Loading...
HomeMy WebLinkAboutChange Order No. 1 with MR Miller for Phase 4 Plaza and Site Improvement New City HallCITY OF MERIDIAN 33 EAST IDAHO MERIDIAN, ID 83642 CONTRACT CHANGE ORDER CHANGE ORDER NO. 01 PROJECT NO. CH-06-001 DATE: 8/11 /08 EFFECTIVE DATE: CONTRACTOR: MR Miller, Inc. PROJECT: MERIDIAN CITY HALL -Phase 4 Plaza & Site Improvement The Contractor is hereby directed to make the following changes from the Contract Documents and Plans. Description: Incorporate revisions per ASI 88, RFI#110, 8 Drain Valves for Pools & Stream Feature ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME. Reason for Change Order: Additional scope or revisions per Ilsted ASI, RFI, 8~ Drain Valves Attachments: Change order items description, dated 7/23/08, with contractor quotes CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price $216,775.00 Original Contract Times: Substantial Completion 8/28/08 Net changes form previous Change Orders Net changes form previous Change Orders No. 0 to 0 No._ to _ (calendar days) $0.00 None Contract Price Prior to this Change Order: Contract Times prior to this Change Order: (calendar days or date) $216,775.00 8/28/2008 Net Increase (deareas~) of this Change Order: Net Increase (decrease) of this Change Order: (calendar days or date) $23,015.00 None Contract Price with all Approved Change Orders: Contract Times with all Approved Change Orders: (calendar days) $239,790.00 ubstantial Completion 8/28/2008 RECOMMENDED: (CONSTRUCTION ACCEPTED: (CONTRALTO Petra Inc. p '° MR Miller, Inc. By: Thomas R. Coughlin ~ By: Michael R. Miller Date: ~ ~ ~~ Date: ~ f ~~ APPROVED: (CITY PURCHASING AGENT) COUNCIL APPROVAL By: Kefth Watts Date: Date: APPROVED: (CITY) - ATTEST: By: Mayor Tammy de Weerd By: City Clerk, Jaycee Holman Date: Date: J CHANGE ORDER No. 00001 323-4500 BOISE, IDAHO RCE-1875 C~AAT- COIVTRACT~RS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 TITLE: ASI & RFI Pricing- Phase IV PR07ECT: Meridian City Hall TO: Attn: Michael R. Miller MR Miller, Inc. P.O. Box 5423 2661 Federal Way Boise, ID 83705 Phone: 208-344-1387 Fax: 208-344-3329 RE: To: DESCRIPTION OF CHANGE **All taxes are included in costs** DATE: 7/23/2008 70B: 060675 CONTRACT NO: 49 From: Number: Item Description 00001 ASI#88 Modification to Water Feature Equipment (COR#01)- Revise water feature equipment and layout per ASI#88 & Bulletin #22 from Petra Inc., dated 4/30/08. MR Miller quote dated 5/19/08 00002 Drain Valves for Pools & Stream Feature (COR#02)- Add 6" gate valves to the existing 6" drain lines. Valve box to be 30" CMP with grade rings and 24" diameter cast iron flush mount lid in the pavers or sidewalk as directed by the CM. MR Miller quote 7/9/08 00003 RFI#110 Retum Line Layout & Flow Rates Tax Tax Net Quantity Units Unit Price Rate Amount Amount 1.000 LS $16,910.00 0.00% $0.00 $16,910.00 1.000 LS $6,105.00 0.00% $0.00 $6,105.00 1.000 LS $0.00 0.00% $0.00 $0.00 ~~~~C~~ nor AUG 2 p008 IU Unit Cost: $23,015.00 Unit Tax: $0.00 Lump Sum: $0.00 Lump Tax: $0.00 0.0% GC markup: _ $0.00 Total: $23,015.00 The Original Contract Sum was ................................................................................................. $216,775.00 Net Change by Previously Authorized Requests and Changes ................................................ $0.00 The Contract Sum Prior to This Change Order was ...................................................... $216,775.00 The Contract Sum Will be Increased ................................................................................... $23,015.00 The New Contract Sum Including This Change Order ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, $239,790.00 The Contract Time Will Not Be Changed ................................................................................. The Date of Substantial Completion as of this Change Order Therefore is .,~ ........................... ACCEPTED: B R MiUe~ Petra Incorporated sy: 1/CA Arctgitects, P sy: ~~ '~ Michae~~ G .Tom Coughli>~ ~ Steve Christensen Date: ~~cov8 ~ Date: 7,~g ~ Date: ~ ~~ ~ U 7/2 ~ Expedition MERIDIAN CITY HALL PROJECT NO: CH-06-001 MR MILLER, INC -Phase 4 CHANGE ORDER NO 1 07/23/08 CHANGE ORDER ITEMS 1 ASI 88 Modification to Water Feature Equipment (COR#01) 16,910.00 Revise water feature equipment and layout per ASI-88 & Bulletin #22 from Petra Inc, dated 4/30/08. MR Miller quote dated 5/19/08 2 -- Drain Valves for Pools & Stream Feature (COR#2) 6,105.00 Add 6"gate valves to the existing 6" drain lines Valve box to be 30" CMP with grade rings and 24" diameter cast iron flush mount lid in the pavers or sidewalk as directed by the CM. MR Miller quote 7/9/08 3 RFI 110 Retum Line Layout & Flow Rates 0.00 23,015.00 Page 1 of 1