Memo
To: Will Berg; Tara Green
From: Brent A. Blake, Engineering Technician
blakebQmeridiancity.org
Meridian Public Works Department
660 E. Watertower, Suite 200
Phone: 898-5500
Fax: 896-9551
CC: Len Grady, P.E., City Engineer
Clint Dolsby, P.E., Staff Engineer
Dam 12/06/2007
Ree Proposed Agenda Item for December 11, 2007 City Councl Meeting
The Public Works Department respectfully requests the following item be placed on the
December 11, 2007 Cily Council agenda, under Consent Agenda, for Council's
consideration:
Meridian Road and Main Street SDlit Corridor- Phase 1 Utility Improvements (Design)
Attached is a Task Order/Agreement with Civil Survey Consultants, Inc. for the design of
utility improvements in conjunction with ACHD project No. 506040. The not to exceed amount
of this task order is $30,470.00.
Recommended Council Action: The Public Works Department recommends
that City Council approves the Task Order/Agreement with Civil Survey
consuRants, Inc. for the design of sewer and water improvements to be
constructed in conjunction with ACHD project No. 506040 and authorizes the
Mayor to sign it.
Thank you for your consideration. Please contact me if you have any questions.
• Page 1
TASK ORDER N0.0669
CITY OF MERIDIAN (OWNER)
AND
CIVIL SURVEY CONSULTANTS INC. (ENGINEER)
This Task Order is issued by Owner and accepted by the Engineer pursuant to
the mutual promises, covenants and conditions contained in the Agreement
between the above named parties dated November 8, 2006.
CITY OF MERIDIAN
MERIDIAN ROAD AND MAIN STREET SPLIT CORRIDOR -PHASE 1
UTILITY IMPROVEMENTS
PURPOSE
The Engineer's scope of services, time of completion and compensation shall be as set
forth herein. Services shall generally be described as Engineering ConsuRing Services.
TASK 0669 -Design and Construction
Per the City's request, the Engineer will provide professional engineering services
related to the design of new water and sewer improvements to be constructed in
conjunction with ACHD Project No. 506040
The engineer proposes to provide the following under this scope of services:
A. Water System Improvements:
1. Adjust approximately 10 existing valves.
2. Adjust or relocate approximately 4 existing water meters.
3. Adjust water mains and water services where conflicts exist with new storm
drain or irrigation pipes.
4. Abandon existing main and install new main in Waltman Lane and Meridian
Road and Main Street Intersection as required by roadway improvements.
5. Install approximately 150 LF of new main in Corporate Drive.
6. Provide service as requested to parcels not curcently on city water.
B. Sewer System Improvements:
1. Install approximately 1200 LF of new 8"0 main in Main Street.
2. Provide service as requested to parcels not currently on city sewer.
We will send a letter to each property owner with ground adjacent to the project that is
not currently served by city services. The letter will advise them of the project, advise
them the City will install a service stub to their property at their request, and advise them
of the estimated costs that will be charged to them upon connection to the stub. The
letter will also outline any permanent and temporary easement requirements to construct
the proposed improvements and will include a sample easement form. A copy of the
letter will be sent to you for approval of the content and wording prior to being issued.
The City will provide us with a mailing list for all property owners within the project limits.
We will contact property owners with an existing structure and obtain the information
necessary to design the sewer main to service their existing structure. Again, we will
outline any permanent and temporary easement requirements to construct the proposed
improvements and will include a sample easement form.
We will assume that this project is for the benefit of the property owner and as such the
necessary easements will be granted for no cost. We will use easements granted to
ACHD to the extent possible for the utility work. If a property owner requests payment
for an easement we will forward that request to the City for approval. Should a property
owner refuse to grant any easement we will design the service to end one foot short of
the right-of-way line so that the service does not extend outside the roadway prism.
Plans will be prepared once the City has provided our office with electronic files of the
final design submittal to ACHD. We request the City obtain permission from ACHD to
use the electronic files for utility design purposes. We also suggest that the City ask
ACHD to include utility service extensions in any easements obtained by ACHD for the
project.
We will submit the plans to ACHD and QLPE for review and approval prior to
construction. We will also mail a copy of the completed plan sheets to each property
owner affected by the sheet, along with any required easement forms for execution. We
will provide the completed and recorded easement forms to the City prior to construction
along with a written listing of any property owners that refused to grant an easement.
Should a property owner refuse to grant an easement the service will end one foot
short of the property line and a note placed on the plans restricting the contractors
operation to public right-of-way only.
It will be the City's responsibility to negotiate and execute the Joint Effort Agreement for
construction with ACHD.
We propose to provide 40-scale plans on 22"x34" sheets to match ACHD's plans. We
anticipate that the plan set will include a cover sheet, general note sheet, 7 plan and
profile sheets, and two city standard detail sheets. The total set is anticipated to include
11 sheets. Record drawings will also be prepared as per the City of Meridian
Acceptance of Record/Electronic Drawings requirements dated February 7, 2007.
TIME OF COMPLETION
Engineering services will be completed as needed to construct improvements in
conjunction with ACHD Project No. 506040.
COMPENSATION
The Not-To-Exceed amount for this Task Order No. 0669 is Thirty Thousand Four
Hundred Seventy dollars ($30,470.00). The hourly rate for services and direct expenses
is per the previously approved Prevailing Fee Schedule Effective October 1, 2006, and
by this reference made a part hereof. Construction services are not covered under this
Task Order.
CITY OF MERIDIAN
BY: ~~~~
TAMMY de ERD,
MAYOR
Attest: L
~~/-~
WILLIAM G. BERG, J .,
Approved by City Council:
ENGINEER
BY:~/
IMOT Y A. BURG S,
VICE PRESIDENT
,.~~~ Of P.~;;?r.
~~G~-4 ~:ae;.:~~
r`~ .,
e,
ITY CLE
~;, ,.
r
,~
(Date)