Loading...
HomeMy WebLinkAboutTask Order No. 0726a with Civil Survey Consultants, Inc. for Water Division Facility Phase 2TASK ORDER NO.0726a CITY OF MERIDIAN (OWNER) AND CIVIL SURVEY CONSULTANTS INC. (ENGINEER) This Task Order is an addendum to Task Order No. 0726 issued by Owner and accepted by the Engineer pursuant to the mutual promises, covenants and conditions contained in the Agreement between the above named parties dated November 8, 2006 from Task Order No. 0726. CITY OF MERIDIAN MERIDIAN WATER DIVISION FACILITY -PHASE 2 PURPOSE The Engineer's scope of services was expanded to prepare work associated with design of the new vehicle storage buildings. Services shall generally ~ described as Engineering Consulting Services. TASK 0726.01 -Design and Construction Per the City's request, the Engineer will provide professional engineering services related to the design and construction of the Meridian Water Division -Phase 2 project located at the northerly end of NW 8`" Street. The engineer proposes to provide the following under this scope of services: Prepare work associated with the design of the new vehicle storage buildings. INFORMATION PROVIDED BY OWNER The following information will be provided by the owner. 1. Any available information regarding the site, including old plans of the original treatment facility and any other improvements located within the project area. 2. Based upon previous projects, it is anticipated that there may be on-site soils that have low structural strength and may require a geotextile reinforced pavement section. The Owner will dig test holes throughout the project limits to identify existing soils conditions. The Engineer will observe these test holes and provide a recommendation as to the existing soils suitability for support of the new pavement, or whether a geotechnical engineer will be required. Special geotechnical services, if required, will be provided as a supplement to this agreement. 3. Specific ordinance requirements for building set-backs, landscaping and lighting. 4. A copy of the joint agreement between the City of Meridian and the Ada County Highway District for the existing storm drain system. 5. The owner will pay for all review fees and fees associated with the Joint Application for Permit and agreement with the Nampa Meridian Irrigation District. TIME OF COMPLETION The site survey and preparation of the concept plan will be completed within 60 calendar days of the notice to proceed. Final plans and specifications will be completed within 60 calendar days of approval of the concept plan. COMPENSATION The Not-To-Exceed amount for this Task Order No. 0726a is Two Thousand Four Hundred and Twenty Dollars ($2,420). CITY OF MERIDIAN TAMMY ~ EERD, MAYOR. ``~,, ~ ~ ~, ~, ~ ~,,,,,,,~~ `~ ~~~ `` Attest: (, .... a c ~.l Ai/ ~,.,, ni .~/~ s~ e -lr~-Yc~ ~1~~riAe~J '; ~Cj~ ~s~ ENGINEER 'I'fMdTHY A. BURgESS, VICE PRESIDENT by City Council: v (Date)