Loading...
HomeMy WebLinkAboutFairview Lakes CUP 03-014April 28, 2003 CUP 03-014 MERIDIAN PLANNING 8~ ZONING MEETING May 1,2003 APPLICANT Fairview Lakes, LLC ITEM NO. ~ Q REQUEST Public Hearing -Request for a Conditional Use Permit for a reduction of approved 192 unit apartment to 96 units and to allow3r566'Square Toot office park for Fairview Lakes -- 824 East Fairview Avenue ,/ ~ AGENCY ~ ~ COMMENTS CITY CLERK: CITY ENGINEER: CITY PLANNING DIRECTOR: CITY ATTORNEY CITY POLICE DEPT: CITY FIRE DEPT: CITY BUILDING DEPT: CITY WATER DEPT: CITY SEWER DEPT: CITY PARKS DEPT: MERIDIAN SCHOOL DISTRICT: SANITARY SERVICES: ADA COUNTY HIGHWAY DISTRICT: CENTRAL DISTRICT HEALTH: NAMPA MERIDIAN IRRIGATION: SETTLERS' IRRIGATION: IDAHO POWER: See attached Staff Comments See attached Comments See attached Comments INTERMOUNTAIN GAS: OTHER: See attached davit of Contacted: M"~~ ~V1/iyl.P/I'l.Gt ~ 1"~J~'17Ua~ ~ ~C' Lf~ Phone: 3 ~ 3 presented at p~bllc meeFings shall become property of the City of Meridian. RPR-25-200312:08P FROP1:Sanitary Sertrices~ 1 208-688-5052 MAYO Rohm D. C ie CITY COUNCIL MEMBERS Tummy IleWeerd Willi¢m 4 M. Nary ,•a~~" ) r: ., . -)~ eri~ran ~,, •~~ I11.\HCI ~• ~~ (hem: McCanJless ~~~~yr` ' 7~~ yp„~1„;;,~vpb%''~-nxrl PIANNING AND ZOtiING Keith aird ~~ (20N) 984553] - Fax 88x•485.1 TRANSMITTALS TO AGENCIES FOR COMMENTS ON bEVELOPMENT PROJEGTS WITH THE CITY OF MERIDIAN To insure that your comments and recommendations will De considered by the Meridian Planning and Zoning Commission, please submit your comments and recommendations to Meridian City Clerk's Office Attn: Will Berg. City Clerk, Dy: Transmittal Date: March File No.: CUP 03-014 Request. •Gonditional Us units and allow gy: rarrvlew r.Btrces, Location of Properly or Protect: ZD03 Hearing Date: TO: Meridian Clerk P:2~14 LEGAL DEPARTMENT (20a) 288.2A99 • Fu 28tl-:>U1 YA RK$ & RECREATION f-'f18 saa-jsw • raa xex-ssui PUBLIC VdORKN (?081999-550 •Po. NN7•I?97 DUILDING UEPARTMFNT (:Da1887-?jl I • Fas R81-1297 a reduction of approved 192 unit apartment to ,a foot office Dark for Fairview Lakes Fairview David ZeremDa, P2 (rlo Jerry Centers, P2 (Are w Leslie Mathes, PJZ !No vl Michael Rohm, P2 (No ~ Keith Borup, P2 flJo vAr RobeA Come, Mayor Bill Nary, C/C Tammy deWeerd, C/C ICeilh Bird. C!C Cherie McCandless, C/C Water Departmeni Sewer Department ~SanitaryService (NO VAR Building Department Fire Department Police Department CHy Attorney City Engineer City Planner R~CEIVE~t APR 2 8 2^,,~3 City o1Mk p r~,e City lAR, VAC, FP) Meridian School District (NO FP) IR. VAC, FP) Mefldi80 Post Office (FPiPP oMy) ~R. VAC. FP) Ada County Highway Di5lricl AR, vAC. FP) Community Planning Assoc. y var2, FP) Central District Health Nampa Meridian brig. District Settlers IMgatlon District IdehO Power Co. (FPiPPonry) U.S. West (FP~PP Only) InlermouMaln Gas (FP~PP auy) Bureau of RaGamaUon (FPiPP only) Idaho Trensponadon Departmeni rAro FP) vAC, FP) Ada County rnnnexaoon oMy) Ada County Land Records (FPiPP very) Meridian Development Corporation Hi9torir;al Preservation Commission Your Concise Remarks: HOLD BY ~1`` `~'f`°Q~ COMMENTS: VKDL£_. ,~fi! -P4..,s .ua~D To 33 EAST IDAHO • MERIDIAN. IDAHA 83642 (20818B8•i433 • Fax (208} 881.48[3 • Crty Clerk Olticc Fax (208) 888.4218 • Human Resources Fac (208) 88x6723 RPR 25 '03 13 18 ~ 208-888-5052 PRGE.02 TRMURA RND R530C IATE Apri124, 2003 Planning & Zoning Department City of Meridian 660 E. Watertower Meridian, Idaho 83642 RE: Fairview Lakes 824 E. Fairview Avenue Meridian, Idaho To Whom It May Concern: RECEIVED APR 15 2003 Cf~Cle ~ ~ce In regards to the above referenced project, the subject property was posted on April 18, 2003. with three 4'x4' signs. One was posted at the end of Clarene Street, Teare Avenue and a double sided sign was posted on Fairview Avenue. The sign notified the public of a hearin May 1, 2003 for the Planning and Zoning Commission in regards to the reduction of the] 92 unit apartment complex to 96 units and the addition of an office park. If you information please contact me. State of Idaho } )ss. County of Ada ) On this 24'" day of April, in the year 2003, before me, a Notary Public in and for the State of Idaho, personally appeared Doug Tamura, known or identified tome to be the person whose name is subscribed to the within instrument, and acknowledged to me that he executed the same. IN WITNE55 WEIEREOF, I have hereunto set my hand and affixed my official seal the day and year in this certificate first above written. ,:. , , ,.~.3 ,.. '~~f,,~ ~~", ': ~. 336 4062 04/25/03 02:60pm P. 001 NOTARY PUBLIC for Ida o Residing at Boise, Idaho My commision expires: S - I ~ Z <:~ 3 RPR 25 '03 15~4Q 336 4062 PRGE.01 HUB OF TREASURE VALLEY MAYOR A Good Place to Live LEGAL DEPAR'T'MENT (208) 466-9272 • Fax 466-4405 Robert D. Cacrie CITY OF MERIDIAN PUBLIC WORKS CITY COUNCIL MEMBERS 33 EAST IDAHO BUILDING DEPARTMENT Tammy deWeerd (208) 898.5500 ~ Fax 887-1297 IDAHO 83642 MERIDIAN Keah Bad , (208) 858-4433 • FAX (208) 887-0813 PLANNING AND ZONING Cherie M~Caudles CiTy Clerk Office Fax (208) 888.4218 DEPARTMENT William L.M. Nary (208) 8845533 • FAX 888.6854 MEMORANDUM: Hearing Date: May 1, 2003 To: Mayor, City Council aad Planning & Zoning Commission ~T~~n T[;1T From: David McKinnon, Planner II ~ APR 2 5 2003 Bruce Freckleton, Senior Eng eenng Tech City Of Meridian Re: FAIItVIEW LADS City Clerk Office Request for Conditional Use Permit Approval to Revise a Previously Approved Conceptual Planned Developmertt for Fairview Lakes (File No.CUP-02-011), by Fairview Lakes, LLC (File No. CUP-03-014). We have reviewed the above referenced submittals and otter the following comments, as conditions of approval. These conditions shall be considered iu full, unless expressly modified or deleted by motion of the Meridian City Council: APP iCATION SU14II4IARY The applicant(s), Fairview Lakes LLC, have applied for a conditional use permit to revise the approved conceptual and detailed planned development for the recently approved Fairview Lakes project. The original approval of the project included the conceptual approval of shopping center and detailed conditional use permit for 192 apartment units on the north side of Fairview Avenue, approximately half a mile east of Meridian Road. The applicant is now requested a reduction in apartment units from 192 units to 96 units and replacing the eliminated apartments with an office park, within 4.3 acres of land ctuTently zoned R-40 and would include the parcel zoned C-N. The multi-use pathway, a clubhouse and other improvemems associated with the Jackson Drain will still be completed as part of the apartment project; however, the swimming pool has been eliminated from the apartment complex. The applicam intends on subdividing the office park in the future, and the submitted site plan is intended to provide a conceptual future layout of the office building pads. No revisions have been requested for the shopping cerrter portion of the subdivision. Because this project is being approved as a conceptual planned development only, additional detailed conditional use permits shall be required in the future, prior to construction. Planning & Zoning Commission/Mayor & City Council May 1, 2003 Page 2 CURRENT OWNERS OF RECORD Fairview Lakes, LLC are the current property owners and they have submitted an affidavit of legal interest to allow the submittal for the planned development. LOCATION The property is located on the north side of Fairview Avenue, approximately '/: a mile east of Meridian Road SURROUNDING PROPERTIES North: The Willows Subdivision, zoned R-8. South: Commercial property, zoned C-G and R-8 (a car lot). East: Settlers Village and a car wash, zoned CG and R-8. West: A mobile home park and commercial property, zoned R-8 and GG STANDARDS FOR CONDITIONAL USES The Commission and Council shall review the particular facts and circumstances of each proposed conditional use in terms of the following and may approve a conditional use permit if they shall find evidence presented at the hearing(s) is adequate to establish (11-17-3): A. That the site is large enough to accommodate the proposed use and all yards, open spaces, parking landscaping and other features as may be required by this ordinance; Staff finds that the subject property is large enough to accommodate the requested use and all other required features as noted above. A part of the submitted landscape plan is conceptual and appears to meet the requirements of the Landscape Ordinance, and the remainder of the plan is identical to the detailed planned development landscape plan previously submitted for the apartment complex. A new detailed landscaping and parking plan will be required with a new preliminary plat or conditional use permit application in the future for the office park. B. That the proposed use and development plan will be harmonious with the Meridian Comprehensive Plan and in accordance with the requirements of this Ordinance; The current Comprehensive Plan Land Use Map designates the property as "Mixed Use Community". Staff finds that the proposed reduction in residential units and the additional office uses are harmonious with and in accordance with the Comprehensive Plan. CUP-03-014 Pavvicw Lekes CUP Planning & Zoning Commission/Mayor & City Council May 1, 2003 Page 3 C. That the design, construction, operation, and maintenance will be compatible with other uses in the general neighborhood and with the existing or intended character of the general vicinity and that such use will not adversely change the essential character of the same area; Staff finds that the revisions to the proposed mixed use subdivision use will be harmonious with the intended (mixed use) and existing (mixed use) character of the area. D. That the proposed use, if it complies with all conditions of the approval imposed, will not adversely affect other property in the vicinity; Staff does not anticipate that the revised project will have an adverse impact on other properties within the vicinity; however, the Commission and Council should consider any testimony (written and oral) presented at the public hearings before making this finding. E. That the proposed use will be served adequately by essential public facilities and services such as highways, street, police, and fire protection, drainage structures, refuse disposal, water, sewer or that the person responsible for the establishment of proposed conditional use shall be able to provide adequately any such services; Staff finds that the revised development plans will be adequately served by the essential public facilities and services listed above. F. That the proposed use will not create excessive additional requirements at public cost for public facilities and services and will not be detrimental to the economic welfare of the community; Staff finds that the proposed use would not be detrimental to the economic welfare of the community, nor would it create the need for any new facilities or services to be paid for by the public that would be considered excessive. G. That the proposed use will not involve activities or processes, materials, equipment, and conditions of operation that will be detrimental to any persons, property, or general welfare by reason of excessive production of traffic, noise, smoke, fumes, glare or odors; Staff finds that there will be similar levels of traffic and noise in the general vicinity of the revised project when compared to the original project. Staff further finds that approval of the revised project will not lead to a major increase in smoke, fumes, glaze, odors or other disturbances that will be considered detrimental to the welfare of the City and the subdivision's neighbors. H. That the proposed use will have vehicular approaches to the property which shall be so designed as not to create an interference with traffic on surrounding public streets; COP-03-0i4 Fevview Lakes CUP Planning & Zoning Commission/Mayor & City Council May 1, 2003 Page 4 Staff finds that the proposed use and vehicular approaches will not create significant interference with any traffic on the surrounding public streets. Please review the ACRD report for this project for additional information regarding this finding. I. That the proposed use will not result in the destruction, loss or damage of a natural, scenic or historic feature considered to be of major importance. Staff does not find that any natural or scenic feature will be lost, damaged or destroyed by issuance of this conditional use. Existing trees greater than 4" caliper must be retained or mitigated for, if removed. CONDITIONS OF APPROVAL (Conceptual) Applicant shall meet all of the requirements of the previously approved Development Agreement, Preliminary P lat and Conditional Use Permit, unless modified below, as a condition of the revised conceptual approval for this Planned Development. 2. Revise section 4.1 on page 4 of the Development Agreement to reflect the changes requested by the applicant, including the reduction of apartment units from 192 units to 96 and up to 25 free-standing office buildings. All development shall comply with the Americans with Disabilities Act and the Fair Housing Act. 4. All signage within the development shall be subject to a planned sign program per MCC 11-14-9E. 5. This approval is only conceptual, pursuant to MCC12-6-7B, therefore, each future phase of Fairview Lakes, excepting exclusively residential phases, will require a detailed Conditional Use Permit prior to construction. 6. The landscaping plan (for the revised portion of the property) is not approved as submitted. A revised landscaping plan will be required at the time of submittal for a preliminary plat or upon submittal of a detailed conditional use permit for a future phase of the project. The revised concept development plan, Sheet SD5.0, dated 2-11-03, is approved as submitted. RECOMMENDATION Staff recommends approval of the revised conditional use permit with the aforementioned findings and conditions. cue-o3-ota aa;rvi<w cee~ cue roeePn su.$ Deputy Chief Meridian Fire Department 540 E. Fraaklm Rd Meridian, Id 83642 Apti121, 2003 RECEIVED APR 2 1 2003 TO: Meridian Planning & Zoning Conmrissron City Of Meridian City Clerk Office FROM: Joseph Silva, Deputy Fire Chief; Fire Preverttitm SUBJECT: Revised Fairview Lakes Sub CUP O1r014 following are the requite to provide minim fire protection: «,,. 8' afire-flow as required by the 1997 Uniform Fire Code Appendix IIl-A Please show all ~ r ~ .~ within 500' afthe project on the resubmitted plat t~ Y ,~ ~~k~i " " sand 1meIDal roads shall corners with a minimum of a 28' made IadmS and 48' ~~a~ 3~Tr {` a h'+ ~ J r ig~ A:• ` n~ ~' proposed buiklin~ 8c uses shalt comply with the 1997 Unifomr Fire Code. ~~~ ~~~~ ~ ~ of water' supply protection " of the wager system ~~,~~e ~~' for fire ~ eontingem upon acceptance x~, rr~= sa ~, of Meridian for wawa' quality. 5. Final approval offire hydram lowaons shall by theFire Department 6. The roadways shall be bunt to Ada Couuty Highway Standards and shall have a clear driving surface which is 20' wide. UFC 902.2.1 7 provide an approved tum around for any alreel, which exceeds 150' in length as a resuh of the phasing of the project. 8. The proposed 192 umt subdivision will have an unlmown transient population and will gave an undetazmined impact Mendmn Fite Department pall volumes. According W a report completed by Fire & Emergency Services Consulting Group in February of 2000 our requests for service are projected to reach 2800 in the year' 2005 and 3800 by the year 2010, this is up from 2069 responses in the year 2000. 9. All building use and oocuPancres will have to meet the separation requirements of the Uniform Building Code. ~,~ i, , Apri! 21, 2003 Page 2 10. The fire department requests that a°Y firinre sigoalizalion installed as the result of the development of this project be equipped with Opticom Sensors to ensure a safe and efficient response by fire and emergency medical service vehicles. This cost of this installation is to be borne by the developer Test Smoke DetectorsMomhdy CITY OF MERIDIAN PUBLIC HEARING SIGN-UP SHEET DATE May 1, 2fJf33 ITEM # 1 ~ PROJECT NUMBER CUP 03-014 PROJECT NAME Fairview Lakes NAME (PL SE PRINT) FOR AGAINST NEUTRAL r CL ~?AY CI __ --~_.- .,~q" f~~~M. Sherry R. Huber, President Susan S. Eastlake, 1st Vice President Dave Bivens, 2nd Vice President David E. Wynkoop, Commissioner John S. Franden, Commissioner April 25, 2003 RECEIVED To: Fairview Lakes, LLC 111 Auto Drive, Suite 102 APR 2 B 2003 Boise, Idaho 83709 City of Meridian Subject: Fairview Lakes/Devon Park/Devon Park #2 City Clerk Office Mixed use subdivision 824 East Fairview Avenu On April 22, 2003, the Ada County Highway District acted on your application for the above referenced project. The attached report lists site-specific requirements, conditions of approval and street improvements, which are required. If you have any questions, please feel free to contact me at 208-387-6177. Sincerely, Andrea N. Tuning Principal Development Ana st Right-of-way & Development Services Planning Division CC: Planningg~& Development project file fyof!Ft~eridiari Construction Services Drainage Utilities Ada County Highway District 318 East 37th Street Garden City ID 83714-6499 Phone (208)387-6100 FAx(208)387-6391 E-mail: _ ' Ada County Highwa Distri Y ct r[anning Review Division This application requires Commission action because of the number of vehicle trips per day that the site generates, and is scheduled to be on the consent agenda on July 10, 2002 at 6:30 pm. Tech Review for this item was held wdh the applicant on June 28, 2002. This item was revised on March 26, 2003 after the Meridian City Council approved the item on Maroh 25, 2003. Please refer to the attachment for request for reconsideration guidelines. 5taffcontact.• Andrea N. Tuning, 387-6177, atuning@achd.ada.id.us F' ile Number(s}: Fairview Lakes Apartment Complex / MAZ-02-011 / MCUP-02-014 Devon Park Subdivision/MPP 02 0 - - 34 Devon Park Subdivision #2/MPP03-006 Site address; 824 East Fairview Avenue Owner: Fairview Lakes, LLC 111 Auto Drive, Suite 102 Boise, Idaho 83709 Applicant: Hopkins Financial Services, Inc. 111 Auto Drive, Suite 105 Boise, Idaho 83709 Representative: Tamura & Associates 499 Main Street Boise, Idaho 83706 Application Information The applicant is requesting annexation, rezone, conditional use and planned unit development approval to construct amulti-family apartment complex and 35-commercial/retail/office lots. The site is located on the north side of Fairview Avenue at approximately the mid mile marker between Locust Grove Road and Meridian Road. Acreage: 9.1 acres Current Zoning: RUT Proposed Zoning: R-40 Vicinity Map A. Trip Generation: This development is estimated to generate 10,960 additional vehicle trips per day (0 existing) based on.the submitted traffic study. 4. 2. 3. Findings of Fact Impact Fees: The impact fee rate from the fee tables for. Impacted Roadways: Fairview Avenue Fronta` Functional Street. Classification: Traffic count: Level of Service: Speed limit: Nearest intersection: 1,080-feet Principal arterial Cest of Locust Grove was 29,931 on 7-6-00. 35 Fairview Avenue and Jericho Drive intersection Tear Frontage: Functional Street Classification: Traffic count: Speed limit: 60 Local residential Not available 20 Claren- e Frontage: 60 Functional Street Classification: Local residential Traffic count: Speed limit: Not available 20 Jerich_ R_ad Frontage; Functional Street Classification: Traffic count: Level of Service: Speed limit: Nearest intersection: 0 Collector North of Fairview was 3,850 on 8-7-01 Better than"C" 30 Jericho Drive and Fairview Avenue intersection Traffic Impact Study; A traffic impact study was required with this application. The submitted traffic impact study was compiled by Dobie Engineering and the following is a summary of the findings: This Development is projected to be built-out by the year 2005. The following is a summary or the findings and recommendations provided by the Traffic Engineer: o Apartment is $781.00 per unit. o General Office is $2,169.00 per thousand square feet of gross building area, based on the impact fee ordinance in effect at this time. o Specialty Retail is $1,885.00 per thousand square feet of gross building area, based on the impact fee ordinance in effect at this time. o Bank with drive-thru is $9,990.00 per thousand square feet of gross building area, based on the impact fee ordinance in effect at this time. o Fast Food with drive-thru is $4,715 per thousand square feet of gross building area, based on the impact fee ordinance in effect at this time. 2 The proposed Fairview Lakes Subdivision project is a proposed mixed use development including apartments, professional offices, specialty retail, and restaurants. The project will be developed in phases and is expected to reach full build out by the year 2005. Fairview Avenue is a standard principal arterial with a 64 ft. wide five-lane urban section. The posted speed limit is 35 mph east of Locust Grove Road. The Level of service for Fairview Avenue is estimated to operate at a LOS B/C during the peak hour period in the year 2005 without the addition of the site traffic. This development is projected to generate 10,960 total trips, of which 1,230 will be captured within the development. Of the remaining 9,730 trips 5,545 were estimated to be new to the area while 4,185 trips were estimated to be pass-by trips already on Fairview Avenue. These trips were based on 192 apartment units, 15,000 sf of office space, 100,000 sf of retail use, a 5,600 sf bank, and 8,000 sf for restaurant. A trip capture rate of 11.2% was used. The totals from the revised application were 192 apartment units, 15, 000 sf of office space, 92, 800 sf of retail use, a 5, 000 sf drive-in bank, a 4,000 sf fast food restaurant w/drive-thru, and a 12, 000 sf high turnover restaurant The totals presented in the traffrc study are actually higher than those calculated for the application total. This is the conservative approach which will safeguard against totals that maybe higher than those projected. The need for a signal at this intersection should not be affected by the difference in traffic projections. ~~« uamc wm experience significant delay during the PM peak hour. "' -This analysis was based on the assumption that the west access will be approved for Signalization. Approach traffic from the site will maintain acceptable service levels by that time period with the addition of a traffic signal. Fairview Avenue was evaluated for Level of service in the build out (2005) and 2020. The projections for the peak hour were LOS C for 2005 and LOS E for 2020 based on a five-lane roadway. The recommendation is that Fairview Avenue be expanded to handle the additional capacity needed after year 2020. The Traffic study reviewed the Signal Warrants from the 1988 MUTCD. The analysis indicates that warrant #1 will be met with 75% of site traffic using the signalized intersection. Warrant #2 is met with less than 50 /o of the site traffic. Similarly, warrants #9, #10, and #11 are all satisfied based on projected traffic volumes. 3 5• Site Information: The site is currently vacant. 6• Description of Adjacent Surrounding Area: • North: Meridian Place Subdivision Number 1 • South: Commercial /retail • East: Fairview Terrace Mobile Home Park • West: Settlers Village Re-subdivision 7~ Roadway Improvements Adjacent To and Near the Site The site has access to Fairview Avenue and two local residential stub streets, Teare Avenue and Clarene Street. Fairview Avenue is improved with 5-traffic lanes with no curb, gutter or sidewalk abutting the site. There is curb, gutter and 5-foot concrete sidewalk located directly to the east of this property and was constructed with carwash that is located on the northwest corner of Jericho Road and Fairview Avenue. Teare Avenue and Clarene Street are improved with 2-traffic lanes (37-feet of pavement) with curb, gutter and 5-foot concrete sidewalk. Jericho Road does not abut the site but would be utilized with the extension of Teare Avenue or Clarene Street. Jericho Road is a collector roadway that is improved with 2-traffic lanes with curb, gutter and 5-foot concrete sidewalk. $• Existing Right-of-Way Fairview Avenue is a principal arterial that currently has a total of 110-feet of right-of-way (55-feet from centerline). Teare Avenue and Clarene Street are local residential roadways with a total of 60-feet of right-of-way (30-feet from centerline). 10. Site History On May 7, 2000, the Commission reviewed and approved a preliminary plat, Teare Terrace, on this site. Teare Terrace was proposed to be a 13-lot commercial and residential subdivision. This development proposed to extend Clarene Street into the property and extend south to connect to Fairview Avenue. Teare Avenue was proposed to extend into the site as a cul-de-sac on the property. 11. Five Year Work Program There are no improvements in the area that are scheduled in the Five Year Work Program. 12. Signal Location The District has chosen the location of the signal at the commercialCndustrial roadway and Fairview Avenue intersection due to the fact that: • This location is at the half-mile • This location will serve more vehicle trips per day • This location will pull vehicle trips per day off of Jericho Street (a collector roadway with front on housing) and will place the vehicles on a commercial/industrial roadway • This location will provide the surrounding residential homes with access to a signal 4 • This location can serve more vehicle trips per day on the North side of Fairview Avenue than on the south side of Fairview Avenue B. Findings for Consideration Right-of-Way and Sidewalk District policy requires 120-feet of right-of-way on arterial roadways (Figure 72-F1B). This right-of- wayallows for the construction of a 7-lane roadway with curb, gutter, 5-foot concrete detached sidewalks and bike lanes. Fairview Avenue is not listed as a proposed project in the District's currently adopted Five-Year Work Program or in the currently adopted 20.year Capital Improvements Plan. As such, the applicant cannot receive reimbursement for dedicated right-of--way from available collected impact fees. The applicant shall do one of the following: a. Dedicate by donation an additional 5-feet of right-of--way along Fairview Avenue, and construct a minimum 5-foot wide concrete sidewalk along Fairview Avenue, located a minimum of 53-feet from the centerline of the right-of--way. b. Do not dedicate additional right-of--way, but construct a minimum 5-foot wide concrete sidewalk along Fairview Avenue, located a minimum of 53-feet from the centerline of the right-of--way, in an easement provided to the District. c. Do not dedicate additional right-of-way, but construct a minimum 5-foot wide concrete sidewalk along Fairview Avenue, located at the back edge of the existing right-of--way. Accomplish all necessary adjustments to properly accommodate existing drainage and utilities. 2• Roadway Offsets District policy 7204.11.Ei, requires local roadways to align or offset a minimum of 300-feet from an arterial roadway (measured centerline to centerline). The applipnt is proposing to construct acommercial/industrial roadway that intersects with Fairview Avenue 310-feet east of the west property line. This roadway location meets District policy and should be approved with this application. 3• Street Sections District policy 7202.8 and 72-F1 B, requires roadways abutting commercial developments to be constructed as a 40.foot street section with curb, gutter and 5-foot concrete sidewalk within 54-feet of right-of-way. The applicant is proposing to construct acommercial/industrial roadway that extends from Fairview Avenue to the north. This roadway is proposed to cul-de-sacjust before the proposed multi-family residential apartment complex. This roadway will also provide a link that will connect into Teare Avenue. The proposed commerciaUindustrial roadway that the applicant is proposing will consist of a 40-foot street section that includes 2-travel lanes, a center turn lane, curb, gutter and 5-foot concrete sidewalk within 54-feet of right-of--way. The proposed street section meets District policy and should be approved with this application. 5 4. Driveways District policy F2-F5, requires driveways located on collector or arterial roadways with a speed limit of 35 to align or offset a minimum of 150-feet from any existing or proposed driveway. District policy F2-F4 (1) and 72-F4 (2), requires driveways located on commercial/industrial roadways to offset a controlled and/or uncontrolled intersection a minimum of 50-feet (measured near edge to near edge). District policy 7207.9.3 restricts commercial driveways with daily traffic volumes over 1,000 vehicles to a maximum width of 35-feet. Most commercial driveways will be constructed as curb-cut type facilities if located on local streets. Curb return type driveways with 15-foot radii will be required for driveways accessing collector and arterial roadways. Fairview Avenue Drivewa The applicant is proposing to construct one 30-foot wide driveway on Fairview Avenue. This driveway is proposed to intersect Fairview Avenue approximately 205-feet west of the east property line. This driveway meets District policy and should be approved with this application. Commercial /Industrial Street Drivewa s The applicant is proposing to construct thirteen driveways on the proposed commercial/industrial roadway. The driveways are proposed to be constructed in the following locations. • Driveway number 1 is proposed to intersect the commercial/industrial roadway approximately 54-feet north of Fairview Avenue. This driveway is proposed to be 25- feetin width. • Driveway number 2 and 3 are proposed to intersect the commercialfindustrial roadway approximately 175-feet north of Fairview Avenue. These driveways are proposed to align•with one another. These driveways are proposed to be 17-feet in width. • Driveway number 4 is proposed to intersect the commercial/industrial roadway approximately 235-feet north of Fairview Avenue. This driveway is proposed to be 21-feet in width. • Driveway number 5 is proposed to intersect the commercial/industrial roadway that extends north from Fairview Avenue approximately 580-feet north of Fairview Avenue. This driveway is proposed to be 22-feet in width. • Driveway number 6 is proposed to extend directly north of the commercial/industrial roadway and proposed to intersect the northern portion of the cul-de-sac. This driveway is proposed to be 45-feet in width. • Driveway number 7 is proposed to intersect the commercial/industrial roadway that runs east and west and is proposed to be located approximately 50-feet east of the commercial/industrial roadway that extends from Fairview Avenue to the north. This driveway is proposed to be 27-feet in width. • Driveway number 8 is proposed to intersect the commercial/industrial roadway that runs east and west and is proposed to be located approximately 255-feet east of the commercial/industrial roadway that extends from Fairview Avenue to the north. This driveway is proposed to be 20-feet in width • Driveway number 9 is proposed to intersect the commercial/industrial roadway that runs east and west and is proposed to be located approximately 430-feet east of the commercial/industrial roadway that extends from Fairview Avenue to the north. This driveway are proposed to be 25-feet in width. 6 Driveways number 10 and number 11 are proposed to be 30-feet in width and located on the east and west side of the commercial/industrial roadway just north of the proposed roundabout. Driveway number 12 and 13 are proposed to be 30-feet in width and located on the east and west side of the commercial/industrial roadway approximately 160-feet north of the proposed roundabout. All of the proposed driveway locations meet District policy in regard to location. All of the proposed driveway widths meet District policy EXCEPT for driveway number 6. Driveway number 6 should be constructed a maximum of 35-feet in width. 5• All Driveways Graveled driveways abutting public streets create maintenance problems due to gravel being tracked onto the roadway. In accordance with District policy, 7207.9.1, the applicant should be required to pave the driveway its full width and at least 30-feet into the site beyond the edge of pavement of the roadway and install pavement tapers with 15-foot radii abutting the existing roadway edge. 6. Stub Streets District policy 7203.5.1 and 7205.5 requires stub streets to provide intro-neighborhood circulation and to provide access to adjoining parcels. District policy 7203.3.2 requires an existing street or a street in an approved preliminary plat, which extends at a boundary of a proposed development to be extended into that development. The applicant is proposing to extend Teare Avenue. This extension will provide a connection from Teare Avenue to Fairview Avenue. The extension of Teare Avenue meets the goals and intent of District policy and has the supportive of District staff. The District held a neighborhood meeting on Thursday March 20, 2003. The Teare Avenue extension was approved by the Meridian City Council on March 25, 2003 after a number of neighborhood concerns arose. Modification of Policv The applicant is proposing to terminate Clarene Street at its current location and construct temporary bollards for emergency access only. District policy requires that stub streets be constructed and/or extended to adjoining properties to provide reasonable access and intro-neighborhood connectivity. Staff would generally support the extension of Clarene Street into the site, but due to the fact that the applicant is extending Teare Avenue to the residential neighborhood that is located to the northeast, staff is supportive of the applicant's proposal to construct bollards at the terminus of Clarene Street. With the construction of bollards, Clarene Street will be one-lot and less than 150-feet in depth, therefore, the applicant will not be required to construct a temporary turnaround. 6. Turnarounds District policy 7204.9.2 requires turnarounds to be constructed to provide a minimum turning radius of 55-feet. The applicant is proposing to dedicate a hammerhead turnaround at the west end of Clarene Street on the applicant's property. This hammefiead turnaround will function as the property's frontage until the preliminary plat is submitted and the roadways are formally dedicated. This hammerhead turnaround is required to have bollards installed at the terminus of Clarene Street where the hammerhead begins. The applicant should also enter into a license agreement for the maintenance of the hammerhead turnaround on Clarene Street due to the fact that the District will be unable to access the turnaround. The applicant is proposing to provide a permanent `hammerhead" easement to the District at the terminus of North Lark Avenue. This easement is acceptable to the District but must be approved by the Meridian Fire Department. The applicant should provide a permanent "hammerhead" easement to the District at the terminus of the commercial/industrial roadway and provide documentation to the District showing the review and approval of this configuration from the Meridian Fire Department. 7. Roundabout The applicant is proposing to construct a roundabout within the commercial/industrial roadway approximately 530-feet north of Fairview Avenue. The roundabout should be designed with 21-foot street sections on either side of the center island. The applicant will be required to dedicate sufficient right-of-way on either side of an island. Coordinate the size and design of the roundabout with traffic services staff. 8. Signalization The applicant is proposing to construct a new signal at the intersection of Fairview Avenue and the commercial/industrial roadway that extends north into the site. The signal is proposed at the half mile. The traffic study determined that the warrants would be met and that the existing signals in the area would not be significantly impacted by the new signal. The District will contribute the hardware necessary for the construction of the new signal and any related roadway improvements. The applicant should plan, construct and install the signal that is proposed at the intersection of Fairview Avenue and the commercial/industrial roadway that extends north into the site. C. Site Specific Conditions of Approval 1. The applicant shall do one of the following: Dedicate by donation an additional 5-feet of right-of-way along Fairview Avenue, and construct a minimum 5-foot wide concrete sidewalk along Fairview Avenue, located a minimum of 53-feet from the centerline of the right-of--way. Do not dedicate additional right-of--way, but construct a minimum 5-foot wide concrete sidewalk along Fairview Avenue, located a minimum of 53-feet from the centerline of the right-of-way, in an easement provided to the District. Do not dedicate additional right-of-way, but construct a minimum 5-foot wide concrete sidewalk along Fairview Avenue; located at the back edge of the existing right-of-way. Accomplish all necessary adjustments to properly accommodate existing drainage and utilities. 2. Construct and install the signal and any related roadway improvements that are necessary for the proposed signal at the intersection of Fairview Avenue and the commercial/industrial roadway that extends north into the site. 3. Construct acommercial/industrial roadway that intersects with Fairview Avenue 310-feet east of the west property line, as proposed. 4. Construct the internal roadways as 40-foot street sections with curb, gutter and 5-foot concrete sidewalk within 54-feet of right-of--way, as proposed. The portion of the commercial/industrial roadway that connects to Teare Avenue shall taper appropriately to accommodate for drainage. 5. Construct a 30-foot wide driveway to intersect Fairview Avenue approximately 205-feet west of the east property line, as proposed. 6. Construct a 25-foot wide driveway to intersect the commercial/industrial roadway approximately 54- feet north of Fairview Avenue, as proposed. 7. Construct two 17-foot wide driveway to intersect the commercial/industrial roadway approximately 175-feet north of Fairview Avenue, as proposed. 8. Construct a 21-foot wide driveway to intersect the commercial/industrial roadway approximately 235- feet north of Fairview Avenue, as proposed. 9. Construct a 22-foot wide driveway to intersect the commercial/industrial roadway that extends north from Fairview Avenue approximately 580-feet north of Fairview Avenue, as proposed. 10. Construct a driveway with a maximum width of 35-feet to extend directly north of the commercial/industrial roadway and proposed to intersect the northern portion of the cul-de-sac. 11. Construct a 27-foot wide driveway to intersect the commercial/industrial roadway that runs east and west and is proposed to be located approximately 50-feet east of the commercial/industrial roadway that extends from Fairview Avenue to the north, as proposed. 12. Construct a 20-foot wide driveway to intersect the commerciaVindustrial roadway that runs east and west and is proposed to be located approximately 255-feet east of the commercial/industrial roadway that extends from Fairview Avenue to the north, as proposed. 13. Construct a 25-foot driveway to intersect the commercial/industrial roadway that runs east and west and is proposed to be located approximately 430-feet east of the commercial/industrial roadway that extends from Fairview Avenue to the north, as proposed. 14. Construct a 30-foot wide driveway located on the east side of the commerciaUindustrial roadwayjust north of the proposed roundabout, as proposed. 15. Construct a 30-foot wide driveway located on the west side of the commercial/industrial roadwayjust north of the proposed roundabout, as proposed. 16. Construct a 30-foot wide driveway located on the east side of the commercial/industrial roadway approximately 160-feet north of the proposed roundabout, as proposed. 17. Construct a 30-foot wide driveway located on the west side of the commercial/industrial roadway approximately 160-feet north of the proposed roundabout, as proposed. 18. Pave the driveways their full width and at least 30-feet into the site beyond the edge of pavement of the roadway and install pavement tapers with 15-foot radii abutting the existing roadway edge. 19. Extend Teare Avenue as a 40-foot street section with curb, gutter and 5-foot concrete sidewalk within 54-feet of right-of-way, as proposed. 20. Terminate Clarene Street at its current location and construct bollards for emergency access only, as proposed. 21. Enter into a license agreement for the maintenance of the hammerhead turnaround on Clarene Street due to the fact that the District will be unable to access the turnaround. 22. Provide a permanent °hammerhead" easement to the District at the terminus of the commerciaUindustrial roadway and provide documentation to the District showing that this configuration has been reviewed and approved by the Meridian Fire Department. 23. Construct a roundabout within the commercial/industrial roadway approximately 530-feet north of Fairview Avenue. Design the roundabout with a minimum of 21-foot street sections on either side of the center island. Dedicate sufficient right-of--way on either side of an island. Coordinate the size and design of the roundabout with traffic services staff. 24. Comply with all Standard Conditions of Approval. D. Standard Conditions of Approval Any existing irrigation facilities shall be relocated outside of the right-of-way. 2. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 3. Replace any existing damage curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 4. All design and construction shall be in accordance with the Ada County HighwayDistrict Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACRD Ordinances unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 5. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or other required permits), which incorporates any required design changes. 6. Construction, use and property development shall be in conformance with all applicable requirements of the Ada County Highway District prior to District approval for occupancy. 7. Payment of applicable road impact fees are required prior to building construction in accordance with Ordinance #195, also known as Ada County Highway District Road Impact Fee Ordinance. 8. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. Existing utilities damaged by the applicant shall be repaired by the applicant at no cost to ACHD. The applicant shall be required to call DIGLINE (1-800-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387- 6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 10 9. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of the Ada County Highway District. The burden shall be upon the applicant to obtain written confirmation of any change from the Ada County Highway District. 10. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the Highway District of its intent to change the planned use of the subject property unless a waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. E. Conclusions of Law The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are satisfied. 2. ACHD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular and pedestrian transportation system within the vicinity impacted by the proposed development. Attachments 1. Vicinity map 2. Submitted site plan 11 Request for Reconsideration of Commission Action Request for Reconsideration of Commission Action: A Commissioner, a member of ACRD staff or any other person objecting to any final action taken by the Commission may request reconsideration of that action, provided the request is not for a reconsideration of an action previously requested to be reconsidered, an action whose provisions have been partly and materially carried out, or an action that has created a contractual relationship with third parties. a. Only a Commission member who voted with the prevailing side can move for reconsideration, but the motion may be seconded by any Commissioner and is voted on by all Commissioners present. If a motion to reconsider is made and seconded it is subject to a motion to postpone to a certain time. b. The request must be in writing and delivered to the Secretary of the Highway District no later than 3:00 p.m. on the day prior to the Commission's next scheduled regular meeting following the meeting at which the action to be reconsidered was taken. Upon receipt of the request, the Secretary shall cause the same to be placed on the agenda 'for that next scheduled regular Commission meeting. c. The request for reconsideration must be supported by written documentation setting forth new facts and information not presented at the earlier meeting, or a changed situation that has developed since the taking of the earlier vote, or information establishing an error of fact or law in the earlier action. The request may also be supported by oral testimony at the meeting. d. If a motion to reconsider passes, the effect is the original matter is in the exact position it occupied the moment before it was voted on originally. It will normally be returned to ACHD staff for further review. The Commission may set the date of the meeting at which the matter is to be returned. The Commission shall only take action on the original matter at a meeting where the agenda notice so provides. e. At the meeting where the original matter is again on the agenda for Commission action, interested persons and ACHD staff may present such written and oral testimony as the President of the Commission determines to be appropriate, and the Commission may take any action the majority of the Commission deems advisable. f. If a motion to reconsider passes, the applicant may be charged a reasonable fee, to cover administrative costs, as established by the Commission. 12 13 ~s a ~q a m i i E C E a 2 G Y b s 4 a g ~ E d 4 a V t g ~~~ r~~S~~~E~ ~~~~~~ ~~ ~ ~ ~f~ ~~~f~t~~p ~~ ~EJ € [~ E@ ~ ;; S ~~ Y Y 4 H Y €¢Ri9~R*RRS66F ~$FFEEF ~ N A ~~ oD m D C m G r D m