HomeMy WebLinkAboutTask Order No. 0773 with Pharmer Engineering, LLC for WWTP Daft RetrofitTASK ORDER N0.0773
CITY OF MERIDIAN (OWNER)
AND
PHARMER ENGINEERING, LLC (ENGINEER)
This Task Order is issued by Owner and accepted by the Engineer pursuant to
the mutual promises, covenants and conditions contained in the Master
Agreement between the above named parties dated August 26, 2008.
CITY OF MERIDIAN
WWTP DAFT RETROFIT
PURPOSE
The Engineer's scope of services, time of completion and compensation shall be as set
forth herein. Services shall generally be described as Engineering Services relating to
replacing the existing mechanical DAFT system with a replacement system similar to the
newer DAFT the City currently operates.
TASK 1 -Site Investigation and Preliminary D®sign Meetings
Per the City's request, the Engineer will provide professional engineering services
related to Site Investigation and attend Preliminary Design Meetings as outlined in
°Exhibit A" Scope of Work, Task 1. The Not-To-Exceed amount for Task 1 is Three
Thousand and 00/100 dollars ($3,000.00).
TASK 2 -Lett®r Report
Per the City's .request, the Engineer will provide professional engineering services
related to Letter Reports as outlined in "Exhibit A" Scope of Work, Task 2. The Not-To-
Exceed amount for Task 2 is One Thousand Seven Hundred Fifty and 00/100 dollars
($1,750.00).
TASK 3 -Selection and Procurement of DAFT Equipment
Per the City's request, the Engineer will provide professional engineering services
related to Selection and Procurement of DAFT Equipment as outlined in °Exhibit A"
Scope of Work, Task 3. The Not-To-Exceed amount for Task 3 is Eight Thousand Two
Hundred Fifty and 00/100 dollars ($8,250.00).
TASK 4 - Pr®paration of Installation and Improvement Drawings, Specifications
and Contract Documents
Per the City's request, the Engineer will provide professional engineering services
related to Preparation of Installation and Improvement Drawings, Specifications and
Contract Documents as outlined in "Exhibit As Scope of Work, Task 4. The Not-To-
Exceed amount for Task 4 is Twenty Four Thousand Five Hundred and 00/100 dollars
($24,500.00).
TASK 5 - Bld and Award
Per the City's request, the Engineer will provide professional engineering services
related to Bid and Award Preparation as outlined in "Exhibit A" Scope of Work, Task 5.
The Not To-Exceed amount for Task 5 is One Thousand Two Hundred and 00/100
dollars ($1,200.00).
TASK 6 - S®rvlces During Construction
Per the City's request, the Engineer will provide professional engineering services
related to Services During Construction as outlined in "Exhibit A" Scope of Work, Task 6.
The Not-To-Exceed amount for Task 6 is Four Thousand Two Hundred Fifty and 00/100
dollars ($4,250.00).
COMPENSATION
The Not-To-Exceed amount for this Task Order No. 0773 is Forty Two Thousand Nine
Hundred Fifty and 00/100 dollars ($42,950.00). The hourly rate for services and direct
expenses is per Table 1.0 (Pharmer Engineering Rate Schedule) of °Exhibit A°.
CITY OF MERIDIAN
BY:
TAIV~ Y de ERD,
MAYOR
ENGINEER
BY:
R T D. PHARMER P.E,
```~`~<<r~~urur~~,~~ PRESIDENT
Attest:
r ~ ~~~~
SEAL approved by City Council: ~' a-~8
JAYCE HOLMAN, fl RK (Date)
' y '~ O
/~~~~'rrrrrni n~n`~~~~``
TASK ORDER N0.0773
CITY OF MERIDIAN (OWNER)
AND
PHARMER ENGINEERING, LLC (ENGINEER)
"EXHIBIT A"
(Pharmer Engine®ring LLC Scop® of Work Letter Dated August 13, 2008 )
August 13, 2008
Clint Dolsby, P.E.
Interim City Engineer
City of Meridian Public Works Department
660 E. Watertower, Ste 200
Meridian, ID 83642
Re: Wastewater "Treatment Plant
Dissolved Air Flotation Thickener (DAFT) Retrofit
Scope of Work
Dear Clint:
1998 W. Judith Lane
Boise, Idaho 83705
Phone (208) 433-1900
Fax (208) 433-1901
www.pharmereng.com
We have prepared a scope of work for the mechanical and electrical retrofit of the existing 20 ft
diameter DAFT with a new similar replacement unit within the existing concrete structure and wthin the
existing building with minimal structural modifications. The DAFT referenced as part of this scope of
work is the existing EIMCO unit installed in the late 1970's. The purpose of the project is to replace the
aging and deficient existing mechanical DAFT system with a replacement system similar to the newer
DAFT the City currently operates.
We propose to work on time and materials basis with a maximum not to exceed. We will invoice on a
time and material basis per the rate schedule shown in Table 1.0.
The proposed engineering team for this project consists of Dan Barbeau as your project manager and
Carl Hipwell as your project engineer of Pharmer Engineering, with electrical, instrumentation and
controls by Clay Bingham of DC Engineering. Bob Pharmer will provide quality control.
Scope of Work:
Task 1-Site Investigation and Preliminary Design Meeting
Pharmer will inspect the existing DAFT system and measure and record pertinent design information
necessary to prepare design and bidding documents for replacement of the existing DAFT system and
miscellaneous improvements to the drainage valves.
Pharmer will coordinate and facilitate a design meeting between the City and the Engineering team to
discuss alternatives for retrofitting the existing unit.
The City shall prepare the DAFT for inspection by the Engineering team by dewatering the existing unit
and providing access to the facility. The City will participate in the design meeting with the engineers in
discussion of design and implementation alternatives.
Estimated PE labor costs $2,200
Electrtcal Engineering $700
Estimated direct expenses $100
Total estimated cost $3,000
Task 2 -Letter Report
Pharmer will prepare a basic letter report to serve as the preliminary engineering report as required for
any improvements by IDEA prior to implementation. The letter report will be submitted to IDEA for
review and approval. The report will include an explanation of the project and related engineering
design information necessary for IDEA to accept compliance with State regulations.
Estimated PE labor costs $1,500
Electrical Engineering $p
Estimated direct expenses $250
Total estimated cost $1,750
Task 3 -Selection and Procurement of DAFT Eautpment
Pharmer will prepare preliminary (30%) design drawings and a procurement document for the DAFT
equipment. The procurement documents will be EJCDC based standard documents and will be
submitted to IDEQ for review and approval.
Pharmer will assist the City in advertising of the procurement package and answer all questions as may
arise during the procurement period. The engineering team will review the proposals from the
respondents to the procurement and recommend award to the City. The procurement package will
require the selected vendor to supply full shop drawings for the project, which will be reviewed for
compliance with the project requirements and procurement specifications by Pharmer.
Estimated PE labor costs $7,000
Electripl Engineerin $750
Estimated direct expenses $500
Total estimated cost $8,250
Task 4- Preparation of Installation and Improvement Drawinss Specifications and Contract Documents
Pharmer will prepare final installation and improvement drawings, specifications and contract
documents for replacement of the existing DAFT mechanical and electrical equipment as necessary to
retrofit the selected vendor in Task 2 into the existing system. The package will include minor structural
modifications as necessary. The package will include replacement of the two valves south of the DAFT
and one or more of the valves to the east of the DAFT..The package will be sent to IDEQ for review and
approval.
Estimated PE labor costs $20,000
Electrical Engineerin $4,000
Estimated direct expenses $500
Total estimated cost $24,500
Task 5 -Bid and Award
The engineering team will assist the City with bid and award for the installation of the DAFT retrofit and
miscellaneous associated improvements. The team will answer bidding questions, issue addendum and
hold apre-bid meeting at the site.
Estimated PE labor costs $500
Electrical Engineering $500
Estimated direct expenses $200
Total estimated cost $1,200
Task 6 -Services Durine Construction
Pharmer will perForm services during construction such as answering requests for information and
general contractor questions and completing shop drawings and O&M manuals for the improvement.
Estimated PE labor costs $3,500
Electrical Engineering $500
Estimated direct expenses $250
Total estimated cost $4,250
Total Estimated Costs not to Exceed S 43 000
Table 1.0 -Pharmer Engineering Rate Schedule
.Classification Hourly Rate. ~ Em o ee,
Ise Y
Engineer IV
.
$147 00 ;
' x ,~ =~ .:.
Bob .
Engineer V $137.00
4_ .
li<rad
Engineer IV $122.00 ~ ~ Dan,Carl ~.
Engineer 111 $105 p(>, Ti~setsa'
,
Engineer II $95.00 ' Jesse
.Engineer) X85:00 ` Jordi, Jeremy, josh, Kristopher
Technician IV $85.00 Jim
Technidan III $74.OQ ;' Todd,'Ray; Justin
Resident Project Representative $80
00 r
. Je
ry
AdministrationAssistance = $60.Q0 . ,: visa,-Linda
Pharmer Engineering does not bill for phone calls, computer usage or similar. Direct expenses consist of
copy charges and mileage and will be included in invoicing.
The proposed schedule for this project is as follows:
Task 1-Complete by September 19a', 2008
Task 2 -Letter report submitted to IDEA by August 29a', 2008
Task 3 - Draft Procurement Documents by October l0a', 2008
Task 4 -Draft Installation and Improvement package by October 31~; 2008
Task 5 -Bid and Award in November 2008
Task 6 -Construction Duration
Sincerely, CITY OF MERIDIAN
Robert D. Pharmer P.E.
Pharmer Engineering, LLC
Tammy de Weerd, Mayor
Dateā¢
Attest:
Jaycee Holman, City Clerk
Date:
Approved by City Council: