Loading...
HomeMy WebLinkAboutChange Order No. 1 with K2 Construction for Water Division Phase 2CITY OF MERIDIAN 33 EAST IDAHO MERIDIAN, ID 83642 CONTRACT CHANGE ORDER Change Order No.: 1 ProJeil Number 0726 C Data: f~/27no0s Effective Date: ---- CONTRACTOR: K2 Construction PROJECT: ~ Water Dhrision -Phase 2 The Corrhactor is hereby directed to make the following changes Iran the Contrail Documents and Plana. Deaciption: Amount wCD No.t) Revise Electrical Plan $1,390.97 wCD No.2) Stabilize SOG Subgrade $2,243.87 wCD No.3) Revised Edogy Blocks at Stockpile Area $0.00 wCD No.4) Stabilize AC Subgrade $23,742.29 $27,377.13 ti~aaon for Change Qrder: wcD No.1) Add 'interior lights. wcD Noe) SOG sub-grade was unstable to build on. Additional labor and material required to stabllze. wCD No.3) Lack of availability of Ecology Blocks. Revised gravel stockpile area. wCD No.4) AC sub-grade was unstable to build on. Additional labor and material required to stabilize. Attachments: WCD No. t through 4. . CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contrail Price: $468,665.00 Original Contract Completion Date: 9/10/2008 Original Contract Completion 90 WOrkin Net d~anges fain previous C.O.'s.: Net Days drange form previous t:.0: s: No. Q to Q ~ No. 0 tD Q $0.00 0 Contrail Prtoe Prior to this C.O.: Contrail Completion Dam before this C.O.: 9/10/2008 $468,665.00. Net increase (decrease) of this C.O.: Net Days increase (dea~ease) of this C.O.: 8 Working $27,377.13 Contrail Prbe with all Approved C.O.'s: Contract Completion Date wig afi Approved C.O.'s: 9/22/Z008 5496,042.13 RECOMME DED: (coNSTRUCrt(z~i MANAGER) ACCEPTED ((~NTIRACTOR) Date: (y/Z7 O Date: ,.,-~a APPROVED: (GTY PUR G COUNCIL APPROVAL By. Keith Watt ~ Date: ~~~~0 ~ Date: ~ - /~ _h ~ ~•` d~ '~, `~ APPROVED: (txTY) ATTEST: - ~~~ B : r Ta y ~ de Wee ~/ Date: V By: City Clerk, Jaycee Holman (~/ ~ ' ~ ~ ~ -- ~ ~ ~ d ' , ~ .• ~ (B • - C~ 6 _. __ ... .~ ~~rrrNu.~ ~..a~~~~~~