HomeMy WebLinkAboutChange Order No. 1 with K2 Construction for Water Division Phase 2CITY OF MERIDIAN
33 EAST IDAHO
MERIDIAN, ID 83642
CONTRACT CHANGE ORDER
Change Order No.: 1
ProJeil Number 0726 C
Data: f~/27no0s
Effective Date:
----
CONTRACTOR: K2 Construction
PROJECT: ~ Water Dhrision -Phase 2
The Corrhactor is hereby directed to make the following changes Iran the Contrail Documents and Plana.
Deaciption: Amount
wCD No.t) Revise Electrical Plan $1,390.97
wCD No.2) Stabilize SOG Subgrade $2,243.87
wCD No.3) Revised Edogy Blocks at Stockpile Area $0.00
wCD No.4) Stabilize AC Subgrade $23,742.29
$27,377.13
ti~aaon for Change Qrder:
wcD No.1) Add 'interior lights.
wcD Noe) SOG sub-grade was unstable to build on. Additional labor and material required to stabllze.
wCD No.3) Lack of availability of Ecology Blocks. Revised gravel stockpile area.
wCD No.4) AC sub-grade was unstable to build on. Additional labor and material required to stabilize.
Attachments:
WCD No. t through 4. .
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contrail Price: $468,665.00 Original Contract Completion Date: 9/10/2008
Original Contract Completion 90 WOrkin
Net d~anges fain previous C.O.'s.: Net Days drange form previous t:.0: s:
No. Q to Q ~ No. 0 tD Q
$0.00 0
Contrail Prtoe Prior to this C.O.: Contrail Completion Dam before this C.O.: 9/10/2008
$468,665.00.
Net increase (decrease) of this C.O.: Net Days increase (dea~ease) of this C.O.: 8 Working
$27,377.13
Contrail Prbe with all Approved C.O.'s: Contract Completion Date wig afi Approved C.O.'s: 9/22/Z008
5496,042.13
RECOMME DED: (coNSTRUCrt(z~i MANAGER) ACCEPTED ((~NTIRACTOR)
Date: (y/Z7 O Date: ,.,-~a
APPROVED: (GTY PUR G COUNCIL APPROVAL
By. Keith Watt ~
Date: ~~~~0 ~ Date: ~ - /~ _h ~
~•` d~ '~,
`~
APPROVED: (txTY) ATTEST:
- ~~~
B : r Ta
y ~ de Wee ~/
Date:
V By: City Clerk, Jaycee Holman (~/
~
'
~
~
~ -- ~ ~ ~