Loading...
HomeMy WebLinkAboutMemo from PlanningItem 9 -Modification to Development Agreement: Southridge Subdivision Location: South side of Overland Road, between Linder and Ten Mile Applications: Modification to the approved development agreement fora 290 acre site with multiple zoning districts. History of Previous Actions: - In 2007, the subject property was granted Annexation and Zoning (AZ-06-031) approval with R-2, R-4, R-8, TN-C, L-O, and TN-R zoning districts (Ordinance #07- 1319). A Development Agreement was also approved with the annexation (Instrument No. 107074205). A Preliminary Plat (PP-06-031) was approved concurrent with the annexation for 239 lots consisting of 189 residential lots, 11 commerciaUother lots, 8 mega lots (to be developed in the future), and 31 common/open space lots. - A Property Boundary Adjustment was approved by the Planning Department on October 13, 2008 that adjusts property lines for 10 existing pazcels which will develop and/or be further subdivided in the future. - A Conditional Use Permit-(CUP-08-027) application is currently in process for the Beacon at Southridge a 187-unit assisted living facility and church on the northeast portion of the site. - A Final Plat (FP-08-017) application is currently in process for 60 building lots (53 residential units) and 11 common/other lots on 33.6 acres of land in TN-C and TN-R zoning districts. Highlights of Proposed Request: The major changes propose elimination of the mega lot concept, and associated concept plan, to replace them with a new master concept plan and Property Boundary Adjustment (PBA) plan. Rather than platting all parcels, the applicant is proposing that some of the parcels should be able to move forwazd in the building process through the property boundary adjustment process. The first parcel to move forward in the development process is an assisted living community that is going through the CUP process currently. This CUP as well as the Final Plat at the end of tonight's agenda hinge on approval of the subject DA modification. Significant Changes to Plan: The new proposed concept plan includes: 1) an assisted living facility and church where multi-family and commercial uses were previously shown (adjacent to Overland, at Southridge Drive); this area was originally planned for multi-family and single- family residential and commercial uses; 2) A 4-way street connection to Overland Road was originally shown on the plan at the southern tip of the L-O zoned property and the TN-R zoned property; now the street dead-ends in a hammerhead design and does not connect to Overland, there is an access on the outside of the radius for Overland Road; 3) The street system on the southwest portion of the site now run more pazallel (north/south) with Overland Road instead of perpendiculaz (eastlwest) as previously planned. The lazge area on the north side of Overland Road on the west side of the site shows single-family lots consistent with the previously proposed concept plan; and, 4) Previously there were 2 street connections to Overland Road west of the Amend out-pazcel in the multi-family azea; now, there is only one. NOTE: The alignment 10/14/2008 of Overland Road has changed slightly due to the topography of the site and ACHD requirements. Significant Changes to DA: In the staff report the Applicant's requested changes are noted in bold/underline and strikeout format. Staffl s recommended changes noted in red bold/underline and strikeout format. Here is a sample of some of the most significant changes: + The applicant is proposing to include approval of an access to Ten Mile Road; no access was allowed originally. Staff is not supportive of this driveway as the property is currently zoned residential. Once the applicant submits development applications for this area, staff will re- evaluate the need for an access to Ten Mile Road. But right now, the land use and zoning has not been approved that would warrant an access. + Staff is still requiring that the park, clubhouse and pool be with the platting of Phase 1 (also identified as Parcel 1 in the recently submitted PBA) but are not required to be constructed or platted with the first final plat (see also the attached/revised master site plan;. However, the park & private clubhouse & pool do need to be platted and constructed prior to platting or development on Parcels 3, 7, and 10 (as shown on the PBA). + parcels 2, 5, 8 and 9 do not require platting but will require development application approval (i.e. - CZC, DES and possibly CUP); Parcels 1, 3, 4, 6, 7, and 10 will require appropriate detailed preliminary platting/platting phases and fmal plats; and Development of all parcels must remain consistent with the adopted Ten Mile Area Specific Plan, as submitted and approved by the City. No variances to lot dimensions, setbacks or block lengths shall be requested by the applicant "as part of the re-development or platting of the parcels. + Staff is recommending a change to the timing of the perimeter landscaping requirements. + Staff is recommending that the overall density of the project include a minimum of 1,000 residential units on the property and a maximum of 1,277 , up from 1,252. Elevations: No -According to revised DA provision # 26, the applicant is proposing language that states: prior to the signature of the first final plat, the applicant shall submit and obtain Design Review approval; or submit and obtain City Council approval (or a development agreement modification) of plans that proposes specific and detailed architectural guidelines for this development and that address (at a minimum) variety in structures within a block, building mass, building materials, rooflines, colors, and architectural styles. Written Testimony since Staff Report: None. Outstanding Issue(s) for City Council: Staff is recommending two additional changes to the DA 1) That DA provision # 30 be modified to read: For access purposes to Parcel 9, a city- approved access shall be provided to Parcel 9 from/across Parcel 10 prior to building construction; and 2) That DA provision # 31 be modified to read: For access purposes to Parcel 5, acity-approved access shall be provided to Parcel 5 across Parcel 4 prior to development. The applicant may have other changes; staff does not have written comments from the applicant but we did discuss the revisions last Friday. Notes: 10/14/2008