HomeMy WebLinkAboutChange Order No. 1 with Knife River for Black Cat Trunk Sewer, Phase 4 Schedule B&CCITY OF MERIDIAN
33 EAST IDAHO
MERIDIAN, ID 83642
CONTRACT CHANGE ORDER
Change Order No.: 1
Project Number: 0738a
Date: 3/18f2008
Effective Date:
CONTRACTOR: Knife River
PROJECT: Black Cat Trunk Sewer, Phase 4, Schedule B8C
The Contractor is hereby directed to make the following changes from the Contract Documents and Plans.
Desciption:
1) Sewer line re-alignment through Bear Creek Park (Knife River C.O.R. #1} ADD $ 1,553.78
2} WCD No. 001 -Construct additional asphalt pathway (Knife River C.O.R. #2) ADD $ 1,294.30
3) Revised Construction Starling Point (Knife River C.O.R. #3} ADC $ 3,G03.C0
4) WCD No. 002 -Construct and Install additional manhole (Knife River C.O.R. #4) ADD $ 5,370.00
$12,021.08
Reason for Change Order:
Construction revisions as project proceeds.
Attachments:
1) Knffe River C.O.R. #1
2) WCD No. 001 (Knife River C.O.R. #2)
3) Knife River C.O.R. #3
4) WCD No. 002 (Knife River C.O.R. #4)
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price: $626,979.20 Original Contract Completion Date: 5/3/2008
Original Contract Completion Days: 5/23/2008
Net changes form previous C.O.'s.: Net Days change form previous C.O.'s:
No. d to Q No. 0 to 0
$0.00 0
Contract Price Prior to this C.O.: Contract Completion Date before this C.O.: 5/3/2008
$626,979.20
Net Increase {decrease) of this C.O.: Net Days Increase (decrease) of this C.O.: 0
$12,02 ~ .08
Contract Price with all Approved C.O: s: Contract Completion Date with all Approved C.O: s: 5/3/2008
$639,000.28
RECOMMENDED: (CONSTRUCTION MANAGER) ACCEPTED {CONTRACTOR)
By; ~~~-- By:
Date:: ~~ ~ Date:
APPROVED: (CITY PURCHASING AGENT) COUNCIL APPROVAL \`~~~~'"~ ~r~ f~~~~,,,
~
By: Keith Watts ~
,~
Date: ~~~ ~/~8 O
Date:
APPROVE ) '~-. ATTEST: SEA
By: Mayor Tammy de eerd ~ By: City Clerk, Jaycee Holman ~ '~
~ r ts~ • ~~
~~
~~%
D
t
Date: `
..
a
e:
KNIFE ~IVEft
AN MDU RESOURCES COAAPANY
5450 W. Gowen Road
Bose, ID 83709
(208) 362-6152
(208) 362-6199 FNi
March 14, 2008
Max S. Jensen
City of Meridian
650 E. «~atertower. Suite 200
Meridian, ID 83642
Re: Black Cat Trunk Sewer, Phase 4, Schedule B & C
Subject: C.O.R. #1 -Additional Work
Dear Max:
Knife River requests a change order for the following additional work.
Southern Idaho D'ndsion
The project was redesigned to eliminate going through the asphalt pathway and avoiding
crossing the Hardin Drain in two locations. The new design allowed the work through the park
to be completed at an accelerated schedule.
Black Cat Rev 1 Changes
Old Design
Delete 27" PVC
60" Manhole
72" Manhole
Hardin Drain Crossing
AC Patch
SOD Repair
-1016 LF @ 83.90 $(85,242.40)
-3 EA @ 5370.00 ${16,110.00)
-1 EA (a~ 7740.00 $(7,740.00)
-2 EA @ 1700.00 $(3,400.OOj
-341 LF @ 43.2.0 $(14,731.20)
-595 LF @ 43.20 $(25,704.00)
Sub-Total: $(152,927.60)
O:\Black Cat Trunk Sewer PH4, Sch B&C - M7666b1COR\#1 -Additional Work.doc
KNIFE RIVER
New Design
27" PVC 1001 LF @ 83.90 $83,983.90
60" Manhole 1 EA @ 5370.00 $5,370.00
72" Manhole 2 EA @ 7740.00 $15,480.00
Storm Drain Crossing 1 EA @ 1100.00 $1,100.00
Grass Paver 60 SY na, 62.60 $3,756.00
AC Patch 238 LF @ 43.20 $10,281.60
SOD Repair 740 LF @ 43.20 $31,968.00
Replace MH Bases
(BV INV 16748) 1 LS @ 2310.80 $2,310.80
Contractor OH & M on
BV Inv. 0.1 % @ 2310.80 $ 231.08
Sub-Total: $154,481.38
Grand Total: $1,553.78
If you have any questions or comments, please contact me.
Sincerely,
. ~+~..~
essee Rosin
Project Manager
JR: km
0:1BIack Cat Trunk Sewer PH4, Sch B&C - #76066\CORVt1 -Additional Work.doc
20g46$4~g Boise Vau1tlG28
BOISE VAUI'T
R
648 Carnation Dr.
Nampa, Idaho 83687
208 /483-6340
FAX 208 /463-4268
09:35:40 02-05-2008 1 /1
INV ~~,? (c
4UOTE ID
ORDER DATE
SHIP DATE ~ - ~ -
ITEM OTY.ORD. SHIPPED DESCRIPTION UNIT PRICE TOTAL
~~ ~
~ ~ ,0 Jc. s , oen
. Z
~f
I
ti
n
n
Post-N°D Fau Note 7671 °~ -gj p~s- I
To ..1~7~ ~ From
ColDept. CN.
~
Phones ~+a^B
Fax4 ~~
DRwE ~,.,~._..,~. Shipping
~ADINs ,r r ~ ~ Tax t 3 O . ~ ~
TOTAL 3 ,43,0
ARRNAL
I have inventoried quantity and quarity and found all to be satisfactory. ff trot, I have ~ filed above items riot satisfactory. In signing this receipt toms, I hereby
release Boise Vault 8 Precast of a0 future deans of any nature for above listed malarial. I also adurowledge that ap above material and related debts must be paid
for In tuN rwt later than the 10th day of the month following the month of delivery. Customer agrees to pay collection costs and reasonable attorney tees ff account
becomes delinquent Lien laws xrt71 be enforced. Retainage or deductions are trot accepiabie.
Recreived Date
KN 1 FE ftIVE#~
AN MOU RESOURCES COMPANY
5450 W. Gowen Read
Boise, ID 83709
(208)382-8152
(208) 382fi199 FAX
March 14, 2008
Max S. Jensen
City of Meridian
660 E. Vi~atertower, S>,tite 200
Meridian, ID 83642
Re: Black Cat Trunk Sewer, Phase 4, Schedule B & C
Subject: C.O.R. #2 -Sidewalk Repair Change
Dear Max:
Southern Idaho O'nrision
Knife River requests a change order for the following additional work.
At the request of the City of Meridian, the original design was changed from a Type III sidewalk
repair to a Type II repair.
Old Design
Type III Sidewalk Repair -171 LF @ 14.70 $(2,513.70)
Sub Total: $(2,513.70)
New Design
Install Typ>r F'~ Sur~:,E 1?0 LF v
If you have any questions or comments, please contact me.
Sincerely,
' ~4~_
essee Rosin
Project Manager
JR: km
O:~Black Cat Truak Sewer PH4, Sc6 IiBcC - #760661CORVt2 -Sidewalk Repair Chaage.doc
Sub-Total: $3,808.00
Grand Total: $1,294.30
CITY OF MERIDIAN
BLACK CAT TRUNK SEWER PHASE 4, SCHEDULE B&C
ADA COUNTY, IDAHO
WORK CHANGE DIRECTIVE
No. ao l
DATE OF ISSUANCE 2-12-08 EFFECTIVE DATE _2-12-08
OWNER Cit}~of Meridian
CONTRACTOR Knife River
Contract: Black Cat Trunk Sewer Phase 4, Schedule B & C
Project: Black Cat Trunk Sewer, Phase 4, Schedule B & C
OWNER's Contract No. 0635 a ENGINEER's Project No.
You are directed to proceed promptly with the folior~i•ing change(s):
Description:
Construct an additional asphalt pathway near the east side parking lot of Bear Creek Park. 'The
pathway is to be constructed from Bear Claw to MH 27 as detailed in Attachment `A' and `B'.
Purpose of Work Change Directive:
Pathway access
Attachments: (List documents supporting change)
Attachment `A' and `B"
If OWNER or CONTRACTOR believe that the above change has affected Contract Price any Claim for a
Change Order based thereon will involve one or more of the following methods as defined in the
Contract Documents.
Method of determining change in
Contract Price:
^ Unit Prices
^ Lump Sum O
^ Cost of the Work ~ Z cl `~ • 3
Estimate increase~i~a ease) in Contract Price: Estimated increase (zleereese}in Contract
$ ~ 1 Z,q y • 3 Times:
If the change involves an increase, the estimated Substantial Completion: ---~-days;
amount is not to be exceeded without further Ready for final payment: _~ days.
authorization.
RECD ENDE AUTHORIZED: AA ~~ __
~~ ~ot~~
O s P CT ANAGER OWNER's ENGINEER
By: ~~~a~~ Br s.G~+ D~~
EJCDC o. 1910-8-F (1996 Edition)
Prepared by the Engineers Joint Contract Doctnrertts Committee and endorsed by The Associated General Contractors of America and the Construction Specifications
Institute.
Attachment `A'
Additional asphalt paving and concrete work shall be constructed in accordance
with Attachment `B', the current construction plans, project manual and
ISPWC.
`] L~ ~
`-7 C-' 3Q j 00+g
U
Yom. ~~l1M
o~~z `~Pli 3f'
Nm~w Q~~NU
~ ~ N ~ Z O ~
n.~ fnw~ O a •O~
N°~ N~ ~ry0. icy
W ~ '~ O .J
W r N d
~ ~
= O
F-
p In LC ~ w
~ ~ ~
Q~ W W O `~W ON
~w ~ o~~ W ~~ i0
Q~U WOE O WV ~ Z
°Oz ~ m~z F ~ a
U~ N ~wF U w
Q~ N NW(n O ~
~p 0. JZ~ ~ OQZ Q Q
>-~r QQ~ Q Q~Q ~ ~ O
w O m "-
~~ ~ ~?H W OW '~ ~ wN J ~ N~
a
~~ w ~c°na w Q~ r w oo a ~- N~
WN~ ~O~ Z ~N O NZ O
ZO Z QF-~ Q ZO ~ ~ QV
mom- w
L~ U U ~ N ~
Uz ~ ~~a 'Q ~ o ~
O ~ az~ ~ w ~ ~oN
ww~ ~pZ o ~ r-°'N
omQ Q~w m~ ~w'~ ~ ~a
~ J w ~ ~ ~ ~ C3 r a- i-=
J~ Q a~JJ= OQ Q'~ ~ Q~
Q J N JJN ~~ N N
d
~o a a~Q ~a
cn m N
Z Q~t~i> op ~, .~
~ "~ 3'~ ~ a w , RZ~'
a~ ~ Zw~ o~°-~ R~0.0 RZ~.~,
N o ~ wo ~ ; z o ,~ ~~d~ R1 '°~
~U Q ~ZZ U
~~ w v ao g~ ~ ~~~0
_~ ~j D
~fn ~ J NQ rife
O¢=w o~¢ oa S S
z~ cno zaw zvr
r
.~
a-+ m
L ~
.^
~ ~
C V
V .'~"'(
L
III
KNIFE ftlVEf~
AN MDU RESOUR(~S COEAPANY
5450 W. Gowen Road
Boise, ID 83709
(206) 362-6152
(206} 362.6199 FA)(
March 14, 2008
Max S. Jensen
City of Meridian
660 E. Watertower, Suite 200
; r:crdian, i D 3? 642
Re: Black Cat Trunk Sewer, Phase 4, Schedule B & C
Subject: C.O.R. #3 -Additional Time
Dear Max:
Knife River requests a change order for the following additional work.
Southern hleho Diu
At the beginning of the project, Knife River was requested to start at MH No. 23 versus the tie-in
manhole on Stoddard Road. This change required that Knife River would need to use different
excavation methods to install the sewer between MH No. 23 and MH No. 22. This change required that
Knife River would need one (1) additional day of crew construction to complete this change. Therefore
the cost of this work is:
Revise Construction Starting Point:
(1) Additional Crew Day for Production
750 Excavator
644 Loader
Hoepack
Sarvi;.;a Trucx
Extra Fuel
Generator
End Dump
Labor 5 Man Crew
1 Day @ $3,803.00
Sub-Total
;rand Tc:al:
$3,803.00
$3,803.00
$3,£03.04
If you have any questions or comments, please contact me.
Sincerely,
. ~~ .~--
essee Rosin
Project Manager
JR: km
0:1Black Cat T~uak Sewer PH4, Sch B&C - ft76066\CORVi3 -Additional Time.doc
KNIFE ftlVEfit
AN MDU RESOURCES COMPANY
5450 W. Gowen Road
Bone, ID 83708
(208) 362.6152
{208) 362-6199 FAX
March 14, 2008
Max S. Jensen
City of Meridian
6fi0 E. Water*.ower, SuitN 200
Meridian, ID 83642
Re: Black Cat Trunk Sewer, Phase 4, Schedule B & C
Subject: C.O.R. #4 -WCD No. 002 60" Manhole
Dear Max:
Knife River requests a change order for the following additional work.
Southern Idaho Diiraian
At the request of the City of Meridian, a 60" manhole is to be installed at Sta. 2+75 as per WCD
No. 002. This manhole will allow for better cleaning and maintenance for City personnel.
New Design
Install 60" Manhole 1 EA @ $5,370.00
Sub-Total:
brand Tot: '.:
If you have any questions or comments, please contact me.
Sincerely,
.~
essee Rosin
Project Manager
JR: km
$5,370.00
$5,370.00
$5,370.OL~
O:\Black Cat Trunk Sewer PH4, Sc6 B&C - N76066\COR\#4 -Add 60 MH.doc
CITY OF MERIDIAN
BLACK CAT TRUNK SEWER, PHASE 4, SCHEDULES B & C
ADA COUNTY, IDAHO
WORK CHANGE DLRECTIVE
No. 002
DATE OF ISSUANCE 02/25/08 EFFECTIVE DATE 02/25/08
OWNER City of Meridian
CONTRACTOR Knife River
Contract:
Project: Black Cat Trunk Sewer, Phase 4, Schedules B & C
OWNER'S Contract No. 0738 a ENGINEER'S Project No. 10-06-059
You are directed to proceed promptly with the following change(s):
Description: A 60" Type "B" "Through" manhole shall be added to the Schedule C 10" sewer line in
Stoddard Road at STA. 2 + 75.00. Critical elevations shall be as follows: Rim = 2620.93, 10" IE In =
10" IE out = 2602.94
Purpose of Work Change Directive: To better accommodate cleaning and maintenance operations on the
sewer after construction.
Attachments: (List documents supporting change)
If OWNER or CONTRACTOR believe that the above change has affected Contract Price any Claim for a
Change Order based thereon will involve one or more of the following methods as defined in the
Contract Documents.
Method of determining change in
Contract Price:
^ Unit Prices
^ Lump Sum
^ Cost of the Work
Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract
$ Times:
If the change involves an increase, the estimated Substantial Completion: days;
amount is not to be exceeded without further Ready for final payment: days.
authorization.
RECOMMENDED: AUTHORIZED:
ER ENGIN ER OWNER ENGINE
By: Cl:~r ~b1s6Y By: <~,'et 1 ~l ~7
EJCDC No. 1910-$-F (1996 Edition)
Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated Geceral Contractors of America and the Construction Specifications
Institute.