HomeMy WebLinkAboutStandard Form of Agreement with Architectural Building Supply for New Meridian City Hall~. -~ Document A101/Cl~a" -1992 Standard Form of Agreement Between Owner and Contractor where the basis of payme-rt is a STIPULATED SUM AGREEMENT made as of the 1 '~ day of ~uLY ~ the yam' of 2 L10 ~ (In words, indicate day, month and Year) BETWEEN the Owner. (Name and address) CITY OF MERIDIAN 33 East Idaho Avenue Meridian, Idaho 83642-2300 and the Contractor. (Name and address) Architectural Building Supply 960 E. Franklin Road Meridian, Idaho 83642 For the following Project: (Include detailed description of Project, location, address and scope.) New Meridian City Hall 33 East Broadway Avenue Meridian, Idaho 83642 I An approximately 100,000 square foot, multi-story city hall office building with a basement. The Construction Manager is: (Name and address) PETRA INCORPORATED 1097 N. Rosario Stmt Meridian, Idaho 83646 The Architect is: (Name and address) LCA ARCHITECTS, P.A. 1221 Shoreline La>~ Bois, Idaho 83702 The Owner and Contractor agree as set forth below. ADDPtIONS AND DELETIONS: The autitor of the doaurterlt has aged information needed for its ocmpletiort. The author may also have revised the text of the origami AIA standard form. An Additlarts a-~ De/stforrs Report that rrotes added information as wep as revisions to the standard form text La avaUable from the author and should be reviewed. A veitkal tine in the left margin of Thy dotxur-erlt indicates where the author has added necessary information and where the author has added to or Meted from the ori~al AIA text. ThLa document has important Iega1 consequerrt~s. CortsuNation wiHr an atbmey is ~otaaged witll rasped to its cxunpletlon or modif~iorl. The t 992 Edit~n of AIA f)ocummrt A201/GMa,Gerteral Cortiltions of the Contrail for Construction, Corrstruilion Manager-Adviser Edition, ~ adopted in this documenrt by reference. l>o rrot use with ogler general t~ru8tiorls unless this ~aanertt is modified. AIA art A101/CMa° -1982. CopyriglR ®18!!2 by The American InsUdrte of Architeda. AU right reserved. WARNING: This AIA® Document is ~~ protected by US. Copyright Law and international Treaties Unauthorized reproduction or distribution of this AIA® Document, or any portion of IG ~ may result in severe civil and criminal perreltles, and will be prosecuted to the maximum extent possible under ttre law. This docisnerrt was produced / by AIA software at 08:48:18 on 08!15/2007 under Order No.1000295111_t which expires ono/4/2008, and fs rrot for resale. (3159378344) Ussr Notes: ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement; these form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agree>~nts, either written or oral. An enumeration of the Contract Documents, other than Modifications, appears in Article 9. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall execute the entire Work described in the Contract Documents, except to the extent specifically indicated in the Contract Documents to be the responsibility of others, or as follows: ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL.COMPLETION § 3.1 The date of commencement is the date from which the Contract Time of Section 3.2 is measured, and shall be the date of this Agreement, as first written above, unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. (Paragraphs deleted) October 1, 2007 § 3.2 The Contractor shall achieve Substantial Completion of the entire Work not later than )days after the Date of Commencement. (Insert the calendar date or number of calendar days after the date of commencement. Also insert any requirements for earlier Substantial Completion of certain portions of the World if not stated elsewhere in the Contract Documents.) Portion of Work Substantial Completion date Provide all doors, frames, and hardware as noted on July 1, 2008 the drawings and per the following: Division I -General Requirements Section 08110 -Standard Steel Doors and Frames Section 08211-Flush Wood Doors Section 08311- Access Doors and Frames Section 08711- Fmish Hardware This bid package specifically includes: • Furnish and install all metal and wood doors along with the associated hardware. • Funush and install the hollow metal frames F.O.B. jobsite. • Supply all hardware for exterior hollow metal doors per bid documents, to be installed by others (Phase II-Shell & Core Bid Package 6). This bid package specifically excludes: • Aluminum window units. • Glass and glazing for all doors and window units. subject to adjustments of this Contract Time as provided in the Contract Documents, (Insert provisions, if any, for liquidated damages relating to failure to complete on time. ) tnlf. AIA DOggnBrlt A101lCItia~ -1992. Copyright ®1892 by The American Inatftute of Architects, Ali rights reserved, WARNING: This AIA® Document is protected by U.S. CopyNght Law and International Treaties, Unauthorbed reproduction or distribution Of this AIA® Document, or any portlon of it, may restrit in severe civil and aiminal penalties, and will be prosecuted to the maximum extent possible under the law. T1ds document wag produced / la ~ Notes: et 08:48:18 On 08/15/2007 under Order No.1000295111_1 which expires on 4/412008, and is not for resale. (3159378344) The Contractor acknowledges and agrees that the Owner will suffer financial loss in an amount that is difficult to quantify if the Work is not substantially complete on the date set forth in the Contract Docuuments. The Owner shall have the option to assess liquidated damages against the Contractor (and its surety, if any) in an amount of Five Hundred & NO/100 Dollars ($500.00) per calendar day, for each calendar day of delay until the Work is ;substantially complete. The Contractor acknowledges and agrees that the amounts set forth above are a reasonable estimate of the damages that will likely be incurred by Owner in the event the Work is not substantially complete by the date set forth in the Contract Documents, and not a penalty. If responsibility for a delay in substantial completion shared by the Contractor and others, Owner may reasonably apportion the damages between such responsible parties. The right to assess liquidated damages is in ~lition to, and not in limitation of, any right or remedy available to the Owner or to protect the Owner to address delay by the Contractor, whether such right or remedy is under law, in equity or under Contract Documents. ARTICLE 4 CONTRACT SUM § 4.1 The Owner shall pay the Contractor in current funds for the Contractor's p~lorman NO/100C($ 277t230.Ot?), Contract Sum of Two Hundred Seventy Seven Thousand Two Hundred Thirty subject to additions and deductions as provided in the Contract Documents. § 4.2 The Contract Sum is based upon the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner. (State the numbers or other ideredfication of accepted alternates. If decisions on other alternates are to be made by the Owner subsequent to the execution of this Agreement, attach a schedule of such other alternates showing the amount for each and the date until which that amount is valid) § 4.3 Unit prices, if any, are as follows: Description Units Price (S 0.00) ARTICLE 5 PR~RESS PAYMENTS § 5.1 Based upon Applications for Payment submitted by the Contractor to the Construction Manager, and upon Project Applications and Certificates for Payment issued by the Construction Manager and Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents. § 5.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as follows: § 5.3 Provided an Application for Payment is submitted to the Construction Mana~er not later than the 25th day of a month, the Owner shall make payment to the Contractor not later than the 20 day of the following month. If an Application for Payment is received by the Construction Manager after the application date fixed above, payment shall be made by the Owner not later than Thirty (30) days after the Construction Manager receives the Application for Payment. § 5.4 Each Application for Payment shall be based upon the Schedule of Values submitted by the Contractor in accordance with the Contract Documents. The Schedule of Values shall allocate the entire Contract Sum among tbe various portions of the Work and be prepared in such form and supported by such data to substantiate its accuracy as the Construction Manager or Architect may require. This schedule, unless obj~ted to by the Construction Manager or Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment. § 5.5 Applications for Payment shall indicate the percentage of completion of each portion of the Work as of tbe end of the period coveted by the Application for Payment. AIA Doganent A101/dliaTM -1952. Copyright ®1892 by Tire American I~ihde of Architects. AU rights reserved. ®ARNIN~: This AIA® Document is (Iris. protected by U.S. Copyright taw and Intemadorrel Treaties. Unauthorized reproduction or dlstributlon of this AIA Document, or eny portion of it, 3 may result in severe civil and criminal perreltlea, and wUt be prosecuted to the maximum extern possible under the lew. This document vase prodtxred I by AIA software at 08:48.18 on 08!15/2007 under Order PIo.1000295111 1 which expires on 4/4l20~, atui is not for resale. (3159:176344) l)ser I~loiea: § 5.8 Subject to the provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: § 5.8.1 Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the total Contract Sum allocated to that portion of the Work in the Schedule of Values, less retainage of Five Percent ( 5% ). Pending final determination of cost to the Owner of changes in the Work, amounts not in dispute may be included as provided in Section 7.3.7 of the General Conditions; § 5.6.2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed cotlstrnction (or, if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing), less retainage of ( ); § 5.8.3 Subtract the aggregate of previous payments made by the Owner, and § 5.6.4 Subtract amounts, if any, for which the Construction Manager or Architect has withheld or nullified a Certificate for Payment as provided in Section 9.5 of the General Conditions. § 5.7 The progress payment amount determined in accordance with Section 5.6 shall be further modified under the following circumstances; § 5.7.1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to ( ' of the Contract Sum, less such amounts as the Construction Mauager recommends and the Architect determines for incomplete Work and unsettled claims; and § 5.7.2 Add, if final completion of the Work is thereafter materially delayed through no fault of the Contractor, any additional amounts payable in accordance with Section 9.10.3 of the General Conditions. § 5.8 Reduction or limitation of retainage, if any, shall be as follows: (If it is intended prior to Substantial Completion of the entire Wor1~ to reduce or limit the retainage resulting from the percentages inserted in Sections 5.6.1 and 5.6.2 above, and this is not explained elsewhere in the Contract Documents, insert here provisions for such reduction or limitation.) ARTICLE 8 FINAL PAYMENT Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when (1) the Contract has been fully performed by the Contractor except for the Contractor's responsibility to correct nonconforming Work as provided in Section 12.2.2 of the General Conditions and to satisfy other requirements, if any, which necessarily survive final payment; and (2) a final Project Certificate for Payment has been issued by the Construction Manager and Architect; such final payment shall be made by the Owner not more than 30 days after the issuance of the final Project Certificate for Payment, or as follows: ARTICLE 7 MISCELLANEOUS PROVISIONS § 7.1 Where reference is made in this Agreement to a provision of the General Conditions or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. § 7.2 Payments due and unpaid under the Contract shall beaz interest from the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. (Insert rate of interest agreed upon, if any.) ( )per annum Init. AIA t A101/CfAarr -1992. Copyright ®1992 by The American instttute of Architect. Ali rights re.9erved. WARNING: This AIA® Document is protected by US. Copyright Law end 1 ~ ltles ant! w~ili be prosecuted to the maxbnum ~~butlon of this AW® Document, or any portion of it, 4 may result In severe civil and criminal possible under the law. This docurnerrt eras produced / by AIA software at 08:48:18 on 08/15/ZW7 under Order No.tOlHP295111 1 which expires on 4/4/2008, and is rat for rule. User Notes: (315~i78344) (Usury laws and requirements under the Federal Truth in Lending Act, similar state and local consumer credit laws and other regulations at the Owner's and Contractor's principal places of business, the location of the Project and elsewhere may affect the validity of this provision. Legal advice should be obtained with respect to deletions or modifications, and also regarding requirements such as written disclosures or waivers.) § 7.3 Temporary facilities and services: (Here insert temporary facilities and services which are different from or in addition to those included elsewhere in the Contract Documents ) § 7.4 Other Provisions: (Here list any special provisions affecting the Contract.) ARTICLE 8 TERMINATION OR SUSPENSION § 8.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of the General Conditions. § 8.2 The Work maybe suspended by the Owner as provided in Article 14 of the General Conditions. ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS § 8.1 The Contract Documents, except for Modifications issued after execution of this Ageee~nt, are enumerated as follows: § 8.1.1 The Agreement is this executed Standard Form of Agreement Between Owner and Contractor, AIA Document A101/CMa, 1992 Construction Manager-Adviser Edition. § 8.1.2 The General Conditions are the General Conditions of the Contract for Construction, AIA Document A201/CMa, 1992 Construction Manager-Adviser Edition. § 8.1.3 The Supplementary and other Conditions of the Contract are those contained in the Project Manual dated , and are as follows: Document Title p~~ I Volume 2 Phase III Bidding/General 218 Conditions § 8.1.4 The Specifications are those contained in the Project Manual dated as in Section 9.1.3, and are as follows: (Either list the Specifications here or refer to an exhibit attached to this Agreement.) Title of Specifications exhibit: Volume I - Technical Specifications 904 pages (Table deleted) § 8.1.5 The Drawings are as follows, and are dated unless a different date is shown below: (Either list the Drawings here or refer to an exhibit attached to this Agreement.) Title of Drawings exhibit: ARCHITECTURAL O.OT Cover Sheet AO.OT Life Safety Plan-Site/Basement Floor AO.1T Life Safety Plan- First Floor A0.2T Life Safety Plan Second Floor A0.3T Life Safety Plan- Third Floor A0.4T Life Safety Plan- Penthouse AO.ST U.L Assemblies ~ AW Document A101/CGIan -1892 Copyright ®1892 by Ttm American Instigde of Architecffi. All rl~e reserved, WARNING: This AIA® Document is protected by U.S. Copyright Law and IntemaUonal Treaties. Unauthorbed reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the lew. This daaunent was produced ! bUB~ ~~ at 08:48:16 on 08/i 5/2007 under Order No.1000295111 1 whk~ expires on 4/4/2008, and is not for resale. (31 58376 3 4 4) AZ.OOT Overall- Basement Floor Plan A2.O1T Basement Floor- Area 1 Floor Plan A2.O1TF Basement Floor- Area 1 Floor Finish Plan A2.lOT Overall- First Floor Plan A2.11T First Floor-Area 1 Floor Plan AZ.11TF First Floor-Area 1 Floor Fmish Plan A2.12T First Floor-Area 1 Floor Plan A2.12TF First Floor-Area 2 Floor Fmish Plan A2.20T Overall-Second Floor Plan A2.21T S~ond Floor-Area 1 Floor Plan A2.21TF Second Floor-Area 1 Floor Finish Plan A2.22T Second Floor-Area 2 Floor Plan A2.22TF Second Floor-Area 2 Floor Finish Plan A2.30T Overall Third Floor Plan A2.31T Third Floor-Area 1 Floor Plan A2.31TF Third Floor-Area 1 Floor Finish Plan A2.32T Third Floor-Area 2 Floor Plan A2.32TF Third Floor-Area 2 Floor Finish Plan A2.40T Overall-Penthouse Floor Plan A2.6T Room Finish Schedules A3.OT Door and Window Schedules Frame Types A3.1T Door and Window Details A3.2T Shell Window Frame Types A3.3T Door and Window Details A3.4T Door and Window Details A4.4T Building Sections A4.ST Building Sections AS.OT Wall Sections AS.1T Wall Sections A5.2T Wall Sections A6.OT Enlarged Floor Plans A6.1T Enlarged Floor Plans A6.2 Interior Elevations A6.3T Interior Elevations A6.4T Interior EIevations A6.ST Interior Elevations A6.6T Interior Elevations A6.TT Interior Elevations A6.8T Interior Elevations A6.9T Interior Elevations A6.1 OT Interior Elevations A6.11T Interior Elevations A6.12T Interior Elevations A7.O1T Basement Floor Reflected Ceiling Plan-Area 1 A7.02T Basement Floor Reflected Ceiling Plan-Area 2 A7.12T Fast Floor Reflected Ceiling plan-Area 1 A7.21T Second Floor Reflected Ceiling Plan-Area 1 A7.22T Second Floor Reflected Ceiling Plan-Area Z A7.31T Third Floor Reflected Ceiling Plan-Area 1 A7.32T Third Floor Reflected Ceiling Plan-Area 2 A8.OT Wall Types and Detail A8.1T Interior Details A8.2T Interior Details A8.3T Interior Details A8.4T Interior Details A9.OT Elevator Plans and Sections MECHAZ•TICAL AIA DOCtnrt@nt At111/Clllte"' -112. Copyright O 1992 by The American Iru~tute of AfChRects. Aii rights reserved. WARNING: This AIA® Document is Copyright Law and International Treaties. Unauthorizml reproduction or distribution of this AIA® Document, or any portion of It, s IniL rotected by US p may result in . severe dvil and criminal penalties, and wlil be prosecuted to the maximttm extent possible under the law. This doaiment was produced ~ by AIA software at 08:49:1 S on 08li5/2007 under Order No.1000295111 1 which expires on 4/4/2008, and is not for resale. 7 344 User ~~ ) (31593 8 P0.0 Mechanical Cover Sheet P0.001 Basement Fouundation Pltmibing Plan Area 1 P0.002 Basement Foundation Plumbing Plan Area 2 P0.01 Basement Waster Plan Area 1 P0.02 Basement Waste Plan Area 2 Pl.l l First Floor Plumbing Plan Area 1 P1.12 Fast Floor Plumbing Plan Area 2 P2.11 Second Floor Plumbing Plan Area 1 P2.12 Second Floor Plumbing Plan Area 2 P3.11 Third Floor Plumbing Plan Area 1 P3.12 Third Floor Plumbing Plan-Area 2 P5.0 Phtmbing Details P5.1 Plumbing Details M0.11 Basement Floor HVAC Ceiling Plan Area 1 M1.12 Basement Floor HVAC Ceiling Plan Atsea 2 M1.01 First Floor HVAC Floor Plan Area 1 M1.02 Fast Floor HVAC Floor Plan Area 2 Ml.l l First Floor HVAC Ceiling Plan Area 1 M1.12 Fast Floor HVAC Ceiling Plan Area 2 M2.01 Second Floor HVAC Floor Plan Area 1 M2.02 Second Floor HVAC Floor Plan Area 2 M2.11 Second Floor HVAC Floor Plan Area 1 M2.12 Second Floor HVAC Ceiling Plan Area 2 M3.01 Third Floor HVAC Floor Plan Area 1 M3.02 Third Floor HVAC Ceiling Plan Area 1 M3.11 Third Floor HVAC Ceiling Plan Area 1 M3.12 Third Floor HVAC Ceiling Plan Area 2 M4.11 Fourth Floor HVAC Fl~r Plan Area 1 M4.12 Fourth Floor HVAC Floor Plan Area 2 M5.01 HVAC Roof Plan Area 1 M5.02 HVAC Roof Plan Area 2 M6.0 HVAC Schedules M6.1 HVAC Details M6.2 Hydronic Piping Schematic FP0.1 Basement Floor Overall Fire Protection Plan FP1.0 Fast Floor Overall Fire Protection Plan FP2.0 Second Floor Overall Fue Protection Plan (Table deleted) FP3.0 Third Floor Overall Fire Protection Plan FP4.0 Fourth Floor Overall Fire Protection Plan ELECTRICAL E1.0 Site Electrical Plan EI.1 Shell and Core Site IIectrical Details 1"s2.O1F Basement Fire Alarm Plan -Area 1 EZ.O1L Basement Lighting Plan -Area 1 F.2.01 M Basement Mechanical Power Pla -Area 1 E2.O1P Basement Power Plan -Area 1 E2.01 S Basement Special Systems Plan -Area 1 E2.02F Basement Fire Alarm Plan -Area 2 E2.02L Basement Lighting Plan -Area 2 F.2.02M Basement Power Plan -Area 2 E2.02S Basement Special Systems Plan -Area 2 E2.1 F Fast Floor Fire Alarm Plan -Area 1 E2.1 L Fast Floor Lighting Plan -Area 1 E2.1 M First Floor Mechanical Power Plan -Area 1 E2.1P First Floor Power PIan -Area 1 E2.1 S Fast Floor Special Systems Plan -Area 1 G>1L AIA Document Ai01/Cti/a*r -1892 Copyright ®1992 bq The American InsttUrte of Archttecfs. Ati Nghte resmtrsd. WARNING: This AIA® Document is protected by US. Copyright Law and IntemaUorrel Treaties. Unauthorized reproduction or distribution of this AIA® Document, or arty portion of it, may result in were dull and criminal perrelties, and will be prosecuted to the maximum eXtent possible under the law. This document was prodteced 7 ! at 08:48:18 on 08/15/2007 un~r Qrder No.i111 1 whid- expires on 414/2008, and is rbt for resale. (3159378344) E2.2F Fast Floor Fire Alarm Plan -Area 2 E2.12L First Floor Lighting Plan -Area 2 E2.12M Fast Floor Mechanical Power Plan -Area 2 E2.12P First Floor Power Plan -Area 2 E2.12S Fust Floor Special Systems Plan -Area 2 E2.21F Second Floor Fire Alaran Plan -Area 1 E2.21L Second Floor Lighting Plan -Area 1 E2.21M Second Floor Mechanical Power Flan -Area 1 E2.21P Second Floor Power Plan -Area 1 E2.21 S Second Floor Special Systems Plan -Area 1 E2.22F Second Floor Fire Alarm Plan -Area 2 E2.22L Second Floor Lighting Plan -Area 2 E2.22M Second Floor Mechanical Power Plan -Area 2 E2.22P Second Floor Power Plan -Area 2 E2.22S Second Floor Special Systems Plan -Area 2 E2.21 F Third Floor Firer Alarm Plan -Area 1 E2.21L Third Floor Lighting Plan -Area 1 E2.21M Third Floor Mechanical Power Plan -Area 1 E2.21 P Third Floor Power Plan -Area 1 E2.21 S Third Floor Special Systems Plan -Area 1 E2.22F Third Floor Fire Alarm Plan -Area 2 E2.22L Third Floor Lighting Plan -Area 2 E2.22M Third Floor Mechanical Power Plan -Area 2 E2.22P Third Floor Power Plan -Area 2 E2.22S Third Floor Special Systems Plan -Area 2 E2.40 Overall-Roof Electrical Plan E2.50 Penthouse Electrical Plans E3.00 Electrical Schedules E3.01 Electrical Schedules E3.02 Electrical Schedules E3.03 Electrical Schedules E3.04 Electrical Schedules E3.05 Electrical Schedules E4.0 Electrical Details E4.1 Electrical Details E5.0 One Line Diagram E6.1 Lighting Compliance Certificate Addendum B A2.11TFR First Floor Finish Plan Area 1 A2.12TFR First Floor Finish Plan -Area 2 E1.0 Site Electrical Plan El.l Shell and Core Site Electrical Details E2.O1F Basement Fire Alarm Plan- Area 1 E2.O1L Basement Lighting Plan- Area 1 E2.O1M Basement Mechanical Power Plan- Area 1 E2.O1P Basement Power Plan- Area 1 E2.O1S Basement Special Systems Plan- Area 1 E2.02F Basement Fire Alarm Plan-Area 2 E2.02L Basement Lighting Plan-Area 2 E2.02M Basement Mechanical Power Plan-Area 2 EZ.OZP Basement Power Plan-Area 2 E2.02S Basement Special Systems Plan-Area 2 E2.11F First Floor Fire Alarm Plan-Area 1 E2.11L First Floor Lighting Plan-Area 1 E2.11M First Floor Mechanical Power Plan-Area' 1' E2.11P First Floor Power Plan-Area 1 Init. AU\ Docmrnmt A101JCMaTa -1992. Copyright ©1392 by The American Iruditute of Archfteds. All righht reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaty. Unauthorh:~ reproduction or distritwtlon of this AIA® Document, or eny portion of it, 8 may result In severe civil and ahninal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced ~ by AIA software at 08:48:18 on0811 5/2 0 07 user Order No.1000295111 1 which expires on o/4/2008, and is rrot for resale. User Notes: (3159378344) E2.11 S First Floor Special Systems Plan-Area 1 E2.12F First Floor Fine Alarm Plan-Area 2 E2.12L First Floor Fine Alarm Plan-Area 1 E2.12L First Floor Lighting Plan-Area 2 E2.1 ZM Fust Floor Mechanical Power Plan-Area 2 E2.12P First Floor Power Plan-Area 2 E2.12S First Floor Special Systems Plan-Area 2 E2.Z1F Second Floor Fire Alarm Plan-Area 1 E2.21L Second Floor Lighting Plan-Area 1 E2.21M Second Floor Mechanical Power Plan-Area 1 E2.21P Second Floor Power Plan-Area 1 E2.21 S Second Floor Special Systems Plan-Area 1 E2.22F Second Floor Fire Alarm Plan-Area 2 E2.22L Second Floor Lighting Plan-Area 2 E2.22M Second Floor Mechanical Power Plan-Area 2 E2.22P Second Floor Power Plan-Area 2 E2.22S Second Floor Special Systems Plan-Area 2 E2.31F Third Floor Fire Alarm Plan-Area 1 E2.31L Third Floor Lighting Plan-Area 1 E2.31M Third Floor Mechanical Power Plan-Area 1 E2.31P Third Floor Power Plan-Area 1 `' E2.31 S Third Floor Special Systems Plan-=~ire~ 1 . E2.32F Third Floor Fire Alarm Plan-Are, ~ E2.32L , Third Floor Lighting Plan-A~a 2 .. ~;~' -. s E2.32M Third Floor Mechanical dower Plan-Area~~ `. E2.32P E2.32S Third Floor Power Plan-Area 2f~ ~, : ~ Third Floor Special Systems PladjAf2 E2.40 Overall-Roof Electrical Play; E2.50 Penthouse Electrical s` ~ -~ `", _ ; ; . ~ . E3.00 t, IIectrical Schedules i ~~~ ...~'' ' . E3.01 IIectrical Schedules ~ ~ ~ ~ E3.02 IIectacal Schedules ~ a . ~ ` r ~~ E3.03 IIectrical Schedules E3.04 IIectrical Schedules E3.05 IIectrical Schedules E4.00 Electrical Details E4.01 IIectrical Details E5.00 One Line Diagram E5.01 Lighting Compliance Certificate § 9.1.6 The Addenda, if any, are as follows: Number p~ p~~ Addendum A 6-18-07 1 Addendum B 7-2-07 182 Addendum C 7-9-07 4 Addendum D 7-16-07 42 Portions of Addenda relating to bidding requirements aze not part of the Contract Documents unless the bidding requirements are also enumerated in this Article 9. § 9.1.7 Other docutt~nts, if any, forming part of the Contract Documents are as follows: (List here any additional documents which are intended to form part of the Contract Documents. The General Conditions provide that bidding requirements such as advertisement or invitation to bic~ Instructions to Bidders, sample fornts and the Contractor's bid are not part of the Contract Documents unless enumerated in this Agreement. They should be listed here only if intended to be pan of the Contract Documents ) Itt~. AUt Document A101lCYa~ -1992. Copyright ®1892 by Tt~ American Institute of Architects. Ati rights reserved. WARNINt3: This AIA® Document is protected by US. Copyright Law and Intenurtional Treaties. Unauthorized reproduction or distribution of this AIA® Document, or eny portlon of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum exterrt possible under the law. Tills doatmerd was produced 9 ! at 08:48:18 on 08/15/2007 urger Order No.1 tit 11 1 whid- expires on 4/4/2008, ark is ~t for rile. (3155.178344) This Agreement is entered into as of the day and year first written above and is executed in at least four original copies of which one is to be delivered to the Contractor, one each to the Constriction Manager and Architect for use in the administration of the Contract, and the remainder to the Owner. OWNER CITY OF MERIDIAN, An Idaho cipal Cotes on (Si nature) (Printed and title) CONTRACTOR Architectural Bm'lding Supply (S re~J~ 11~''Ls~ ' ~~~'1 (Printed name and title) `````,~~it-NU~tNtrri~~~t`i Council Approval: ~ - l ~ - U~ ? ~ , O Attest: _ ~ - SEl~L JAYC L. HOLMAN, CITY CLERIC, y' T ~~ •1 ~~~`~ ~.>~(>f '''''~~~~~rtttrrttttl tt>'~~~>>`~~,``,t~ Approved as to Content BY: KEITH ATTS, PURCHASING AGENT Dated: !'~ 2Jtr - dg Approved as to Form CITY ATTORNEY Inlf. _. ~+..a._ _ ._-- protected by U.S. Copyright Law and Intematlonal Trestles Unauthorized reproductlon ar distribution of this AIA® Document, or any portlon of It, 1 ~ may result in severe civfi and criminal penaltles, and will be prosecuted to the maximum extent possible under the law. This doaenent w~ produced / by AIA software at 08:48:18 on 0811542007 under Order No.1000285111 1 which expires on 41412008, and is not for resale. Use Notes: (3155.178344)