CONTRACT CHANGE ORDER
Change Order No.: 2
Project Number: 0726 C
Date: 7/28/2008
Effective Date:
CONTRACTOR: K2 Construction
PROJECT: Water Division -Phase 2
The Contractor is hereby directed to make the following changes from the Contract Documents and Plans.
Desciptlon: Amount
wcD No.S) Supply and install 2" Condensation Control Blanket at the roof of the vehicle
storage building. $5,069.97
Reason for Change Order:
wcD No.S) Extend the life of the vehicle storage building.
Attachments:
WCD No. 5 and K2 Change Order No. 00004.
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price: $468,665.00 Original Contract Completion Date: 9/10/2008
Original Contract Completion Days: 90 Working
Net changes form previous C.O: s.: Net Days change form previous C.O.'s:
No. 0 to 1 No. 0 to 1
$27,377.13 8 Working
Contract Price Prior to this C.O.: Contract Completion Date before this C.O.: 9/22/2008
$496,042.13
Net Increase (decrease) of this C.O.: Net Days Increase (decrease) of this C.O.: 0
$5,069.97
Contract Price with all Approved C.O: s: Contract Completion Date with all Approved C.O.'s: 9/22/2008
$501,112.10
RECOMMENDED: (CONSTRUCTION MANAGER) ACCEPTED (CONY TOR)
By:
Date:
/ By:
D
t
~~,,
/j~ a
e: '/Z g d
APPROVED: (CITY P~ rG AG N
(i COUNCIL APPROVAL
By: Keith Watts
Date: ~ ~~ , ~~ J J~ ~u~~~i~~i~~,,
Date: ~ r / ~ - V `` ~ D~ ~~~i,
~~
APPR-OVE~D: QTY) ATTEST: j~, '%
By: Mayor Tammy d eerd By: City Clerk, Jaycee Holman _ Q'~s T
Date: ~ - `3 - ~ ~ Date: 8 . ~ -~ g VF/~a ~ i
1~
'~~~~~r~ltr~ii~i »~~N~~~~`\`
CI?Y OF MERlDUW
WATER DMSIOtV-PHASE 2
ADA CQ[JN1Y. IDAHO
WORK CHANGE DIRECTIVE
No. 005
DATE OF ISSUANCE 7/28/08 EFFECTIVE DATE 7/28108
OWNER City of Meridian
CONTRACTOR IC2 Construction
Project: Water Division -Phase 2
OWNER's Contract No. 0726 C
You are directed to proceed promptly with the following ohange{s}:
Description:
Supply and install 2" Condensation Control Blanket at the roof of the vehicle storage buildmg.
Purpose of Work Change Directive:
Extend the life of the vehicle storage building.
Attachments: (List documents supporting change)
Tf OWNER or CONTRACTOR believe that the above change has affected Contract Price any Claim for a
Change Order based thereon will involve one or more of the following methods as defined in the
Contract Documents.
Method of determining change in
Contract Price:
^ Unit Prices
It Lump Sum
^ Cost of the Work
Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract
$ ~; a~ 9. 9 ~ Times:
If the change involves an increase, the estimated Substantial Completion: $ days;
amount is not to be exceeded without further Ready for fmal payment: days.
authorization.
RECOMMENDED: AUTHORIZED:
..t.ti_
O E OJE ttQANAGER OGI~IYEER
By: ~iJ~S ~s~1 sy: ~l -nt 9i,1 sb v
ElCDCN .I91U-S-F (1996Editian)
Pn~ared by tho Engineent Joint Coatrut Doeuna:ats Canmdtke and endorsed by The Assacinted t7enaral Coolraciocs ofAmetica wid the Cattsavctioa Specifications
Insddtle.
~[JTLE~
~tNC. t7 NSTI3YCT O N OIi/e-lMAal@~ ~
cows~uc-r~oev BU/LDER
' 4.
CITY OF MERIDIAN K2 Agreement #: 0835 - 000001
660 East watertower Lane Change C}rcler #: Qnn(la
Suite 200 Phone: 208-848-550P Page 1 of I
Meridian, TD 83642 Fax: 208-898-955: For: 2" Roof Insulation
Project:City of Meridian - Parldng Facility
2235 NW 8th Street
Ta KZ Construction, Inc.
8555 W. Hackamare Dr., Suite 200
Boise, ID 83709
Attention: Stacie Irish
Phone: 208-377A139 Box: Z08-377-9149
Chance order
(Subcontrncts/Contracts)
CO Date: Friday, Jul 25, 2008
Job #: 0835
Contract No: OOOOOI
Contract For. MAIN CONTRACT
Contract Date: 5/Z2/2008
Original Contract Completion Date 9/10/2008
Mobile:208-863-2927 Prager.
nxnma.r-. _Sr_{~cCsu i; 4us-• ~~ JM:'^ tx•Q~J Ni;.~;' f•~ 'T•m ~.:ffi•^ ~.~s 't J
€r-+'~.~'-r~°~•E~"~~ . s u ::,:s yE -._Y,~ x ,,~ ~~a~3 = .ate ;~ °.' y~~['~an~ ,,• ( x3';,z-~is~~.e`~= ~ r ~.~. ~ ~~ ~'~5''
Item.-..~D`esec~aptaon~'~i$ ~..•-~::Sfo'ck'~"'~•-f.: r'' ~ uanf~tyy.~~Y~iiiis:-x ~.~i~~•~~•~-~Tn~il<lerice .;=Taz~~taf~h -T'ax ~ • aunt ~i"e ,~mourit
00001 Supgly end installation afZ"
Condensation Coatml Blanket at
the maf of vehicle storage building
DODDZ Bond Cast
OOD03 Liability Insurance
D0004 Contrector Fee ~ ~ ~ ~ ~ ~/ ~ ~N
K2 C(?~1STRUCT"1~6~; d~!r.
1.000 LS $4,485.00 0.00°/" $0.00 $4,485.00
1.000 L5 $733fi 0.00% $0.00. $7336
1.000 LS 550.70 O.DO°/a $0.00 $50.70
1.000 LS &16091 0.00'!0 $0.00 $460.91
CO Unit Cost: 55,069.97
CO Unit Tax: $0.00
CO Lump Sum: 50.00
CO Lnmp Tax: $0.00
CO Total: 55,069.97
The Original Contract Sum was ................................................................................................. $468,665.00
Net Change by Previously Authorized Requests and Changes ................................................ $27,377.13
The Contract Sum Prior to This Change Order was ......... $496,042.13
The Contract Snm Will be Increased ................................................................................... $5,069.97
The New Contract Sum Including This Change Order ..... $501,112.10
'The Contract Time Will Not Se Changed .................................................................................
The Date of Substantial Completion as of this Change Order Therefore is ... 9/18/2008
------------ OFFER AND ACCEPTANCE 5IGNATURES ------------- APPROVAL (if required):
ICZ Coastruetiaa, Inc. CITY OF ii3lu}2IDiAN
By: By: ,,~~ By:
Stacie Irish Max Jensen
Date: 7/28/2008 Date: 7/28/2008 Date: