six (6) common/other lots on 12.73 acres in an existing L-O and R-15 zones. The proposed phase includes 4multi-family lots to be developed with an 8-plex unit on each lot. Elevations: No Staff Recommendation: Approval Written Testimony since Staff Report: E-mail from applicant in agreement with the recommended conditions of approval in the staff report Outstanding Issue(s) for City Council: None Notes: 1/13/2009 Item 11. Fairview Lakes Retail Location: 950 E. Fairview Avenue Applications: Development Agreement Modification History: The applicant, Doug Tamura applied for and received approval for a Conditional Use Permit Modification. Aggrieved by the Commission's decision he sought Council review of the decision. The request was heard by the City Council on January 6' 2009. After taking testimony, the Council continued the hearing to give the applicant time to address their concerns regarding the appearance of the rear wall of the building and submit a proposal for staff review and recommendation. The applicant submitted a proposal which was forwarded to Council packet. Based on review of the proposal staff recommends the following: • Paint a one or two color band that matches the bottom of the facade projecting over the arcade on the south and west elevations should be added along the upper portion of the remaining west elevation and along the length of the north elevation. This would be in addition to Mr. Tamura's proposal of the painted doors and wainscot on the north and west elevations to break up the lower portion of the facades. • Plant two additional trees, the same species as the existing trees, within the street buffer along Carol Street in the locations shown on the • Construct 4 foot tree wells and install and maintain bark mulch around the trees for protection. • Plant blooming flowers like Floribunda roses or other blooming plants at the base of 3 of the retainer walls to enhance the look of the landscape. Elevations: Yes Written testimony: Applicant's proposal. Outstanding Issue(s) for City Council: 1. Do the recommended landscaping improvements and proposed paint scheme address the concerns regarding the rear wall of the building. 2. The trash enclosure that was constructed in the parking lot (off site) and the one proposed in the rear property buffer do not comply with the UDC. 3. There are additional phases planned for this site which approved for building with stucco finish. Is that still appropriate and should the applicant comply with the plans and materials approved through a previous CUP modification? 1/13/2009 Item 13. Silverstone Corporate Plaza Location: Silverstone Corporate Plaza Condominiums is located south of E. Overland Rd. and east of S. Eagle Road at 3421 E. Overland Rd. Applications: Short plat approval to create 37 condominium units within a 116,000 square foot building on 6.2 acres in a C-C zoning district. History: A Certificate of Zoning Compliance was issued for the building on July 18, 2008. Highlights of Proposed Development: The subject building is a principally permitted use in the a C-C zone district. The proposed short plat would create 37 individual condominium units with the shell of the building. Elevations: No Written testimony: None The applicant has communicated their concurrence with the staff report and conditions. Outstanding Issue(s) for City Council: None 1/13/2009