HomeMy WebLinkAboutChange Order No. 9 with Brown Construction, Inc. for North Black Cat Trunk SewerCHANGE ORDER 9 PROJECT: North Black Cat Trunk Sewer DATE OF ISSUANCE: 4/29/08 EFFECTIVE DATE: OWNER: Primeland Development Co. LLP CONTRACTOR: Brown Construction, Inc. ENGINEER: JUB Engineers Page 1 of 3 You are directed to make the following changes in the Contract Documents. Attachments: Work Change Directive No. 1 and Brown Const. Calculation breakdown CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIlVIES: Original Contract Price Original Contract Times $ 1.717.487.31 Substantial Completion: 16R Davs -May 1.2008 1 s 213 D J 2008 R f Fi l P d une ayment: avs - . or na ea y days or dates Net Changes from previous Change Orders No. 1 to No. 8 Net Changes from previous Change Orders No. 1 to No. 8 $ 58 221 00 36.s . . may, Contract Price prior to this Change Order Contract Times prior to this Change order Substantial Completion: 168.s Days -May 1.2008 1 775 708 31 Ready for Final Payment: _ 213.s Davs -tune ls. 2008 . . . days or dates Net Increase (decrease of this Change Order) Net Increase (decrease of this Change Order) $ 22 00 885 ~ . . aay. Contract Price with all approved Change Orders Contract Times with all approved Change Orders Substantial Completion: Davs - 206.s Mav 3 $ 1.79$.593.31 Ready for final payment: Davs - 2s l .s July~~8 days or dates RECOMMENDED BY OWNER: ACCEPTED BY CO CTOR: B . By: Date: 4/29/08 APPROVED BY OWNER: Date: S'$ ~ 0~ Date: 4/29/08 ammy eerd, Mayor Date: ~~. ~ D~l Approved by City Council: 'r1~ ~~ ~8 N,1,~ ~1HltNttN~~ i r, ,\ ~ ' AIIGJI• i ~~~~"`"''1~~~~~~`~~~`~~~~...nl~~l~~l , city ~bAL 5~y~a, HoJ~n~ , ~ .'~ Date• ~ ~~` P ,A CITY OF MERIDIAN IJORTH SLACK CAT TRUNK SEWER ADA COUNTY, IDAHO WORK CHANGE DIRECTIVE No. 001 DATE OF ISSUANCE 03/24/08 EFFECTIVE DATE 03/24/08 OWNER City of Meridian CONTRACTOR Brown Construction Contract: Project: North Black Cat Trunk Sewer OWNER'S Contract No. ENGINEER'S Project No. 10-05-026 You are directed to proceed promptly with the following change(s): Description: A 60" Type "B" "Through" manhole shall be added at Station 156 + 67.59. Critical elevations shall be as follows: Rim = 2543.02, 21" IE In = 21" IE out = 2519.58, Northing = 726837.96, Fasting = 2438910.78. Purpose of Work Change Directive: To minimize amount of 20" C905 piping to be installed due to nearby well. Attachments: (List documents supporting change) If OWNER or CONTRACTOR believe that the above change has affected Contract Price any Claim for a Change Order based thereon will involve one or more of the following methods as defined in the Contract Documents. Method of determining change in Contract Price: ^ Unit Prices ^ Lump Sum L/ o~ ^ Cost of the Work ~T ~.3 Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract $ Times: If the change involves an increase, the estimated Substantial Completion: days; amount is not to be exceeded without further Ready for final payment: days. authorization. RECOMMENDED: AUTHORIZED: ENGINEER OWNER EJCDC No. 1910-8-F (1996 Edition) Prepared by the Engineers Joint Coimact Documents Corrardttee and endorsed by The Associated General Contractors of America and the Cot-strucrion Speci6cauons Insbtuu. Brown COP15Ili~Ciion, InC. 5881 Bennett ttoad Nampa, tD 83686 bete: (206) 465rt?274 Fax: (Z08) d6S 3532 Printeland Development 3120 W. SelEtawoer Drive Suite 100 Mer~lan ID 83846 Attn: Glenn FitYJ1 PAY REQ{1f~STiIS: REM: IMPORTED TRENCH BACKRII Qnr, azoi cY ~~ ~N. UNI=AR FEETQI=SEWERTRENCH=1730if AIIEaAGE OEP7H OF SEWER TREN#17 22.0 FT SUBTRACT 3 FT = t~PE ZONE {PIPE Af~fp BEDDING) SU87R,4tT3 FT= ROA~Q 840.SE (PIT RUN SECTtt3N, 3:" ROAD MfX, ASPHALT ~ TQ7A1-16 Fi AVERAGE DEPTH OF IMPOR7EDTRFpICK BACKt=1i,t (16.0 FI' x 8 F[ titNOE Y 1730 tF}r 27 = B,2Di t;.1f TgT~~ IiNPO,~tTi~ TR1I:JIICII BACKFt,~;l,; PAY fiEQUtrST !f5 a $2dS tY .~., , • ~ .. ,.....-, .a. , ,.,,