Loading...
HomeMy WebLinkAboutAddendum No. 1 to Task Order 2.1 with JUB Engineers for Authorization for Additional Services for Ten Mile Creek Sewer Crossing(~j Uf J-U-~ ENGINEEl45, lnc. 250 S. Beechwood Avenue, Suite 201 • Boise, Idaho 83709-0944 • Telephone (208) 376-7330 • FAX (208) 323-9336 AIJTHORIZATION FOR ADDITIOIVAL SERVICES - NO. 1 CLIENT: CITY OF MERIDIAN PROJECT NAME: Ten Mile Creek Sewer Crossinq J-U-B Project Number: 10-08-011 The following additional items of work on the project referenced above have been or will be provided by J-U-B ENGINEERS, Inc. These additional services are a supplement to the scope of services contained in J-U-B's existing Master Agreement for Engineering Services for this project approved bv Citv Council on December 12 2006 and Task Order 2 1 aqaroved bv Citv Council on Februarv 26. 2008. Additional Services: J-U-B ENGINEERS, Inc. was verbally authorized to provide these services by: n/a n/a Name Date Dated this ~°~~ day of , 2008. Citv of Meridian J-U-B ENGINEfRS, In~. Print or Type Client Name ~~/ l~ By~ By~ ~ ~ Client or Re e ntative Signature Project epresentative Signature Tammv de Weerd, Mavor ~-~~+~~~~~~+~p~illip H. Krichbaum, P.E. - Proiect Manaqer Print or Type Name and Title `\``\\~~~~{ ~~~~,,~~','' Print or Type Name and Title d ~,~ ~i .; Attest: o Jaycee Ho man, City Clerk _ gEAL = ; , ,$~ '';9 ~T ts~ • ~O`,~; ,,~Q~ \AQ. ,~~. ~'~% ~f~~f ~ '''~~,,,~ ~~ ~, ~ ~,~~~'' aYl' Unless otherwise noted below, J-U-B ENGINEERS, Inc. will provide these additional services on a time and materials basis, using the Firm's standard billing rates, or if applicable, the billing rates established in the initial Agreement for Engineering Services. J-U-B ENGINEERS, Inc. Attachment 'A' - f0-08-011 CITY OF MERIDIAN TEN MILE CREEK SEWER CROSSING REPLACEMENT Addendum No. 1 to Task Order No. 2.1 ATTACHMENT "A" - FEE SCHEDULE Basis of Fee and Billin~ Schedule The City shall pay J-U-B for its services and reimbursable expenses as follows. A labor and equipment detail is presented in Exhibit "B-2": Task A - Project Meetings • Task A- Project Meetings (Time and Materials) Original Estimated Bud~et ............................:............................................. $695 Addendum No. 1 ....................................................................................... 363 Revised Task Order Amount ...................................................................... $1,058 Task B- Feasibility Analysis - COMPLETE • Task B- Feasibility Analysis (Lump Sum) Original Lump Sum Price .................................................................:....... $3,288 Task C- Preliminary and Final Design - TO BE COMPLETED UNDER SEPARATE TASK ORDER • Task C- Trunk Sewer (Lump Sum) Original Lump Sum Price ........................................................................ $16,850 Addendum No. 1 ................................................................................ < 16 850> Revised Task Order Amount ............................................................................ $0 Task D- Trunk Sewer Additional Services - TO BE COMPLETED UNDER SEPARATE TASK ORDER • Tasks D- Additional Services (Time and Materials) Original Estimated Budget ........................................................................ $3,578 Addendum No. 1 ................................................................................. < 3 578> Revised Task Order Arnount ............................................................................ $0 Task E- Agency Coordination and Permitting • Tasks E- Agency Coordination and Permitting (Time and Material) Original Estimated Budget ........................................................................ $7,202 Addendum No. 1 ....................................................................................... 469 Revised Task Order Amount ...................................................................... $7,671 Task F - Easement Coordination • Task F- Easement Coordination (Time and Materials) Ori~inal Estimated Bud~et .....................................................................:. $2,085 Addendum No. 1 .................................................................................... 1 817 Revised Task Order Amount ...................................................................... $3,837 Ciry of Meridian - Ten Mi[e Creek Sewer Crossing Replacement ppge _~ Task Order 2.1, Addendum No. 1 Page 1 of 1 Task Order No. 2.1 Addendum No. 1- Exhibit B CITY OF MERIDIAN - TEN MILE CREEK TRUNK SEWER CROSSING ADDENDUM NO. 1- ADDITIONAV(REDUCED) LABOR AND EQUIPMENT DE7AIL Rroject P~oject SWcturel ~ Survey Easement ~ 2- Man GPS Manager/OC.Engineer Engineer EIT PLS Tech. iNegotiator Drattsman Clerical Survey Equip. SuDCOnsultant TASK A rox. Em lo ee Hourl Pa Rate ~553.84 $44.37 ~ $42.14 . $23.57 . ~$47.27 $22.34 , $27.50 . $17.00 $14.50 $45.00 $50:00 ~ TOTlLL TASK A- RROJECT MEETiNGS ( t&M) ` ~ 1 Pro ress/Revlew Meelin 1 assumetl ~~! 2 P~o e Owner Meelin s 2 assumed q TOTAL TASK A Q.0 0:0 0.0 ; 0.0 ~' OA 0,0 y 4.U 0.0 ~ 0.0 0.0 0.0 ' $0 $363 ' ORIGINAL TASK ORDER AMOWNT: $695 ' REVISEU TASK ORUEH AMOUNT: $1,058 i/1SK B.- FEIISIBILI7'Y ANALYSIS ( LUMP SUM) - COMPL ETE ~ 1 ~Feaslbili Mal sis ~ Evetuate Re lacement Methods Evaluate Pipe Materials Evaluate Alternate TrunkLOCatioNAli nment Letler Re ort - TUTAL TASK B 0.0 0.0 OA 0:0 0.0 ' UA = OA 0-0 0.0 OA ' 0.0 $0 $0 ORIGINAL TASK ORUER AMOUNT: $3,288 R_EVISE_D TASK ORUER AMOUN7: $3,288 TASK C- PRELIMINARY AND FI_NAL DESIGN (LUMP SUM) ~ ~ TOTAL TASK C 12.25 2L.5 9.0 52.5 '(3.5 (7.5 : OA 56.0) f2.U 8.0) 8.0 $0 $19,793 ORIGINAL TASK OFiDER AMUUNT: $79,793 REVISEU TASK ORUER AMOUNT: $0 TASK U- TRUNK SEWEH ADDITIONAL SERVICES (T&M ~ ~ ,. ~ TOTAI TASK D O:Q 0.0 ; 0.0 ' (1.00) 0.0 OA 0.0 OA 0.0 0:0 U.0 , ($3,500) ' ($3,578) ORIGINICL TASK URDER AMOUNT: $3,576 • REVISED TASK ORDER AMOUNT: $0 TASK E- AGENCY COORDINATION AND PERMITTING (T &M) ~ 1 DralnageVr~igatlon Distrlcl CoorCination anAPermltt in Site Meetin & Corres ondence ~ . repare run ewer ~ icense greemen s- assumetl), Coordination ~ SUBTOTAL E. - 0 0 0 0 0 0 0 0 -D ~ D 0 0 0 ~ 2 USCOE404 Coortlinatlon & Permitting - Site Meetin - Adtlitional Fieltl To o. Surve Pre are A Iication Exhibits, Plan, Sections, Details ~ - ~ Pre are USCOE antl IDWq Permittin - Iication IDL Le al Descri tion and~Exhibils 7 legal ~ ~ ~ SUBTOTAL E.2 0 .- - 0 0 ~ 0 0 0 0 0 0 ~ 0 0 0 0 3 IDEU SUBMIITAL PACKAGE tt~Necessa - Pre are Trunk Sewer Submittal Packa e Incor orate TrunK Sewer Review Comments ~ SU870TAL~E:3 . 0 0 0 0 0 ~ 0 -0 0 0 0 0 0 0 4 PLOODPLAIN DEVELOPMENT PERMR Pre are Flootl lain Develo ment Permit ~ SUBTOT EA 0.5 D.5 1 1 0 3 3 - 0 0 0 - 0 ~ 0 0 - -~0 0 ~ 469 TOTAL TASK E ' 1'.0 2A 0.0 ' 6,0 0.0 0.0 • 0.0 ' 0.0 0:0 ' 0.0 . 0~0 $U $469' ORIGINAL TASK URDE REVISED TASK ORUE R /1MOUNT: $7,202 R AMOUNT: $7,671 TASK F - EASEMENT COORDINA'f10N (T&M) ~~ ~ . t EasemenT.ldenqfication antl Prelimina Ezhibits ~ Easement Identification ' (0.5) . - Pre ie Preliminary Easement Ma s- Research Ownershi suerorr~ F.i o.o ~os~ o.o o.o (0.5) ~os~ o.o o:o o.o o.o o.o o.o o.o se ~ 2 Easementlegal'Desari tions - Pre are Le al Descri tions and~Exhibits 2 arcels 0.75 Z.p p.5 - (D00S not InCIU08 litle re OAS Or e raisals - SUBTO F.2 0:0 OJS 0:0 ~ 0.0 0:0 2.0 - 0.0 2S ~ 0:0 0.0 0.0 ~OA . ~ 98 3 Pro rty ~Owner'Meeqngs antl Negotlatlons Pro erty Owner Meelin s 2 owners, 2meetin s (2.p) . q,p EasemeMNe otiatians (i.0) 4.0 2A) 10.0 Pre are EasementAC u(sidon Dauments ---- ~ S BTOT .3 ~ (3.0) 1A . SA~ OA ~ (2.0) 0:0 0:0 2.0 16.0 0:0 0.0 0.0 0.0 OA ~$1,488 TOTAL TASK F (3.0)' 5.5" 0:0 (2.0) (1.0) ;' 4A f 16:0 ; 5.0 , 0.0 ' 0,0 0.0 ' OA $1,817 ORIGINAL TASK ORDER HEVISED TASK OHDE AMOUNT: $2,085 R AMOUNT: $3,903 -_ Amended Task Order 2.1 Tetale at5 oto - ~ GSk ~raer 2.1: +~3;1~0 __._-- ,(J ~4~/q11110ih/lf : 52~ (0'~9 ~Yk J-U-B ENGINEERS, Inc. GITY OF MERIDIAN TEN MILE CREEK SEWER CROSSING REPLACEMENT Addendum No. 1 to Task Order 2.1 ' EXHIBIT "C" Amended Items to Scope of Engineering Services Proiect Understandin~ The following is J-U-B's understanding of the Project. Exhibit 'A' - 10-OS-011 The City of Meridian identified a segment of the Ten Mile Trunk, crossing Ten Mile Creek, that has failed or is nearing failure. The aerial sewer crossing is an un-sleeved 15-inch diameter steel carrier pipe. A feasibility analysis to determine a preferred replacement method, pipe material(s), and alignment was completed and approved by the City. The project indudes design of the replacement and upsizing of the 15-inch Ten Mile Trunk Sewer Crossing. The feasibility analysis recommended a new aerial sewer crossing (21" PVC sewer in steel casing) of Ten Mile Creek approximately 80 feet east of the existing crossing. The project will also include approximately 90 lineal feet of parallel sewer in W. Kimra Street and tie-in to existing manhole near the intersection of W. Kimra Street and S. Heidi Place. The project does not include hydraulic modeling of the sanitary sewer system or Ten Mile Creek. Task E- A~encv Coordination and Permittin~ 1. A~ency Coordination and Permittin~ D. City of Meridian Floodplain Development Application J-U-B will prepare a Floodplain Development Apptication for submittal to the City of Meridian Building Department. For this Scope of Services, it is assumed that neither establishment of a base flood elevation (BFE) nor a°no-rise certification" is required. City of Meridian - Ten Mile Creek Sewer Crossing Replpcement pa8e _ 1 Task Order 2.1, Addendum No. 1