HomeMy WebLinkAboutGemtone Center 5 FP Ord ApprvlBEFORE THE MERIDIAN CITY COUNCIL
C/C 05/27/03
IN THE MATTER OF THE
APPLICATION OF GEMTONE,
INC. FOR APPROVAL OF FINAL
PLAT FOR GEMTONE CENTER
NO. S, LOCATED WEST OF
NORTH EAGLE ROAD AND
SOUTH OF EAST FAIRVIEW
AVENUE, MERIDIAN, IDAHO
CASE NO. FP-03-027
ORDER OF CONDITIONAL
APPROVAL OF FINAL PLAT
This matter coming before the City Council for Final Plat approval pursuant to
Meridian City Code § 12-3-7 on May 27, 2003, and the Council finding that the Administrative
Review is complete which has included certain comments as stated in a letter to the Mayor and
Council from David McKinnon Planner II for the Planning and Zoning Department, and Bruce
Freckleton, Engineering Technician III, and that Brad Hawkins-Clazk Planner III for the Planning
and Zoning Department, commented at the hearing, and the Council having considered the
requirements of the preliminary plat the Council takes the following action:
IT IS HEREBY ORDERED THAT:
The Final Plat of "GEMTONE CENTER NO. 5" as evidenced in Plat beazing:
"PLAT OF GEMTONE CENTER NO. 5, A SUBDIVISION, A PORTION OF THE EAST %2,
SECTION 8, T.3N., R.lE., B.M., MERIDIAN, ADA COUNTY, IDAHO 2003, SHEET 1 OF 2,
ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT
FOR GEMTONE CENTER NO. 5 / (FP-03-027)
Page 1 of 5
30311PLT. MEM 04/21/03, HANDWRITTEN DATE: 4/22/03, STAMPED DATE: APR 22
2003, GEMTONE, INC. -DEVELOPER, BRIGGS ENGINEERING, INC. -CONSULTING
ENGINEERS", Gemtone, Inc., Developer, is Conditionally Approved subject to those conditions
of Staff comments as set forth in the Memorandum to the Mayor and City Council from Bruce
Freckleton, Engineering Technician III, and Dauid McKinnon Planner II for the Planning and
Zoning Department, dated: Hearing Date: May 27, 2003, RECEIVED MAY 22, 2003 CITY OF
MERIDIAN CITY CLERK.OFFICE, listing 20 Conditions Of Approval, a true and correct copy
of which is attached hereto marked Exhibit "A", and consisting of three pages, and by this
reference incorporated herein, and the response letter of approval to conditions from Becky
McKay of Engineering Solutions dated May 27, 2003, a true and correct copy of which is
attached hereto mazked Exhibit "B", and consisting of one page, and by this reference
incorporated herein, and the additional requirements from the action of the Council taken at their
May 27, 2003 meeting as follows, to-wit:
1.1 Comply with the Meridian Fire Department's requirements as
follows:
1. That afire-flow as required by the Uniform Fire Code is provided
to service the entire project. Fire hydrants shall be placed an
average of 350' apart. 1997 UFC Appendix III-A
2. All roads shall have a fuming radius of 28' inside and 48' outside.
Operational fire hydrants and temporary or permanent street signs
are required before combustible construction begins. UFC 901.4.2
& 901.3
4. Acceptance of the water supply for fire protection will be
by the Meridian Water Department.
ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT
FOR GEMTONE CENTER NO. 5 / (FP-03-027)
Page 2 of 5
Final approval of the fire hydrant locations shall be by the
Meridian Fire Department.
6. The phasing plan may require that any roadway greater than
150' in length that is not provided with an outlet shall be
required to have a turn around.
Insure that all yet undeveloped parcels are maintained free
of combustible vegetation per section 1103.2.4 of the UFC
8. All building uses and processes to comply with the fire
code in effect at the time of construction.
9. Vertical clearance for driveways shall be 13'6", this may
affect tree placement in landscaping areas.
10. The driveway shall have a clear driving surface which is
20' wide available at all times.
11. The turnaround on the North end of N. Machine Ave. is
approved as shown.
1.2 The Central District Health Department requires after written
approval from the appropriate entities are submitted, they can
approve this proposal for central sewage and central water; that
plans must be submitted to and approved by the Idaho Department
of Health and Welfare, Division of Environmental Quality for
central sewage and central water; that run-off is not to create a
mosquito breeding problem; and it is suggested that stormwater be
pretreated through a grassy Swale prior to discharge to the
subsurface to prevent impact to groundwater and surface water
quality; that engineers and architects should obtain current best
management practices for stormwater disposal and design a
stormwater management system that is preventing groundwater and
surface water degradation. Manuals for guidance:
State of Idaho Catalog Of Stormwater Best Management
Practices For Idaho Cities And Counties. Prepared by the Idaho
Division Of Environmental Quality, July 1997.
2. Stormwater Best Management Practices Guidebook. Prepared
by City of Boise Public Works Department, May 2000.
ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT
FOR GEMTONE CENTER NO. 5 / (FP-03-027)
Page 3 of 5
1.3 Comply with Settlers' Irrigation District as follows:
That all irrigation drainage facilities along with their
easements be protected and continue to function. The
lateral involved is the Highline Lateral #48.
2. A license agreement will need to be signed and recorded
prior to construction of any S.LD. facilities.
Any changes to the existing irrigation system such as
relocation, tiling, and landscaping must be approved by
Settlers Irrigation District.
4. All storm drainage must be retained on site.
5. The development must supply irrigation access to all lots
within the subdivision. IF the developer wishes to have
Settlers In•igation District own, operate, and maintain the
pressure irrigation system, an addendum to the existing
Gemtone agreement needs to be in place prior to the pre-
constructionmeeting.
1.4 Comply with Nampa & Meridian Irrigation District as follows:
Nampa & Meridian Irrigation District requires a Land Use
Change Application be filed before the District can reply on
the Final Plat.
2. Snyder Lateral courses through the northwest corner of the
proposed project. The recorded easement for the Snyder is
forty feet, twenty feet on each side.
All storm drainage must be retained on site. All latrals and
wasteways must be protected. The developer must comply
with Idaho Code 31-3805.
2. The fmal plat upon which there is contained the Certification and signature of the
City Clerk and the City Engineer verifying that the plat meets the City's requirements shall be
signed only at such time as:
ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT
FOR GEMTONE CENTER NO. 5 / (FP-03-027)
Page 4 of 5
1. The Plat dimensions are approved by the City Engineer; and
2. The City Engineer has verified that all off-site improvements are
completed and/or the appropriate letter of credit or cash has been issued
guaranteeing the completion of off-site and required on-site
improvements.
By action of the City Council at its regular meeting held on the 2 Z { k day of
~ , 2003.
By: ~a ~.
ROBERT D. CORRIE
\`~,,,u n n„ ;;,, Mayor, City of Meridian
Attest: \,.~d~.l O~ E'"Rl(?~q %~~~~
G ~~°o~o~A rFO ~ ~-
- - S~.r~L
__
illiam G. Berg, Jr., Ci C erk =,f ,9 9~~sr ist h~o ~p
s, ~,9 _,, O~ ~~•
'z~,~_~C'G~rs,~ -Y , ,~~~
Copy served upon Applicant, the Planning and Zoning Department, Public Works Department,
and City Attorney.
,~rnrruulgi
gy; ~ ~ Dated:
City Clerk
d-~ 03
Z:1Work1MlMeridianlMeridien 15360MKiemtone Center No. 5 FP 03 027`,OrderFP.doc
` ~,.~y QF r'.ER~~~9o,,~~
= Si ~L
~,
- o
.~
ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT
FOR GEMTONE CENTER NO. S / (FP-03-027)
Page 5 of 5
MAYOR
Robert D. Came
CITY COUNCIL MEMBERS
Tammy deWeerd
Keith Bird
Cherie McCandless
William L.M. Nary
HUB OFTREASURE VALLEY
A Good Place to Live
CITY OF MERIDIAN
33 EAST IDAHO
MERIDIAN, IDAHO 83642
(208) 888-4433 ~ FAX (208) 887A813
City Clerk Office Fax (208) 858-4218
STAFF REPORT:
To: Mayor & City Council
From: David McKinnon, Planner II
Bruce Freckleton, Assistant to City Engineer
Re: GEMTONE CENTER NO. S
~t.~
~9AY 2 2 2003
City Of Meridian
City Clerk Office
• Request for Final Plat Approval of Gemtone Center No. 5, Consisting of Seven (7)
Commercial Building Lots and Two (2) Other Lot on 12.08 Acres in an I-L Zone by
Gemtone Inc. (File No. FP-03-027).
We have reviewed this submittal and offer the following comments, as conditions of the
applicant. These conditions shall be considered in full, unless expressly modified or deleted by
motion of the Meridian City Council:
APPLICATION SUMMARY AND LOCATION
The applicant, Gemtone, Inc., has requested approval of the fmal plat for Gemtone Center No. 5,
consisting of 7 commercial building lots and 2 "other" lots located approximately %: mile west of Eagle
Road on the north and south side of Pine Street. Staff reviewed the submitted final plat and has found
that it is in substantial compliance with the approved Preliminary Plat (File No. PP-02-28).
Staff finds that the proposed subdivision complies with the City's Subdivision Ordinance and offers
the following conditions of approval:
CONDITIONS OF APPROVAL
1. All irrigation ditches, laterals or canals, exclusive of natural waterways, intersecting, crossing
or lying adjacent and contiguous to the azea being subdivided shall be tiled per City Ordinance
12-4-13. Plans will need to be approved by the appropriate irrigation/drainage jurisdiction, or
lateral users association, with written confirmation of said approval submitted to the Public
Works Department.
2. Compaction test results must be submitted to the Meridian Building Department for all building
lots receiving engineered backfill.
3. The d esign o f d rainage areas s hall a nsure t hat water i s r etained o my d uring 100-year s torm
events for a period of time not to exceed 24 hours.
LEGAL llEPAR"FMENT
(20814ti6-9271 Fax 466=1101
PUBLIC WORKti
BUILDING DEPARTMENT
(208) 896-5500 ~ Fax 887-1297
PLANNING AND ZONING
DEPARTMENT
(208) 884-5533 ~ FAX 888-6854
Hearing Date: May 27, 2003
FP-03-027 /~_ ~ i L;~ IIQM ~t~No S.FP.doc
Mayor and Council
Transmittal Date: May 22; 2003
Page 2
4. Street signs are to be in place, water system shall be approved and activated, pressurized
imgation system approved and activated and road base acceptable for fire and emergency
vehicles prior to applying for additional building permits. A letter of credit or cash surety in the
amount of 110% will be required for all, landscaping, pressurized irrigation, sanitary sewer,
water, etc., prior to signature on the final plat. Staff is granted the authority to make lot-by-]ot
determinations regarding the timing of landscaping installation.
All landscaping shall be installed as depicted on the submitted landscape plans, sheet LS-],
prepared by Harvest Designs on 4-21-03.
6. Machine Avenue shall be constructed to a fu1140' street section, with curb gutter and five foot
(5') concrete sidewalk.
Sanitary sewer and water service to this site shall be from new and existing mains.
8. Applicant's engineer will be required to submit a signed, stamped statement certifying that all
street finish centerline elevations are set a minimum of three-feet above the highest established
normal groundwater elevation.
Applicant has indicated that the pressurized irrigation system within this development is to be
owned and maintained by the Settlers irrigation District. Underground year-round pressurized
imgation must be provided to all lots within this development. The City of Meridian requires
that pressurized irrigation systems be supplied by a yeaz-round source of water. If a well or
surface source is not available, asingle-point connection to the City of Meridian's domestic
water system will be allowed for the development. hi the event that domestic water is used as a
backup source, common azeas within the development will be subject to City of Meridian water
assessments. Payment of water assessment fees for the common areas is required prior to city
signatures on the final plat map.
10. A drainage plan designed by a State of Idaho licensed architect or engineer is required and shall
be submitted to the City Engineer (Ord. 557, 10-1-91) for all off-street parking areas. Storm
water treatment and disposal must be designed in accordance with the Department of
Environmental Quality 1997 publication, "Catalog of Storm Water Best Management Practices
for Idaho Cities and Counties" and City of Meridian standards and policies. Off-site disposal
into surface water is prohibited unless the jurisdiction which has authority over the receiving
stream provides written authorization prior to development plan approval. The Applicant is
responsible for filing all necessary applications with the Idaho Department of Water Resources
regarding Shallow Injection Wells on the final plat.
11. Any existing domestic wells and/or septic systems within this project will have to be removed
from their domestic service per City Ordinance Section 9-1-4 and 9-4-8. Wells may be used
for non-domestic purposes such as landscape irrigation.
12. Two-hundred-fifty watt, high-pressure sodium streetlights will be required at locations
designated by the Public Works Department. All streetlights shall be installed at subdivider's
expense. Typical locations are at street intersections and/or fire hydrants. Final design
FP-03-027 ~~; ~~l ~~ n y ~~~~ne No 5 FP.Doc
Mayor and Council
Transmittal Date: May 22, 2003
Page 3
locations and quantity are determined after power designs are completed by Idaho Power
Company. The street light contractor shall obtain an approved design and permit from the
Public Works Department prior to commencing installations.
13. Coordinate fire hydrant placement with the City of Meridian's Water Works Superintendent.
14. Please identify and show dimension ties for the easement shown across the south end of Lot 5
and 6, Block 5.
15. Complete the recording information for the two temporary tum-azound easements shown.
16. The "Real Point of Beginning" symbol, as shown in the plat legend, doesn't correlate with the
point as described in the legal description of the Certificate of Owner. Please label as "Real
Point of Beginning."
17. The direction (right) of curve C-3 in the legal description of the Certificate of Owners appears
to be in error.
18. Provide sidewalks in accordance with City Ordinance Section 12-13-10-8.
19. Applicant shall be required to pay Public Works development plan review, and construction
inspection fees, as determined during the plan review process, prior to signature on the final
plat per Resolution 02-374.
20. Staff s failure to cite specific ordinance provisions or terms of the approved Preliminary Plat
does not relieve applicant of responsibility for compliance.
RECOMMENDATION
Staff recommends approval of this Final Plat application with the aforementioned comments and
conditions.
~x~~h,f "~I" 303
FP-03-027 Gemtone Na 5 FP.Doc
2089380941
p.l
~NGINEER/NG
SOLUTIONS~~
L1P
May 27, 2003
Mayor and City Council
City of Meridian
33 East Idaho
Meridian, ID 83642
Re: Gemtone Center No. 5 (Final Plat)
FP-03-27
Dear Mayor and Council:
I50 East gikens SUp:L Suitc a
Phnnc: ~( 018) 938.0980
Far: (208) 938-0941
MAY 172003
City ~ rkeCl~ce
We have reviewed the sta{I'comments dated May 27, 2003, and concur with alt
conditions of approval (Conditions 1-20).
Sincerely,
ENGINEERING SOLUTIONS, ld,P
~C ~~~~~
Becky Mc U//
Partner
BM:ss
cc: E. L. $ews
T1lomas T. Writ
~xl~~b~l "!3" 10~ !
MRY 27 '03 11:42
~GIRGZanonn