HomeMy WebLinkAboutChange Order No. 8 with Primeland Development Co. LLC for North Black Cat Trunk SewerCHANGE ORDER 8 PROJECT: North Black Cat Trunk Sewer DATE OF ISSUANCE: 4/2108 EFFECTIVE DATE: `~htto$ OWNER: Primeland Development Co. LLP CONTRACTOR: Brown Construction, Ittc. ENGINEER: JUB Engineers Page 1 of 3 You are directed to make the following changes in the Contract Documents. Attachments: ~ Work Change Directives # 2 and 3 CHANGE IN CONTRACT PRICE: (.'RANGE IN CONTRACT TIMES: Original Contrdc:t Price Original Contract Tines $ 1,717.487.31 Substantial Completion: _168 Days - Mav 1.2008 Ready for final Payment: 213 Days -June I S. 2(>n$ days m dines Net Changes from previous Change Orders No. I to No.~ Net Changes from previous Change Orders No. 1 to No. 6 $ 45.055.00 2is .. gar Contract Price prior to this Change Order Contract Times prior to this Change order Substantial Completion: 168.5 Days -May 1, 2008 $ 1,762,542.31 Ready for Fnal Payment: _ 21.5 Days -June 15.20()8 days or dares Net Increase (decrease of this Change Order) Net Increase (decrease of this Change Order) $ 13166.00 ~ 6 ~yc Contract Price with all approved Change Orders Contract Times with all approved Change Orders Substantial Completion:. Days - 206.5 May 30.2008 $ 1,773.708.31 Ready for final payment: Days - 251.5 July 16.2008 myti or dare. RECOMMENDED BY OWNER: B ~~ ~ Date: 412108 APPROVED BY OWNER: Date: ~(Z4.I0~ ACCEPTED BY CO OR: By: Date: 4/2/08 Tammy a Weerd, Mayor Date: ~'~ ~ ZS - c9 ~ Attest: ~-rc>re 4~d ~.g+.n Date• y zZ ^`~~~„ 'LllllltJl~~~/r '+. ~~ ., .~ ~,,~lllI11111111~~~`,```` ., ty Clerk I ~~~ T tsz . P~ ,,~: Q ~. .~ •, '!~/ Approved by City Council: o~ ZZ ~I7 '~~~'~~,,~ oFr aincx cartxtnmcs~x aousr-~r, moo wow cs~.vGE n~c~ No. 492 DATE OF ISSUANCE _03/31108 EFFECTIVE DATE 03131/08 OWNER CitY~~ *i i CONTRACTOR _ Brown ~odon Contract: Project: North Black Cat Trunk Sewer OWNER's Contract No. ENGINEER'S Project No. __10-05-026 You are directed to proceed promptly with the following change(s): Description: A 60" Type `B" "Through" nranbole shall be added at Station 136 + 13.1 t . Critical elevations shall be as follows: Rim =254130, 21" IE In = 21" IE out =2516.80, 8" ?E In (E) =2517.72. Northing = 72478357, Fasting =2438892.69. 29 f inear feet of 8" sewer shall be installed east from the new 60" `Through" manhole at a 3.30% slope. The 8" stub shall be at a 90 degree angle to the 21" sewer trtnnk. The end of the stub shall be capped and marker! to the surface aad shall be located as follows: Northing = 724783.29, Fasting = 243892337. Purpose of Work Change Dir+octive: To accommodate sewer flows from the Beilhaven Subdivision. Attachments: (List documents supporting change) If OWNER or CONTRACTOR believe that the above change has affected Contract Price any Claim for a Change Order based thereon will involve one or mote of the following methods as defnied in the Contract .Documents. Method of determining change in Contract Price: ^ Unit Prices ^ Lump sum ~ ~~ ^ Cost of the Wo -,T Estimated increase (decrease) in Contract Price: Estimated increase {decrease) in Contract $ ~5~'3 , b© Times: ff the change involves an increase, the estimated Substantial Completion: ~ days; amount is not to be exceeded without further Ready for final p~ayt~ztt: _~ days. authorization. RECOMMENDED: ENGINEER AUTHORI2~: OWNER By: sy: E1CllC No. 1910-8-F (199(1 Edition) Premed by tlK Eogineas lobo Conaact Doaanems Cwmmmoe snd endowed by the Asaa Geaaal C.omxaaas of Amerka and me Consoucooa Spate ~ - ctrsr oF-~Itmuw NORTH 8tAC1C CAT TRUNK SEWFR ADA COUNTY. IDAIiO R~ORB CHANGE DIRECTIVE No. 003_ DATE OF ISSUANCE 031311~,1~, 1:~7ECTIVE DATE _ _03131 OWNER - Citv of Meridian CONTRACTOR Brown CO~ctniction Contract: Project: ~ North Black Cat Trunk Sewer OWNER's Contract No. ENGINEER's Project No. 10-OS-~26 You are directed to proceed ~om~ptly with the following change(s): Description: A 60" Type "B" "T'hrough" manhole shall be added at Station 149 +96.72. Critical elevations shall be as follows: Rim =2541.64, 21" IE In = 21" IE out =2518.67, 8" IE Block-Ota In (W} = 25 t 9.75, Northing = 726167.11, Fasting = 2438906.89. Purpose of Work Change Directive: To accommodate sewer flows from the Coleman Subdivision. Attachmettts: (List documents supporting change} If OWNER or CONTRACTOR believe that the above change has affected Contract Price any Claim for a Change Order based thereon will involve one or more of the following methods as defined in the Contract DocttTtt~ents. Method of determining change in Contract Price: ^ Unit Prices ^ Lutt~ Sum gam; ~ ~+ pO ~( Cost of the Work__l?"~' SJ' ~ ~~ Estimated increase (decrease} in Contract Price: Estimated ittca~ease (decrease) in Contract $ !o ,ry- $ •~~ Times: If ttte change involves an increase, the estunated Substantial Completion: ~ days; amount is not to be exceeded without further Ready for final paytret-t: _,~_ days. authorization. RECOI4FVIENDED: AUTHOR~LED: ENGINEER owNER By: Bye E.ICDC No. 1910-8-F ([996 Edition) ttepeled by tlr Eagioons Joio< Contract t>oc C ~d e~lasdd by'tue Assaci~ed General Coanactas ~ Amaeica and tlb Con'ipeeifiatiava tote.