HomeMy WebLinkAboutMemo from Public WorksE IDIAN~---
C:~: ~~~ ~~r ~4.
August 22, 2008
Hightower LLC
8312 W Northview Ste 120
Boise Id 83704
RE: HIGHTOWER
Sewer 8~ Water Construction -Final Acceptance
Dear Sirs:
MayorTammy de Weerd
City Council Members:
Keith Bird
Joe Borton
Charles Rountree
David Zaremba
Installation of this project's sanitary sewer and/or domestic water systems has been
satisfactorily completed in accordance with the approved plans. These systems have passed
the required tests, in accordance with City of Meridian Standard Specifications and Drawings,
and are hereby accepted by the City for ownership and maintenance.
Record drawings submitted to us for this project are also accepted and are being forwarded to
the Idaho Department of Environmental Quality. The engineer of record is responsible for
certification of the record drawings as to horizontal and vertical location of all public water and
sewer facilities installed.
In accordance with City of Meridian Standard Spec cations and Drawings, the installation and
materials of the sewer and domestic water systems are to be warranted against defect by the
contractor for a period of one year from the date of this letter
Sincerely,
C~' ~ .~'
Clintnt Dolsby
Interim City Engineer
cc. City Clerk, Water Division, Wastewater Division, File
Land Group
DEQ
Public Works Department .660 E. Watertower Street, Suite 200, Meridian, 1D 83642
Phone 208-898-5500 . Fax 208-898-9551 . www.meridiancity.org
Y