HomeMy WebLinkAboutChange Order No. 7 with JC Constructors, Inc. for WWTP Expansion ProjectCHANGE ORDER 7
PROJECT: City of Meridian -Wastewater Treatment Plant Expansion Project
DATE OF ISSUANCE: October 8, 2008 EFFECTIVE DATE: October 8, 2008
OWNER: City of Meridian
CONTRACTOR: JC Constructors, Inc. ENGINEER: CH2M HILL
You are directed to make the following changes in the Contract Documents.
• Replacement of existing 30-inch diameter Raw Sewage pipeline with a 42-inch diameter Raw Sewage pipeline to
alleviate the bottleneck between the Headworks and Primary Clarifiers. (WCD 39)
Attachments: JC Constructors Change Proposal Request - (WCD 39) -May 15, 2008 for $137,039.91
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price Original Contract Times
Substantial Completion: 670 Davs -September 1, 2007
$ 8,367,500.00 Ready for Final Payment: 730 Dates -November 1, 2007
aaysordates
Net Changes from previous Change Orders No. 1 to No. 5 Net Changes from previous Change Orders No. 0 to No. 4
98
$ 734
263 213 days
,
. ~~
Contract Price prior to this Change Order Contract Times prior to this Change order
Substantial Completion: 670 Days - September 1, 2007
$ 9,101,763.98 Ready for Final Payment: 730 Days -November 1, 2007
days or dates
Net Increase (decrease of this Change Order) Net Increase (decrease of this Change Order)
$ 137
039
91
,
.
says
Contract Price with all approved Change Orders Contract Times with all approved Change Orders
Substantial Completion: 670 Davs - Seetember 1.2007
$ 9 238,803.89 Ready for Snal payment: 850 Days - Febru 2arv 8.2008
days or sates
CHANGE PROPOSAL REQUEST
1.PROJECT
MERIDIAN WWTF 2.CONTRACTC~R
JC CON:iTRUCTORS 3.PROJECT NO.
~`~ Change Proposal #
WCD # 39
IMPROVEMENTS 5.CONTRACT NO: 6.PROPOSAL DATE
15-Ma -08
DESCRIPTION OF CHANGE
Upsize main influent pipe to 42 inches
COST SUMMARY
A. FOR CHANGE WORK DIRECTLY PERFORMED BY THE UNCIERSIGNED CONTRACTOR
1. Direct labor w/ labor fringes (Attach supporting detail estimates ~ NiUi man-hours and rates) $ 33,440.09
2. Insurance and Labor Taxes $ 7,968.98
3. Materials and Equipment Detailed quantities attached. $ 75,995.00
4.Ovefiead 8~ Fee @ 15% $ 17,610.61
$ -
T1m® Extentlon Requested 0 woPkinA daX JC Constructors' Cost $ 135,014.69
B. For work to be performed by subcontractors, per proposals and detailed breakdowns
1.
SUBCONTRACTOR NAMIE
CATEGORY OF WORK
AMOUNT
2
TOTAL SUBCONTRACTOR AMOUNT (INCLUDING SUB. OH&P~
$ -
3
CONTRACTORS COMMISSION ON TOTAL SUBCONTRACTOR AMOUNT (~ b PERt:ENT: '
$ -
CONTRACTORS BOND COST (ap $.018/1000 $ 2,025.22
C. TOTAL INCREASE OR DECREASE OF CONTRACT PRICE - (A8+65)
$ 137,039.91
JC CONSTRUCTORS, INC.
CONTRACTOR NAME
Jlm Cox
PRINTED NAMEONPROPOSAL SIGNATURE/DATE
Page 1, JCC
3;`~ E s ~~ p~ ~, ; j ~t ~ ~; - ~~ ;~ z t'
,$~
~~ k ~ ~ ~ ~ ,. e_, ~ i
~;~ I ~ z~~~' i ~ t y~ ~_t i 6~ .~ ~ °I~ I 't t'.
~i ~ ~ I~ f L f 7~~ ~ a i
~. ., ~ -1I f { ~ ,~j'~j i ), ~ ' l lY 1 4 t
;t ~ ~'.i ~~ ~( ~ ~ ~~ ~~ ~: i ~. ' ~. ~ ~ ~ Fit 3 ~ ~
CCC ~4 i i ~ '. ~ ~ 1I i .I
~ t f t i~ r ~~ S I ~~ ~ { ~ ~ :~ F ;,~ ~ ~;
F ~ ~ ~{ 3 ~ , x~ ,-
t i ~s i ! ~ 6 . ~ x ~ h ~ z 1- , ~ ~
JC CONSTRUCTORS, INC.
Change Proposal Request # WCD # 39
nam:
Scope of ctmn~:
Upslze main influent pipe to 42 Inches
0
0
0
0
Desaiptbn Quanh'ry UMt La bor Material
FbalUNt Floras $Nntt Cost
Mobs N and out 3.00 1.80 4.50 178.00 25
Ex a bottom of atmaure 1.00 D 20.00 20.00 0.00
Re-mld or ah lbre 1.00 ob 15.00 18.00 3$0.00
PI od tlrre 30• tvU wtth retalrer 1.00 b 3.00 3.00 450.00 $450
Dena and tmW ot1 od 1.00 b 4.00 4.00 T50.00
Stare and rt and Bxcev8110 1.00 b 20.00 20.00 1000.00 $1 000
rt le and area mrdutDt t.00 2o.ao 20.00 0.00 $9
Fx nmem & bed 1.00 b 30.00 90.00 850.00
42' and 1.00 b 110.00 110.00 32000.00 $3
eaddlll and a 1.00 30.00 30.00 1500.00 $1 800
Restore walks arb and covar 1.00 40.00 40.00 1850.00 1550
SBt draft - Urnb 8nd secure 1.00 Ob 40.00 40.00 300.00
Comrotled fl0 1.00 20.00 20.00 7500.00 800
Cut watl 8 remove 1.00 b 0.00 0.00 750.00 $750
Patch watl at 1.00 200 200 25.00
Cut kl Blde ate and 1.00 8.00 8.00 228.00
Fonn aM ur box 8.00 24.00 192.00 280.00 080
Dr01 and dowels 1.00 4.00 4.00 800.00
G and 1.00 7.50 7.50 2200.00 $2
Install ales 2.00 ea 8.00 18.00 120.00 40
etas too to o.ao o.o0 5500.00
Set tear tlowrt 1.00 b 90.00 90.00 0.00
Ptrm and 0rre rarrtal 3.00 0.00 0.00 2350.00 7060
Access and 1.00 b 5.00 5.00 250.00
Ex0erded General Cordttorre 1.00 rrarWr 180.00 180.00 2200.00
0.00
R~ 0.00 $0
Fxravator 1.00 aamh 0.00 8400.00 $8400
Pum irxAWed above 0.00 0.00 0.00
Com r 1.00 weak 0.00 200.00
L.08dar 2.00 week 0.00 2400.00 800
trW9c 1.00 week 0.00 900.00 $900
0.00
0.00
Horua l 841.00 I Mart I $7s,9~ I
Page 3
,, 1 i ~ ~ ~
~ y
~ ~ ~ ~ I r ('.'
~
.
P 1 l"t
t 1 ~ Y
~ ~
, ; ~ ~[
` ~ ~~.
s
I p ~ .~ ~ , .. ~ i
~r
S F; .F
t
~
~ ~ .
~ I k 1
{
~ 1 r ~~
1
[Y
y
r ~~°
'
c ~
Y
~
~
~~
'~
.
~ l:
t
=
i~ t l:§,
j{ ` f a.
~ -
: ~ 1
t i r
~ ~
1 ~ ~~,~
~ ...~ t
l:.
f _ ~ :
' ~
` ~
a f ~ }~~ i. c
~ ~ _
~
r
` 1 rr l f r
~
'
t j ~'~~
t ,
~ 1
(
~
~ r
~
7
' I
Yi
,° ~ ~
~.f 1
~
~
1 i~:
~I::
~
~
:~
f
1 Ip ~ ,~.
~ _
~ ~ l l 3 ~
~ ~ j ,~s
~ ~
~ 1 ;k ~..
l; mow'
s ' i i ~ , ~ ~
~ ~
~
~ . f'
i
@
Sv
~ l' ;7q e ~ ! ~ ~ _t. r'
t j ~I r 3~(
„~ ~ ~ 3., i d, i~-
I ~ ~ 1 t ~ ~ r ~~
'~
~ i±'d ~ ~ ~ ~,
~ . . ~'r 7:. ': is
,
' ;
F ,1
PVC pica Oom Urdted $30.700.00 Labor bldudes prc assembly aM rdght time thin
Gobal Sampson
;
i ~ d
I
f A b ' ' t ~ ~
i ~
l
l 49
~
hp f ' `S
.
~ {F ~ f
~
~
~ ,
I ,..
~: ~~ ~ try.;
~
} ..i
I
4~ ~ ~'
~ .~ ,
'
.,
` ~ I
' ~~ 5
~
t i (
r ~ 3
~
~ '
~ ~ S~
S
^
f ~
S ;
2~
! ,
*
i'
~ S
Ott
,'; ~ij '~
t~'~ Z
~,
r
~ ,
-i.:
~
i l
9
~
'~ i
t
f 3~,
l
3 i
r ;
l t,
1
,
+ ,d ;
,
~ t
t:
i t
t
i
1 ;~ ~l
~
~
aa(( +
~
t