HomeMy WebLinkAboutTask Order No. 07-72 with JUB Engineerings for Downtown Sewer Study and CIP Phase 1CITY OF MERIDIAN
TASK ORDER NO 07-72 FOR
ENGINEERING SERVICES FOR WATER, WASTEWATER, AND MISCELLANEOUS PUBLIC
WORKS PROJECTS
DOWNTOWN SEWER STUDY AND CIP -PHASE 1
City Project No.
Engineer Project No.
THIS TASK ORDER, entered into this day of ,2008, between City of Meridian, Idaho, hereinafter referred to
the "CITY", J-U-B ENGINEERS. Inc. ,hereinafter referred to as the ENGINEER, is subject to the provisions of the Agreement
Engineering Service for Water, Wastewater, and Miscellaneous Public Works Projects, approved December 12, 2006, hereina'
referred to as the MASTER AGREEMENT for PROFESSIONAL SERVICES.
WITNESSETH:
WHEREAS, the CITY intends to complete the D wntown Sewer Study, hereinafter n;ferred to as the PROJECT; N(
THEREFORE, the CITY and J-U-B ENGINEERS. Inc in consideration of their mutual covenants herein agree in rasped as
forth below.
CITY INFORMATION AND RESPONSIBILITIES:
The CITY will provide to ENGINEER the data and/or services specified in the AGREEMENT.
In addition, the CITY will furnish to ENGINEER items listed in Attachment "C".
SCOPE OF SERVICES TO BE PERFORMED BY ENGINEER:
ENGINEER will arovide those services described in Attachment "A".
SCHEDULE OF WORK TO BE PERFORMED:
ENGINEER will perform said services in a timely manner.
BASIS OF FEE AND BILLING SCHEDULE:
The CITY will pay ENGINEER for its services and reimbursable expenses as follows: On a time and materials basi
estimated budget as shown on Attachment "B".
File Folder Title: City of Meridian -Downtown Sewer Study and CIP -Phase 1
Remarks:
IN WITNESS WHEREOF, the parties hereto have executed this TASK ORDER as of the day and year first above written.
CITY: City of Meridian, Idaho
33 E. Idaho St.
Meridian, ID 83642
By:
NamelTitle: Tamm d eerd Ma r
PUBLIC WORKS APPROVA
By:
Namelfitle: ~~/e /~~~-~P.~
/~{rft. C;~y ~9~
ENGINEER: J-U-B Engineers, Inc.
250 S Beech pod Ave, Ste, 201
Boise, ID 3 9
By:
Namelfitle: Phillip H. Krichbaum. P.E.. Project Manager
,.~,~ o~
ATTEST: ~.~~~
~`
By: -~ ~ O
vgsaa
.f ~~
'~ ~ T1~.
'-,
~~~NrNrnr nN~'
.~
(/ ~~'
s
J.-U-B ENGINEERS, Inc.
Attachment 'A' - 10-08-050
Rev 7/25/2008
MERIDIAN PUBLIC WORKS DEPARTMENT
DOWNTOWN SEWER STUDY AND CIP -Phase 1
Agreement to Provide Engineering Services
Attachment "A" -Scope of Engineering Services Outline
The ENGINEER shall furnish the services specifically limited to the following:
1. Task 1-Existing Conditions, Base Mag i~ng, Flow Monit~a. and Field Investigation
1.1 Kickoff Meetings and Progress Meetings: ENGINEER shall meet with City staff to review 1
and request City provided information. Progress meetings will be held with CITY and sta
throughout the project. An assumed number of meetings are shown on Attachment "B".
1.2 Review Available Information
1. Review Existing Model: The City's GIS staff is currently developing acity-wide existing odel.
The City's intent is to utilize their current EPASWIMM model with a GIS interface. At thi time,
the GIS interface module is in development, and therefore, the model may not be avail le to
the ENGINEER for use on the project. The ENGINEER will assist the City in evaluating sks
needed to establish the existing model and provide consultation with the City on other
modeling options. An assumed level of effort is shown on Attachment ~~B".
2. Existing flow monitoring data and WWTP records.
3. Water and sewer billing data for dry and wet weather conditions.
4. Available studies
5. Planning information from the Meridian Development Corporation (MDC) and Gty P8cZ
6. GIS data for right-of-way
1.3 Update and develop base mapping and system inventory
1. Meet with public works staff and review sewer base mapping for recent sewer improven
2. If directed by the City, the ENGINEER will update sewer base mapping in GIS to reflect
improvements to the collection system in a format compatible with the City's GIS systen
1.4 Flow Monitoring and Field Investigation
1. Phase 1 Outfall Sewers: The initial phase will include flow monitoring on trunk sewers
receiving flows from the downtown area. It is anticipated between 3 or 4 flow monito will be
installed for a period of 2 weeks.
2. Phase 2 Study area (Sub-basin): If authorized by the City, a more detailed flow monito 'ng
plan will be implemented on an interior sub-basin level focusing on excessively high I/I
collection lines. For the estimating fees, an additional 3 monitoring setups over 2 wee is
assumed.
3. Complete a cursory field review major collection sewers lying in ally or back lot lines to
estimate constructability issues and corridor availability.
1.5 Prepare Letter Report
1. The ENGINEER shall prepare a letter report summarizing the flow monitoring data,
review and recommendation for master planning, and field investigations.
City of Meridian -Downtown Sewer Study (Phase I) Page - 1
r
w
O
~m
c
3
N
W
X
0
N
O
N
"'~
0
a
r
D
N
...~
_~
N
3
a
3
a
d
N
W
d
N
N
Vf
N
O
N
O
o~
NI A W N
~
v °
F a
m ~
W x
°
m
~
'°
F ~
~'
VI
C w
' N +
~ 7
p N + ~
C O~
n tr
A A
~ W
n N
P1 + ~
d
~
V
7C W
3
y ~1
~?
d .:.
n
jY D
~ ?,J
L ?1
Z O
;:
f
D ~
n
~ =n
n
~ O
~ ?1
C ~
C O
°'
N O
;+
A w
~ ~.
3 ~
~ ~
n o
~ Q g
(
p .
~ o o ~
,~
S. ,
X
Q 4
f
p 4
'Ci ~ ~
m
~
a
~
~ i
~
o
3
n
~
~
~
~
O ~
a
~- s
s
s
v R
H ~
5
~ R R 1~ Q
A
m
~;
~
~
d
'a ,
~ .
~
~
^
~
~
d
a
p
~.
~.
~
~'
w
A ~
,
m
~
a°
~
~
~
a a
~ a
~ s
iu
'~ o
''
3
y
w
7~
~ w .
~ ~ w w c
F ~ N n ~ ~ m ~ c 5. 5
. ~
w .d. 3 w 2
~ ~
~ ~ ~
N ~ 7 C ~ N ~ 7 ~ ~ 7 A
fi -~,~'i. ~ ~ ~
n ~ f
q
Z ~ 7 ~7u ~
~
_
~
y .
3
~
_
~
~.
~~'
?
~
H
r
.
W
v
d
a
`~
~
G^
`~ p
~n
~ d _~ b ~ N d ~ d
~ O 7. M ~ ~ w d H A ~ 01 C O
a N
~ o
~ w ° 5i ~'
F
~ w w ~
gi m' ~ '
a0 ~ n. A ~
~o W :i
W
'~' 3
g ~
n ~ A
Yo m
~ v
$ m
n ~
n '' 3
°'
o ~
3
o, ~
~ '
o k„'
~ ~
~p r
°~
~
c
..
~
c~
5.
`
~
~
,»
~
~
5.
~
°
c y
~
~
°' 3
~
'
~
n
~ ~ ~ ^ N
~ ~ I" ~ ~ ~ e
?
~
N
~
~ NN
N
o.
~ ~
H
R
.'» a }~ ~ Na m ~
a o
a
a ~ ~ ~
a ~ ~
N
N
N
~
pq
~d: (~1
O
y (~1
~
d
N:
N
to ~ ~
N
to
O
iJ~
O
i7~
o
N 0
N 0
N 0
N 0
N 0
N 0
N 0 0
N 0
N 0 0
N 0
N 0
V 0
`:P V1 tJ1 Vl V1 VI VI V1 VI VI V+ + VI VI •••. to V1
a o
N 0
V 0 0
N 0 0
N 0 0
O
O
O
O V1 il
t VI JI
I {J~ J1
t N + VI JI
{ + lJ~ N~
~
N
-V1
+
V1 O
V
Y1
N
+
O O
V
to N
~n O
i7~
O O
N N
N
N
O
N
~
0'D
r
O~
Vf
~
r
O~
r
pp~
a/~
~
y~
j
N
N
A
W
~
w
~
h
N
j
~..
w
~/f
~
+
w
N
~
w
r
~p
~
~
~
W
~
p
T
V
O
N
W
T
N
N
.
A
~
o
O
N
P
N
W
N
Oho
N
N
uWi
N
~ p
~
O
N
O
~
O
a
~ _ _ -]
_..Y F~'E
7r
A
0
a
2
N
~ .:
r y.
~ ~"
~ ~`a
f ,~ ~
4::'
'. ~O ,'~a
X ~
~. l~t ~'.
p rn
~ y
w = "'
g c
~ ,
~ v ;''':
O ~ ,l FA
P
0>~
_i
O
a
z
v
p
C
m
N
m
a
a
n
3
m
W
J-U-e ENGINEERS, Inc.
Attachment `C' -
MERIDIAN PUBLIC WORKS DEPARTMENT
DOWNTOWN SEWER STUDY AND CIP
Agreement to Provide Engineering Services
ATTACHMENT "C" -ITEMS PROVIDED BY THE CITY
1. Provide on-going review of J-U-B's work and collaboration on the planning and master
palling process as may be required throughout the project. Provide timely consideration and
direction of policy issues within a time acceptable to the City and J-U-B.
2. Provide legal counsel as required for consultation and legal opinions of project and policy
issues on an as needed basis.
3. Provide CCN inspection DVDS and other inventory records in the study area.
4. The City's most recent GIS data for base map development.
5. Provide flow monitoring equipment for installation by the ENGINEER.
6. Record drawings of City facilities and other relevant City information of record in project
area.
7. Provide City personnel and equipment to field locate existing City facilities for field review of
existing sewers of interest (i.e. alleys) by the ENGINEER.
8. Projected land use assumptions for the proposed study area.
9. Record drawings, if any, for any developments in the planning area.
10. Development plans and preliminary plats for new or proposed developments in the study
area.
City of Meridian -Downtown Sewer Study - Phase I Page -1