AGItEE1tiIENT FOR DESIGN SERVICES AND SERVICES DURING CONS7CI2IJCTICDN FOIL
TIIE CITY OF IVl[E IAN BITTER CREEK LIFT STATIttN AND PIPELINES PI2(3,IEGT
BETWEEN
CITY' E3Ft' MERIDIAN AND CHZIGI BILL, INC. '
This Arraeaidment is entered info by end between City of NiERiDIAN (OWNER) and CH2M HILL,
Inc:. i(ENGII~dEER
A. O~J~NER .and ENGINEER entered. into an Agreement (A+GREEMENT) for Engineering
Services for the City of Meridian Mason Creep Lift Station and. Pipelines project, dated January 3,
?.
B. Article S~1CI of the AGREEIvIENT provides :that the AGREEMENT nay be amended by
written arr~endmenx to the AGREEIYIENT as agreed to by tIWNEIt anal BNGII~TEER.
C. OPINER and.ENGINEFR desire. to amend the AGREEIvIENT.
Now., Therefore, the parties agree to the following; modzfications:
1
See A:ttacltrnerit~ A ~ B.
A11-other teixns and c`ondxti~ of the vriginai agreement Brill remain in full farce and effect.
IN WIThT~SS WHEItEtIF, ~e parties execute belnc~r:
Far CH2M HILL; Tnc.
clateel this ~ dad of ~/~ _ ~ ,
Name
Far Citeof Meridian
elated. this `~ ~ da~r of
Bar: G~~~
Taminy d ' eerd, Ma r
Attest:
3a rsee' ~ man, Cit3r Clerk
Approved By City Council:
/t7 ~-- t ~/- C~
Title
/( , 2(1fl8.
~\\```,~i111161 t11UJ~~r~'''a,
c3' `~ ~~
9~'` ~Q4~ ® `~
'''r~~,,,,,..~ 1,11,,~~
1
w
i
t +
~ € a .
t
~ ~a }
}
i§
1 1
1 e~i
f
ds `~
1 I
tF
r ;
6 ~
'
~ ~
~ I't
g
g ~ 2 fl
.:'„D
~A~ta~ch~n~ent
~cc~pe ~~ ~ervic~~
P~®ject Und~r~t~ndin
The City is pl~uing for a lift station near the interseMion of Amity and Lindy Roads to
service the south. l~~eridian area, including the Bitter Creek development: The-use of this'
facility will be to convey flaws through nei~u pipelines to a new gravity system ort Ten IvTi1e
Road just south of the I-8~ freeway. Approxiir~ately 2.25 -miles of new dual force mair- and
t?.5 miles of gravity main va~ill be irtclurled ir- this project to convey ~r?astewater flows.
CI'~21Ul;HILL leas been asked to revise flte design of the $itterereelc Lid station and Pipelix~es
project to accoxnmodai€ a.~~ l~r subdvisio~ e~iandable tc~ 3,.fJ~~ Iota, In add'tion, the s~esrti
of a l2 and x6-irtc3~ ~vaterliaae ~(approate~y 2.75 rniles~ 7-.as been added to the project.
Ferrnits from. ll~l:Q Ada Courxty (~~'}, .SCI 3tD, axd LT$C~3E «1i Have to be--obt~nerl.:
C~~' t~$
CHI HII.I. will per#orrn ta~s assoeted with the design cif the fitter Greek Life S~.d.Q
force sztains, gravity riaain; and. potable water- l~iai~5 as outlined belox~v:
'~~~ ~ -f~roje~~ ~l~r~~g
9.1 Staff I~ar~ant end T~k rdinati
I'raject:manage~erut wi11 cost of ~tnpervisng pr.~ojec~t staff; holcli~ag eonsulta~nt sfia
coordi~tior meetings as re-quiaed; docunaent~in.g rrt~eting decisit~rts and action %tems, and
assigning acflv%ties to team;~errrbers.
1:2 ~a3nitar ~roj~ct Prc~gr.
lvlonitc~r project progress, including-work completed, work remaining; bxzdget expended,
schedule, estirxtated cost of work rernan~t-cg; anct estimated. cost at cou~pletion. lvlonitor
projec-t activities for poter{tial.,~haizges, anticipate oianges ~nrhen possible; ar-d with. C%ty
approval, modify project tasks, budgets, and appxoach..
#.~ lnvd~es
Prepare encl. submit a monthly billing lwith backup docaxmentation, per the agree~e~-it.
Prepare invoices for services performed on a monthly basis, including a summary of work
completed and ~7ork to be completed for the eomir~g nzontlt.
1.4 Pr~J~ct Qual6ly Cexnlrol
Perforn-- project quality control reviews of deliverables on this project. Seniox technologists
will be involved. in the work tasks from the start and perform quality control reviews:
b
1.5 i7pinion of Probable Costs
Opinions of probable construction cost will be prepared. for the final design. Capital costs
include construction costs, associated engineering and construction services costs, legal and
adrniTUStrative cost, sales tax, and appropriate contingency.
1.fi Schedule Evaluation
An ~valuatorr of the project schedule will. include design, bid-.and award, and construction
schedules. CH2M HILL will elevelop a project schedule for the pre-construction meeting. An
electronic~pdf version of the schedule will be transmitted to the City.
~+~S~C ~-~~5l~l
CH21VS HILT, w%11 finalise the design for the Bitter Creek Lift Station acrd Pipelines Project:
Task ~ includes additicanal time and budget necessary fo finalize the design and perinitt~ng
phases ~dd.tional tiane'and budget. is riecessaty rr part to additional effort necessary for the
following task:
• r4dd tiat~al effort vva~ necessary tci cc~cnp]ete the ~3~~3 requrem~n for the 16-inch::
watezlix~e design, which ine-ucled-a full:Eng~ne:ering FZepor# to cri~ure the prt~posecl
opera~onal scexLario of the waterline {includixg booster stafions designed by ethers) was
c~orisistet with the current P~Iaster I'Ian:;
T~~sk 3---~a~~lifi~t~ E~r~~~ ~~ ~s
CI-f2~v1.HTLI. will pre~ax~ Legal Descriptions to faciiltate:easern~nt agreements for the ~:
inch. waterline.. Easements tih be obtained fcrr the IZa~vsaz, Callcir~s; and ]anaisor~ Laterals
and ~a be parallel to the. easements that were previously negotiated far the sewer force
nzairi alignment: In addition, --C~2.l~'I HILL will assist the C of I~~Ierdiar~ to procure tl:e
easenze-rats by contacting ~e land owners and recording the final easenxerit It is assumed. the
City cif lVleridian will ~ara~ide a template for the easeinertt agreements-:
~'~sk ~--~~r-ri~c~s [~ur~~tg C+ot~s~rrt~~ti~~t
CH2lVI HILL will provide services during constr~zction consisting of.
® One pre-construction meeting with o~~ner, contractor, regulatory agencies, and local
business owners.
Assist in the review of tecl'rr-ical submittals fr~sm the Contractor. The budget assumes
that we will assist in the review of ~ technical submittals with no more than 2 iterations
per submittal.
e Assist in the response to Rec}uests for Information {I~'Ij from the Contractor and
develop change orders if necessary Our scope of work .and budget assume the
Contractor v,~ill construct the prt~ject in conformance with the design drawings such that
significant re-design will not be required. ~ he budget assumes that we will assist iri the
review of 5 RFI's.
a The City of Meridian will have an authorized representative (City Inspector) on-site for
regular construction inspection. CH2IvI HILL will supplement on-site inspection for four
hours per day as deemed necessary by the City Inspector. Tlie budget assumes 12 four-
hour days for CH2M HILL. ~'~.dditional tune, if requested by the City Inspector, must be
covered in an amendment to this task order. T'he.presence or duties of Engineer or
owner personnel at a construction site, tA:~hether as onsite representati~Tes or otherE~vise,
do not make Engineer or C3wner personnel in any way responsible'for these duties that
belong to the construction contractor or other enfities, .and do not relie~re the
construetiori contractor ur any other entity of their obligatioi-~s, duties; and.
responsibilities, including, but not limited to; alT construction nneehods; n~.eans,
techniques, sequences, and procedures necessary for coordinating and. completing ail
portions of the construction Nark in accordance with the construction Contract
Documents and. any Y-eaith or safety precautions required by such construction ~rork.
Prepare a~-builts based solely or< information proirided by-the Contractor and City
Inspector. `Ihe proposed bvd.~get assumes 2 hours per drawing for drafting. the record
drawings:
~<
~#
~,
k
t, ~~
~ S !
a ; ~
M ti
~i
° ii
~; n
~
t~
~
i
~ , % ti
a,
~
~ ~
~
~~ `~
i i _ ~
i?
~j
'
j t
1 ~ '. I
A ~
~~ ~n
~t~er~s~i~n
L~~re! crf Effort
T'he task level. of effex~ estimates axe suxnxrtaxizeel in the following table. CHZNI HILL
developed tYis level of effort estimate based on the wrack plan presented herein axed
assumptions stated previously. The fees will be billed on a time and materials basis, and i~vill
x~of exceed the total axx-tiunt below without priax approval from the City.
Level ~f Effort
Tas4c [}es~ription Total Task
'i Project Management ~2.Of0
2 C?esign $9~!6;4UQ
3 Facilitate Easement Agreemen#s $3y5t?0
•4 Seruiaes Daring;~~nstnuction $~150(~
Summary - All Tasks 3,nCt~
,:
~.
~,:
E .,