HomeMy WebLinkAboutTask Order No. 0778 with DC Engineering for Whitestone Lift StationTASK ORDER N0.0778 CITY OF MERIDIAN (OWNER) AND DC ENGINEERING (ENGINEER) This Task Order is issued by Owner and accepted by the Engineer pursuant to the mutual promises, covenants and conditions contained in the Agreement between the above named parties dated January 1, 2006. CITY OF MERIDIAN WHITESTONE LIFT STATION UPGRADE PURPOSE The Engineer's scope of services, time of completion and compensation shall be as set forth in Attachment A. Services shall generally be described as Engineering Consulting Services. TASK 0778.01- Design and Construction Per the City's request, the Engineer will provide professional engineering services related to the design and construction of the Whitestone Lift Station Upgrade project located in the Whitestone Subdivision near the intersection of Linder Road and Franklin Road. The engineer proposes to provide the scope of services listed In Attachment A. COMPENSATION The Not-To-Exceed amount for this Task Order No. 0778 is Nine Thousand Five Hundred and 00/100 dollars ($9,500.00). CITY OF ME TAMMY de RD, MAYOR ````,`,~~~~„u ~~ ~~ ~~~~~,~,,,,,~~ y OF Attest: ~`~` d' rFo ENGINEER BY:~~ CLAY by City Council: HOLMAN, CITY RK ~' %9 r~g~. Q. _ ~3 _008 TASK ORDER N0.0778 CITY OF MERIDIAN WHITESTONE LIFT STATION UPGRADE ATTACHMENT A ~c ENG/NEE'R/NG September 3, 2008 Mr. Trace Crane City of Meridian WWTP 3401 N Ten Mile Rd Meridian, ID 83642 Sabject: Whitestone Lift Station Mr. Crane, 440 E Corporals Drive Suite 103 Meridian, Idaho 83842 Phorre: 208.288.2181 Fax: 208.288.2182 Thank you very much for the opportunity to propose on the Whitestone Station project The following is our proposed Scope of Service based on the information that you have provided to us. Project Understanding We understand that this project is a fast flack project with high priority. The project will include the design and construction changes r~ured to get the lift station beck on line using 10 hp chopper pumps. The new 10 hp chopper pumps are 3 phase pumps that will be supplied by the City of Meridian. They will require 3 phase VFD's m maximize the use of the single phase power source. The VFD's will convert the single phase power to allow the existing service to remain which will reduce the cost. DC Engineering will subcontract the installation to G~stom Electiric to fast track this project. The pmject wi71 be very sinular to the Bear Creek conversion completed in 2005. Electrical Engineering • Coordinate pump requirements and specifications with Civil Survey. • Develop conshuction documents for chopper pump installation. • Program the Radio far lift station monitoring. Assumpl3ons • VFD's and chopper pumps will be provided by the City of Meridian. • Radio will be provided by the City of Meridian with the exception of the antennae. • It should be noted that without the supply of the chopper pumps, VFD's and radio the construction cost would be in excess of $40,000. Supplying these items represents a significant savings to the subdivision. De~tverables • 100% Construction documents and installation including construction observation and record documents upon completion. Schedule • I~ Engineering has a capable staffthat can start immediately. DC Eng(neering The project including installation will be performed on time and material basis not to exceed $9,500 (Nine Thousand Five Hundred Dollars). G~stom Electric Construction cost will be passed through with no mark up, and is included in the above listed fee. Thank you again for the cpporauity to work with you. if you have any questions, or require additional information, pleas do not hesitate to ask Sincerely, Accepted by: DC ENGINEERING, P.C. clay Bingham Project Manager Printed Name Title Date DC Engineering