HomeMy WebLinkAboutTask Order No. 2.7 with CH2M HILL for CEPT and Centrate Drain RevisionsTASK ORDER N0.2.7 UNDER THE MASTER AGREEMENT FOR PROFESSIONAL SERVICES ~ ~ y~./ ~I ~I~ CITY OF MERIDIAN AND CH2M HII.L, INC. This Task order is entered into by and between City of MERIDIAN (OWNER) and CH2M HII L, Inc. (ENGINEER), according to the terms and conditions of the Master Agreement (AGREEMENT) for Professional Services, dated January 1, 2t~7. See Attachments A and B for the Scope and Fee for Task 2.7 All other terms and conditions of the original agreement will remain in full force and effect. IN WITNESS WHEREOF, the pasties execute below: For CH2M HILL, Inc. dated y of By Name For City of Meridian dated this a3taf_= y: ~~ ~~G1~ ~ ~`ammy eerd, Mayor Jaycee Hol{~an City Approved By City Council: i'~'~ Title 2008. ,, ~ ~~, . ~o SISAL ~ ~' !~!lryil M It11N~~~ Task Order 2.7 Attachment A Chemically Enhanced Primary Treatment (CEPT) Chemical Feed and Centrate Drain Revisions Project Understanding Based on the meeting held on August ?2, 2Q08, CH2M HILL is to provide a technical memorandum outlining the path forward for chemical feed to support the CEPT process. In addition, the centrate drain bypass is not working properly and needs redesign for it to properly drain. Scope of Work CHZM HILL will perform the three tasks as outlined below. SCADA programming is not part of this contract. Task 1 Prepare the CEPT Chemical Feed Technical Memorandum The technical memorandum will recap the ferric chloride test results. Two chemical feed options will be analyzed: • Use Aluminum Sulfate (alum) for CEPT, with Femc Chloride for H2S control in the digesters • Use Aluminum Sulfate for CEPT, with Ferric Chloride for H2S control in the digesters, and a nonvnal dosage of Ferric Chloride in the headworks for H2S control Both options will jointly use alum for filter coagulation. The advantages and disadvantages of each option will be discussed. These include: • Costs, capital and Operations and Maintenance (08rM), • ability to control odors, • safety of handling and storage, • ability to remove phosphorus and control struvite. Recommendationswill bemade regarding pilot testing requirements, chemical dosage points, and benefits expected from each chemical feed option. Once reviewed and approved by the City, this memorandum should be submitted to IDEQ for approval. Task 2 Centrate Drain Revisions CH2M HILL will verify field elevations of the existing centrate drain and bypass system, and a hydraulic profile will be developed. A determination will be made if the drain system can be drained by gravity, or if a pumped system is required. Improvements will be designed, and the design will consist of 1 to 2 sheets in order to obtain a quote from a contractor on site. Task 3-Project Management Project management will consist of: • Supervising project staff, • holding consultant staff coordination meetings as required, • documenting meeting decisions and action items, • assigning activities to team members, • monitoring project progress, including work completed, work remaining, budget expended, schedule, estimated cost of work remaining, and estimated cost at completion, • monitoring project activities for potential changes, anticipating changes when possible, and with Owner approval, modifying project tasks, budgets, and approach, • preparing and submitting a monthly billing with backup documentation, • performing project quality control reviews of deliverables on this project. Attachment B Compensation Level of Effort The task level of ef#ort estimates aze summarized in the following table. CH2M HILL has developed this level of effort estimate based on the work plan presented herein and assumptions stated previously. The fees will be billed as time and material, and will not exceed the total amount below without prior approval by the City. Level of Effort Task Description Total Taak 1 Chemical Feed memorandum $6,065 2 Centrate l?rain Revisions $2,184 3 Protect Management $7,937 Summary -All Tasks $16,186 All work will be completed and costs will be billed in accordance with the Master Service Agreement dated January 1, 2007. Schedule Task One and Two can be completed in parallel and within 2 weeks of the notice to proceed. CH2M HILL is prepazed to proceed without a signed contract if written authorization (letter ore-mail) to proceed is received.