HomeMy WebLinkAboutParamount Sub CUPRECOMMENDATION TO CITY COUNCIL OF APPROVAL OF CONDITIONAL USE PERMIT FOR A
PLANNED DEVELOPMENT FOR PARAMOUNT SUBDIVISION BY PARAMOUNT, LLC – CUP-03-008 -
Page 1
BEFORE THE PLANNING AND ZONING COMMISSION
IN THE MATTER OF THE
REQUEST FOR CONDITIONAL
USE PERMIT FOR A PLANNED
DEVELOPMENT FOR
PARAMOUNT SUBDIVISION IN AN
R-8, R-40, L-O, & C-G ZONE
PARAMOUNT, LLC,
Applicant
)
)
)
)
)
)
Case No. CUP-03-008
RECOMMENDATION TO CITY
COUNCIL
1. The property is generally located within the square mile of Chinden Rd., Meridian Rd.,
McMillan Rd. and Linder Rd., Meridian.
2. The owner of record of the subject property is Paramount, LLC, 12426 W. Explorer
Drive, Suite 220, Boise, Idaho 83704.
3. Applicant is same as owner.
4. The subject property is currently zoned RUT & R1 (Ada County). There is, however, an
application for annexation and zoning to R-8 (Medium Density Residential), R-40 (High
Density Residential), L-O (Limited Office), & C-G (General Retail & Service
Commercial) before the City Council. The zoning districts of R-8, R-40, L-O, & C-G are
defined within the City of Meridian Zoning and Development Ordinance, Section 11-7-2.
5. The Applicant requests the Conditional Use Permit for a Planned Development in R-8, R-
40, L-O, & C-G zones. The zoning designations within the City of Meridian Zoning and
Development Ordinance require a Conditional Use Permit be obtained for most uses,
including those requested by the Applicant. (Meridian City Zoning and Development
Ordinance, Section 11-8-1).
6. The Meridian Planning and Zoning Commission recognize that the proposed application
is in compliance with the Meridian Comprehensive Plan.
7. The use proposed which is the subject of this will, in fact, constitute a conditional use as
determined by City policy.
8. The Planning and Zoning Commission recognized the concerns of Capt. Bill Musser,
Meridian Police Department in a memo dated March 19, 2003 and Wendel Bigham, Joint
School District No. 2, expressed in his letter dated February 12, 2003.
RECOMMENDATION TO CITY COUNCIL OF APPROVAL OF CONDITIONAL USE PERMIT FOR A
PLANNED DEVELOPMENT FOR PARAMOUNT SUBDIVISION BY PARAMOUNT, LLC – CUP-03-008 -
Page 2
RECOMMENDATION
The Meridian Planning and Zoning Commission hereby recommend to the City Council
of the City of Meridian that they approve the requested Conditional Use Permit as requested by
the Applicant for the property described in the application, subject to the following:
A. Adopt the Special Recommendations of the Planning and Zoning Commission as
follows:
1. This conditional use permit shall be valid for a period of eighteen months,
pursuant to MCC 12-17-4.
B. Adopt the Recommendations of the Planning and Zoning and Engineering staff (as
modified by the planning and Zoning Commission) as follows:
SITE SPECIFIC COMMENTS (Conditional Use Permit)
1. Applicant shall meet all of the requirements of the preliminary plat as a condition
of the Conditional Use Permit.
2. All development shall comply with the Americans with Disabilities Act and the
Fair Housing Act.
3. A new detailed Conditional Use Permit will be required prior to development of
any of the office/retail/multi-family housing within the Paramount Subdivision.
4. Temporary sales/information trailers shall be subject to the following conditions:
a. The proposed subdivision is permitted to have no more than two temporary
sales trailers on-site.
b. The landscaping and irrigation (in accordance with the Landscape Ordinance)
shall be provided in the front yard of the sales trailer shall be completed prior to
occupancy.
c. The trailer shall be skirted with material that is similar in color and material of
the rest of the trailer.
d. The applicant shall be responsible for providing adequate off street parking.
e. One wall sign is allowed for the temporary sales trailer. The sign shall be
limited in size to 18% of the wall area. No other signs shall be permitted.
RECOMMENDATION TO CITY COUNCIL OF APPROVAL OF CONDITIONAL USE PERMIT FOR A
PLANNED DEVELOPMENT FOR PARAMOUNT SUBDIVISION BY PARAMOUNT, LLC – CUP-03-008 -
Page 3
f. A building permit for the temporary building must be obtained through
Meridian’s Building Department prior to placing the trailer on a lot. A site plan
must accompany the building permit and be approved by Planning Department.
g. Sanitary sewer service and domestic water service may be requested for the
proposed use. Should a hook-up be requested, an assessment for sewer and water
service will be determined during the building permit application process.
h. Applicant must provide the Public Works and Fire Departments with
information on the method of fire protection to be used for the trailer.
i. The trailer must conform with all setbacks as set forth in the Paramount
Subdivision conditional use permit and preliminary plat.
j. The Timeframe for the sales and information trailers is for the duration of the
Paramount Project. Immediate removal of any approved trailers is required upon
completion of project sales.
k. The Applicant’s request to site the same trailer under the above-stated
conditions at other locations within future Paramount phases is approved without
a CUP modification. A new Certificate of Zoning Compliance and building
permit for all future trailer locations must be submitted to the City for each future
location, but a CUP should not be required for each future trailer location.
5. The applicant shall provide cross walks at the three N. Cinema Way
intersections at W. Colbert St., W. Charlton St. and W. Paramount Drive that will
provide pedestrian access to the proposed community center.
6. Fencing adjacent to Lot 10, Block15, Lot 1 Block 29, Lot 1 Block 24 and
Lot 1 Block 38 shall be limited to 4 feet in height if solid fencing material is used,
with the allowance for an additional 2 feet of lattice work to be placed on top of
the solid fence.
7. A planned sign program shall be required for the commercial portions of
the property.
C. Adopt the Recommendations of the Meridian Fire Department as follows:
1. The project which comprised of single family dwellings will require a fire-flow of
1,000 gallons per minute available for duration of 2 hours to service the entire project. Fire
hydrants shall be placed an average of 400’ apart. 1997 UFC Appendix III-A
2. Acceptance of the water supply for fire protection will be by the Meridian
Water Department.
RECOMMENDATION TO CITY COUNCIL OF APPROVAL OF CONDITIONAL USE PERMIT FOR A
PLANNED DEVELOPMENT FOR PARAMOUNT SUBDIVISION BY PARAMOUNT, LLC – CUP-03-008 -
Page 4
3. Final Approval of the fire hydrant locations shall be by the Meridian Fire
Department. The proposed fire hydrant locations will be submitted to the Public Works
for plan review.
4. All roads and fire lanes shall have a turning radius of 28’ inside and 48’ outside.
5. Operational fire hydrants and temporary or permanent street signs are required before
combustible construction begins. UFC 901.4.2 & 901.3
6. Two points of access will be required for the project or portions of the project that
serve over 50 homes. This will be a concern the way the project is phased in the early stages
of development.
7. Commercial and office occupancies will require a fire-flow consistent with the
Uniform Fire Code to service the proposed project. Fire hydrants shall be placed an
average of 400’ apart. 1997 UFC Appendix III-A
8. Multi-family residential on the site will require a fire-flow of 1500 GPM plus the
amount required by the fire sprinkler demand.
9. All access roads within the project shall have a clear driving surface with a minimum
width of 20’ available at all times. Restricted parking on some streets and access points
to fire lanes may be required to maintain a clear emergency access which is 20’ wide.
UFC 902.2.2.1
10. The phasing plan may require that any roadway greater than 150’ in length that is
not provided with an outlet shall be required to have a approved turn around.
11. The proposed 1107 unit subdivision with an estimated 2.9 residents per household
would have a total estimated population of 3,210 residents at build out. This will
generate an estimated 133 calls for service based on historical trends. The commercial,
schools and churches will have an unknown transient population and will have an
unknown impact on Meridian Fire Department call volumes. The Meridian Fire
Department has experienced 2069 responses in the year 2000 and 2251 calls for service
in 2001. According to a report completed by Fire & Emergency Services Consulting
Group in February of 2000 our requests for service are projected to reach 2800 in the
year 2005 and 3800 by the year 2010.
12. The proposed project lies on the edge of the five-minute response zone goal.
Achievement of this goal is subject to budgetary constraints and is intended to enhance
the probability of a favorable outcome on a request for Basic Life Support. The budget
constraints are typically defined as capital outlay for facilities that are located within 1.5
miles from a given location and sufficient operational funds to staff the facilities.
RECOMMENDATION TO CITY COUNCIL OF APPROVAL OF CONDITIONAL USE PERMIT FOR A
PLANNED DEVELOPMENT FOR PARAMOUNT SUBDIVISION BY PARAMOUNT, LLC – CUP-03-008 -
Page 5
13. It is requested that building separations be maintained per the Building Code in
Blocks 32, 33, 34, 35,30, 31, 36, 37 to reduce the possibility of fires being transmitted
from house to house.
D. Adopt the Recommendations of Central District Health Department as follows:
1. This proposal can be approved for central sewage & central water after written
approval from appropriate entities is submitted.
2. The Applicant’s central sewage and central water plans must be submitted to and
approved by the Idaho Department of Health & Welfare, Division of Environmental
Quality.
3. Run-off is not to create a mosquito breeding problem.
4. Stormwater shall be pretreated through a grassy swale prior to discharge to the
subsurface to prevent impact to groundwater and surface water quality.
5. The Engineers and architects involved with the design of the subject project shall
obtain current best management practices for stormwater disposal and design a
stormwater management system that prevents groundwater and surface water
degradation.
E. Adopt the Recommendations of ACHD as follows:
Site Specific Conditions of Approval
1. The applicant shall do one of the following requirements for Meridian Road:
a. Dedicate by donation an additional 10-feet of right-of-way along Meridian
Road, and construct a minimum 5-foot wide concrete sidewalk along Meridian
Road, located a minimum of 28-feet from the centerline of the right-of-way.
b. Do not dedicate additional right-of-way, but construct a minimum 5-foot
wide concrete sidewalk along Meridian Road, located a minimum of 28-feet from
the centerline of the right-of-way, in an easement provided to the District.
c. Do not dedicate additional right-of-way, but construct a minimum 5-foot
wide concrete sidewalk along Meridian Road, located at the back edge of the
existing right-of-way. Accomplish all necessary adjustments to properly
accommodate existing drainage and utilities.
2. The applicant shall do one of the following requirements for Linder Road:
RECOMMENDATION TO CITY COUNCIL OF APPROVAL OF CONDITIONAL USE PERMIT FOR A
PLANNED DEVELOPMENT FOR PARAMOUNT SUBDIVISION BY PARAMOUNT, LLC – CUP-03-008 -
Page 6
a. Dedicate by donation an additional 23-feet of right-of-way along Linder
Road, and construct a minimum 5-foot wide concrete sidewalk along Linder
Road, located a minimum of 41-feet from the centerline of the right-of-way.
b. Do not dedicate additional right-of-way, but construct a minimum 5-foot wide
concrete sidewalk along Linder Road, located a minimum of 41-feet from the
centerline of the right-of-way, in an easement provided to the District.
c. Do not dedicate additional right-of-way, but construct a minimum 5-foot wide
concrete sidewalk along Linder Road, located at the back edge of the existing
right-of-way. Accomplish all necessary adjustments to properly accommodate
existing drainage and utilities.
3. The applicant shall do one of the following requirements for McMillan Road:
a. Dedicate by donation an additional 10-feet of right-of-way along
McMillan Road, and construct a minimum 5-foot wide concrete sidewalk along
McMillan Road, located a minimum of 28-feet from the centerline of the right-of-
way.
b. Do not dedicate additional right-of-way, but construct a minimum 5-foot
wide concrete sidewalk along McMillan Road, located a minimum of 28-feet
from the centerline of the right-of-way, in an easement provided to the District.
c. Do not dedicate additional right-of-way, but construct a minimum 5-foot
wide concrete sidewalk along McMillan Road, located at the back edge of the
existing right-of-way. Accomplish all necessary adjustments to properly
accommodate existing drainage and utilities.
4. Construct West Studio Drive to intersect North Meridian Road approximately
1,300-feet north of McMillan Road, as proposed.
5. Construct West Producer Street to intersect Meridian Road approximately 2,470-
feet north of McMillan Road, as proposed.
6. Construct West Director Street to intersect Meridian Road approximately 960-feet
south of Chinden Boulevard, as proposed.
7. Construct West Paramount Drive approximately 2,420-feet south of Chinden
Boulevard to align with West Cayuse Avenue (a main entrance that was approved on May
22, 2002 as a part of Lochsa Falls Subdivision), as proposed.
8. Construct West Studio Drive to intersect McMillan Road approximately 1,260-
feet west of Meridian Road, as proposed.
RECOMMENDATION TO CITY COUNCIL OF APPROVAL OF CONDITIONAL USE PERMIT FOR A
PLANNED DEVELOPMENT FOR PARAMOUNT SUBDIVISION BY PARAMOUNT, LLC – CUP-03-008 -
Page 7
9. Relocate the intersections of West Dreyfus Street/Producer Avenue and the North
Lange Avenue/Producer Avenue to provide a minimum offset of 125-feet (measured from
centerline to centerline).
10. Construct:
North Cinema Way (from Chinden Boulevard to West Director Street),
West Director Street (from Meridian Road to North Cinema Way),
West Producer Street (from Meridian Road to North Mitchum Avenue),
West Studio Drive (from Meridian Road to McMillan Road) and
West Paramount Drive (from Linder Road to North Arliss Avenue)
as 40-foot street sections with vertical curb, gutter and 5-foot attached concrete sidewalk
within 54-feet of right-of-way.
11. Construct:
West Paramount Drive (from North Arliss Avenue to North Cinema Way),
North Bergman Avenue (from West Paramount Drive to the north property
line),
North Cinema Way (from West Director Street to West Colbert Street),
North Chaplin Drive (from North Cinema Way to North Cinema Way),
West Gable Street (from North Cinema Way to West Producer Street) and
West Producer Street (from North Mitchum Avenue to North Hopkins
Avenue)
as 36-foot street sections with rolled curb, gutter and 5-foot attached concrete sidewalk,
as proposed.
12. Construct the remainder of the internal roadways as 33-foot street sections with
curb, gutter, 5-foot attached concrete sidewalk and parking on both sides of the roadway
within 50-feet of right-of-way, as proposed. Submit documentation showing the review
and approval from the Meridian Fire Department.
13. Extend North Wayman Avenue as a stub street to the south property line
approximately 1,900-feet west of Meridian Road, as proposed. Install a sign at the
terminus of the roadway stating that, "THIS ROAD WILL BE EXTENDED IN THE
FUTURE".
14. Extend North Cinema Way as a stub street to the south property line
approximately 2,050-feet east of Linder Road, as proposed. Install a sign at the terminus
of the roadway stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE".
15. Extend North Bergman Avenue as a stub street to the north property line
approximately 1,220-feet east of Linder Road, as proposed. Install a sign at the terminus
of the roadway stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE".
***See Finding for Consideration B item #7.
RECOMMENDATION TO CITY COUNCIL OF APPROVAL OF CONDITIONAL USE PERMIT FOR A
PLANNED DEVELOPMENT FOR PARAMOUNT SUBDIVISION BY PARAMOUNT, LLC – CUP-03-008 -
Page 8
16. Extend North Arliss Avenue as a stub street to the north property line
approximately 820-feet east of Linder Road, as proposed. Install a sign at the terminus of
the roadway stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE".
17. Provide access to West Producer Street (by a stub street or by shifting the
roadway to the north) for the undeveloped parcels located directly to the north (the
Packard and Mastropaolo properties).
18. Construct a 16-foot wide residential alley between West Oliver Street and West
Peck Street and West Studio Drive and West Producer Street, as proposed. Improve the
alley its full width and provide a minimum of back-of-curb radius of 15-feet at all alley
intersections. Parking shall be designed so the minimum clear distance from the back of
the parking stall to the opposite side of the alley is 22-feet for perpendicular parking. Any
access to an alley shall be located a minimum of 25-feet from the nearest public street.
Parking in the alley is prohibited.
19. Construct a 16-foot wide residential alley between West Poitier Street and West
Peck Street and West Studio Drive and West Producer Street, as proposed. Iimprove the
alley its full width and provide a minimum of back-of-curb radius of 15-feet at all alley
intersections. Parking shall be designed so the minimum clear distance from the back of
the parking stall to the opposite side of the alley is 22-feet for perpendicular parking. An
access to an alley shall be located a minimum of 25-feet from the nearest public street.
Parking in the alley is prohibited.
20. Construct three roundabouts within the public right-of-way, as proposed.
On West Director Street (mid way between Meridian Road and
North Cinema Way)
At the intersection of Chaplin Street and North Dietrich Avenue
At the intersection of Cagney Street and North Dietrich Avenue
The roundabouts shall be designed with a minimum of a 21-foot street section on
either side of the center islands. The applicant will be required to dedicate
sufficient right-of-way on either side of an island. Coordinate the size and design
of the roundabouts with traffic services staff.
21. Do not construct a roundabout at the intersection of North Bergman Avenue and
Bacall Street unless a temporary turnaround is constructed at the terminus of North
Bergman Avenue or North Bergman Avenue will be extended at the time that this portion
of the preliminary plat is final platted.
22. Construct one knuckle with an island in the center, as proposed. Construct the
island to be a minimum of 4-feet wide with a minimum area of 100-square feet and
designed to safely channel traffic. The roadway around the traffic island shall maintain a
minimum of a 29-foot street section. The design shall be reviewed and approved by
ACHD's Traffic Services staff.
RECOMMENDATION TO CITY COUNCIL OF APPROVAL OF CONDITIONAL USE PERMIT FOR A
PLANNED DEVELOPMENT FOR PARAMOUNT SUBDIVISION BY PARAMOUNT, LLC – CUP-03-008 -
Page 9
23. When the District receives a formal application for the multi-family use and/or
the commercial use, the District will review and approve driveway locations in
accordance with the policies and guidelines that are in effect at that time. The District’s
current policies are provided for informational purposes only and can be found in
Findings for Consideration #9 on pages 13 and 14 of this report.
24. Construct a number of islands within the public right-of-way, as proposed.
Maintain minimum of a 21-foot street section on either side of the center islands. Any
proposed landscape islands/medians within the public right-of-way dedicated by this plat
shall be owned and maintained by a homeowners association. Notes of this shall be
required on the final plat
25. Construct a southbound left turn lane on Linder Road at the West Paramount
Drive/Linder Road intersection, as recommended by the submitted traffic impact study.
Prior to submittal of the final plat for the 201st residential lot, or the platting of the first
non-residential lot, whichever comes first, ACHD staff shall determine the need for
additional turn lane analysis to be provided by the applicant. As requested by ACHD, the
applicant’s traffic engineer shall submit a traffic analysis, which analyzes the need for
auxiliary lanes on the arterial roadways. The analysis should include all prior platted
lots, and those included to be platted with that phase. The traffic engineer shall evaluate
warrants based on District policy in effect at that time of submittal of the turn lane
analysis. Staff encourages the applicant to submit the turn lane analysis PRIOR to
submittal of the final plat, so that the platting process is not delayed, or major revisions
required. Further analysis may be required with each additional final plat, as determined
by ACHD staff, to make certain the turn lanes are constructed as needed.
26. Construct a northbound right turn lane on Linder Road at the West Paramount
Drive/Linder Road intersection, as recommended by the submitted traffic impact study.
Prior to submittal of the final plat for the 201st residential lot, or the platting of the first
non-residential lot, whichever comes first, ACHD staff shall determine the need for
additional turn lane analysis to be provided by the applicant. As requested by ACHD, the
applicant’s traffic engineer shall submit a traffic analysis, which analyzes the need for
auxiliary lanes on the arterial roadways. The analysis should include all prior platted
lots, and those included to be platted with that phase. The traffic engineer shall evaluate
warrants based on District policy in effect at that time of submittal of the turn lane
analysis. Staff encourages the applicant to submit the turn lane analysis PRIOR to
submittal of the final plat, so that the platting process is not delayed, or major revisions
required. Further analysis may be required with each additional final plat, as determined
by ACHD staff, to make certain the turn lanes are constructed as needed.
27. Construct an eastbound left turn lane on McMillan Road at the West Studio
Drive/McMillan Road intersection, as recommended by the submitted traffic impact
study. Prior to submittal of the final plat for the 201st residential lot, or the platting of the
first non-residential lot, whichever comes first, ACHD staff shall determine the need for
additional turn lane analysis to be provided by the applicant. As requested by ACHD, the
RECOMMENDATION TO CITY COUNCIL OF APPROVAL OF CONDITIONAL USE PERMIT FOR A
PLANNED DEVELOPMENT FOR PARAMOUNT SUBDIVISION BY PARAMOUNT, LLC – CUP-03-008 -
Page 10
applicant’s traffic engineer shall submit a traffic analysis, which analyzes the need for
auxiliary lanes on the arterial roadways. The analysis should include all prior platted
lots, and those included to be platted with that phase. The traffic engineer shall evaluate
warrants based on District policy in effect at that time of submittal of the turn lane
analysis. Staff encourages the applicant to submit the turn lane analysis PRIOR to
submittal of the final plat, so that the platting process is not delayed, or major revisions
required. Further analysis may be required with each additional final plat, as determined
by ACHD staff, to make certain the turn lanes are constructed as needed.
28. Construct a westbound right turn lane on McMillan Road at the West Studio
Drive/McMillan Road intersection, as recommended by the submitted traffic impact
study. Prior to submittal of the final plat for the 201st residential lot, or the platting of the
first non-residential lot, whichever comes first, ACHD staff shall determine the need for
additional turn lane analysis to be provided by the applicant. As requested by ACHD, the
applicant’s traffic engineer shall submit a traffic analysis, which analyzes the need for
auxiliary lanes on the arterial roadways. The analysis should include all prior platted
lots, and those included to be platted with that phase. The traffic engineer shall evaluate
warrants based on District policy in effect at that time of submittal of the turn lane
analysis. Staff encourages the applicant to submit the turn lane analysis PRIOR to
submittal of the final plat, so that the platting process is not delayed, or major revisions
required. Further analysis may be required with each additional final plat, as determined
by ACHD staff, to make certain the turn lanes are constructed as needed.
29. Construct a northbound left turn lane on Meridian Road at the West Studio
Drive/Meridian Road intersection, as recommended by the submitted traffic impact study.
Prior to submittal of the final plat for the 201st residential lot, or the platting of the first
non-residential lot, whichever comes first, ACHD staff shall determine the need for
additional turn lane analysis to be provided by the applicant. As requested by ACHD, the
applicant’s traffic engineer shall submit a traffic analysis, which analyzes the need for
auxiliary lanes on the arterial roadways. The analysis should include all prior platted
lots, and those included to be platted with that phase. The traffic engineer shall evaluate
warrants based on District policy in effect at that time of submittal of the turn lane
analysis. Staff encourages the applicant to submit the turn lane analysis PRIOR to
submittal of the final plat, so that the platting process is not delayed, or major revisions
required. Further analysis may be required with each additional final plat, as determined
by ACHD staff, to make certain the turn lanes are constructed as needed.
30. Construct a southbound right turn lane on Meridian Road at the West Studio
Drive/Meridian Road intersection, as recommended by the submitted traffic impact study.
Prior to submittal of the final plat for the 201st residential lot, or the platting of the first
non-residential lot, whichever comes first, ACHD staff shall determine the need for
additional turn lane analysis to be provided by the applicant. As requested by ACHD, the
applicant’s traffic engineer shall submit a traffic analysis, which analyzes the need for
auxiliary lanes on the arterial roadways. The analysis should include all prior platted
lots, and those included to be platted with that phase. The traffic engineer shall evaluate
RECOMMENDATION TO CITY COUNCIL OF APPROVAL OF CONDITIONAL USE PERMIT FOR A
PLANNED DEVELOPMENT FOR PARAMOUNT SUBDIVISION BY PARAMOUNT, LLC – CUP-03-008 -
Page 11
warrants based on District policy in effect at that time of submittal of the turn lane
analysis. Staff encourages the applicant to submit the turn lane analysis PRIOR to
submittal of the final plat, so that the platting process is not delayed, or major revisions
required. Further analysis may be required with each additional final plat, as determined
by ACHD staff, to make certain the turn lanes are constructed as needed.
31. Construct a northbound left turn lane on Meridian Road at the West Producer
Street/Meridian Road intersection, as recommended by the submitted traffic impact
study. Prior to submittal of the final plat for the 201st residential lot, or the platting of the
first non-residential lot, whichever comes first, ACHD staff shall determine the need for
additional turn lane analysis to be provided by the applicant. As requested by ACHD, the
applicant’s traffic engineer shall submit a traffic analysis, which analyzes the need for
auxiliary lanes on the arterial roadways. The analysis should include all prior platted
lots, and those included to be platted with that phase. The traffic engineer shall evaluate
warrants based on District policy in effect at that time of submittal of the turn lane
analysis. Staff encourages the applicant to submit the turn lane analysis PRIOR to
submittal of the final plat, so that the platting process is not delayed, or major revisions
required. Further analysis may be required with each additional final plat, as determined
by ACHD staff, to make certain the turn lanes are constructed as needed.
32. Construct a southbound right turn lane on Meridian Road at the West Producer
Street/Meridian Road intersection, as recommended by the submitted traffic impact
study. Prior to submittal of the final plat for the 201st residential lot, or the platting of the
first non-residential lot, whichever comes first, ACHD staff shall determine the need for
additional turn lane analysis to be provided by the applicant. As requested by ACHD, the
applicant’s traffic engineer shall submit a traffic analysis, which analyzes the need for
auxiliary lanes on the arterial roadways. The analysis should include all prior platted
lots, and those included to be platted with that phase. The traffic engineer shall evaluate
warrants based on District policy in effect at that time of submittal of the turn lane
analysis. Staff encourages the applicant to submit the turn lane analysis PRIOR to
submittal of the final plat, so that the platting process is not delayed, or major revisions
required. Further analysis may be required with each additional final plat, as determined
by ACHD staff, to make certain the turn lanes are constructed as needed.
33. Construct a northbound left turn lane on Meridian Road at the West Director
Street/Meridian Road intersection, as recommended by the submitted traffic impact
study. Prior to submittal of the final plat for the 201st residential lot, or the platting of the
first non-residential lot, whichever comes first, ACHD staff shall determine the need for
additional turn lane analysis to be provided by the applicant. As requested by ACHD, the
applicant’s traffic engineer shall submit a traffic analysis, which analyzes the need for
auxiliary lanes on the arterial roadways. The analysis should include all prior platted
lots, and those included to be platted with that phase. The traffic engineer shall evaluate
warrants based on District policy in effect at that time of submittal of the turn lane
analysis. Staff encourages the applicant to submit the turn lane analysis PRIOR to
submittal of the final plat, so that the platting process is not delayed, or major revisions
RECOMMENDATION TO CITY COUNCIL OF APPROVAL OF CONDITIONAL USE PERMIT FOR A
PLANNED DEVELOPMENT FOR PARAMOUNT SUBDIVISION BY PARAMOUNT, LLC – CUP-03-008 -
Page 12
required. Further analysis may be required with each additional final plat, as determined
by ACHD staff, to make certain the turn lanes are constructed as needed.
34. Construct a southbound right turn lane on Meridian Road at the West Director
Street/Meridian Road intersection, as recommended by the submitted traffic impact
study. Prior to submittal of the final plat for the 201st residential lot, or the platting of the
first non-residential lot, whichever comes first, ACHD staff shall determine the need for
additional turn lane analysis to be provided by the applicant. As requested by ACHD, the
applicant’s traffic engineer shall submit a traffic analysis, which analyzes the need for
auxiliary lanes on the arterial roadways. The analysis should include all prior platted
lots, and those included to be platted with that phase. The traffic engineer shall evaluate
warrants based on District policy in effect at that time of submittal of the turn lane
analysis. Staff encourages the applicant to submit the turn lane analysis PRIOR to
submittal of the final plat, so that the platting process is not delayed, or major revisions
required. Further analysis may be required with each additional final plat, as determined
by ACHD staff, to make certain the turn lanes are constructed as needed.
35. Construct a westbound right turn lane on West Studio Drive at the West Studio
Drive/McMillan Road intersection, as recommended by the submitted traffic impact
study.
36. Construct an exclusive eastbound left turn lane on West Studio Drive at the West
Studio Drive/McMillan Road intersection, as recommended by the submitted traffic
impact study.
37. Construct an exclusive northbound left turn lane on West Studio Drive at the West
Studio Drive/Meridian Road intersection, as recommended by the submitted traffic
impact study.
38. Construct an exclusive southbound right turn lane on West Studio Drive at the
West Studio Drive/Meridian Road intersection, as recommended by the submitted traffic
impact study.
39. Construct an exclusive northbound left turn lane on West Producer Street at the
West Producer Street/Meridian Road intersection, as recommended by the submitted
traffic impact study.
40. Construct an exclusive southbound right turn lane on West Producer Street at the
West Producer Street/Meridian Road intersection, as recommended by the submitted
traffic impact study.
41. Construct an exclusive northbound left turn lane on West Director Drive at the
West Director Drive/Meridian Road intersection, as recommended by the submitted
traffic impact study.
RECOMMENDATION TO CITY COUNCIL OF APPROVAL OF CONDITIONAL USE PERMIT FOR A
PLANNED DEVELOPMENT FOR PARAMOUNT SUBDIVISION BY PARAMOUNT, LLC – CUP-03-008 -
Page 13
42. Construct an exclusive southbound right turn lane on West Director Drive at the
West Director Drive/Meridian Road intersection, as recommended by the submitted
traffic impact study.
43. Construct an exclusive northbound right turn lane on West Paramount Drive at the
West Paramount Drive/Linder Road intersection, as recommended by the submitted
traffic impact study.
44. Construct a combined through/southbound left turn lane on West Paramount
Drive at the West Paramount Drive/Linder Road intersection, as recommended by the
submitted traffic impact study.
45. Submit District a letter from ITD regarding the said requirements prior to District
approval of the final plat or issuance of a building permit (or other required permits),
whichever occurs first.
46. Other than the access points specifically approved with this application, direct lot
access to Meridian Road, Linder Road and McMillan Road is prohibited unless otherwise
approved by the Ada County Highway District. These restrictions shall be noted on the
final plat.
47. Comply with all Standard Conditions of Approval.
Standard Conditions of Approval
1. Any existing irrigation facilities shall be relocated outside of the right-of-way.
2. All utility relocation costs associated with improving street frontages abutting the
site shall be borne by the developer.
3. Replace any existing damaged curb, gutter and sidewalk and any that may be
damaged during the construction of the proposed development. Contact Construction
Services at 387-6280 (with file number) for details.
4. Utility street cuts in pavement less than five years old are not allowed unless
approved in writing by the District. Contact Construction Services at 387-6280 (with file
numbers) for details.
5. All design and construction shall be in accordance with the Ada County Highway
District Policy Manual, ISPWC Standards and approved supplements, Construction
Services procedures and all applicable ACHD Ordinances unless specifically waived
herein. An engineer registered in the State of Idaho shall prepare and certify all
improvement plans.
RECOMMENDATION TO CITY COUNCIL OF APPROVAL OF CONDITIONAL USE PERMIT FOR A
PLANNED DEVELOPMENT FOR PARAMOUNT SUBDIVISION BY PARAMOUNT, LLC – CUP-03-008 -
Page 14
6. The applicant shall submit revised plans for staff approval, prior to issuance of
building permit (or other required permits), which incorporates any required design
changes.
7. Construction, use and property development shall be in conformance with all
applicable requirements of the Ada County Highway District prior to District approval
for occupancy.
8. Payment of applicable road impact fees are required prior to building construction
in accordance with Ordinance #197, also known as Ada County Highway District Road
Impact Fee Ordinance.
9. It is the responsibility of the applicant to verify all existing utilities within the
right-of-way. Existing utilities damaged by the applicant shall be repaired by the
applicant at no cost to ACHD. The applicant shall be required to call DIGLINE (1-800-
342-1585) at least two full business days prior to breaking ground within ACHD right-of-
way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any
ACHD conduits (spare or filled) are compromised during any phase of construction.
10. No change in the terms and conditions of this approval shall be valid unless they
are in writing and signed by the applicant or the applicant’s authorized representative and
an authorized representative of the Ada County Highway District. The burden shall be
upon the applicant to obtain written confirmation of any change from the Ada County
Highway District.
11. Any change by the applicant in the planned use of the property which is the
subject of this application, shall require the applicant to comply with all rules,
regulations, ordinances, plans, or other regulatory and legal restrictions in force at the
time the applicant or its successors in interest advises the Highway District of its intent to
change the planned use of the subject property unless a waiver/variance of said
requirements or other legal relief is granted pursuant to the law in effect at the time the
change in use is sought.
F. Adopt the Recommendations of Settlers’ Irrigation District as follows:
1. That all irrigation/drainage facilities along with their easements be protected and
continue to function as such. The laterals involved are the North Slough #2, North
Slough, Knight, Lemp, Harrell, Wolf, and Bisby.
2. A license agreements will need to be signed and recorded prior to construction of
any irrigation facilities.
3. All Storm drainage must be retained on-site.
RECOMMENDATION TO CITY COUNCIL OF APPROVAL OF CONDITIONAL USE PERMIT FOR A
PLANNED DEVELOPMENT FOR PARAMOUNT SUBDIVISION BY PARAMOUNT, LLC – CUP-03-008 -
Page 15
4. Any changes to the existing irrigation system must be approved by Settlers
Irrigation District.
5. The development must supply irrigation access to all lots within the above-
mentioned subdivision. If the developer wishes to have Settlers Irrigation District own,
operate, and maintain the pressure irrigation system an agreements needs to be in place
prior to the pre-construction meeting.