Loading...
HomeMy WebLinkAboutTask Order No. 0768 with Murray, Smith and Associates for Water Master Plan Addendum associated with switching Well 14 to Zone 4EXHIBIT A TASK ORDER NO. 0768 WATER MASTER PLAN ADDENDUM ASSOCIATED WITH SWITCffiNG WELL 14 TO ZONE 4 CITY OF MERIDIAN This Scope of Services is for Professional Services between Murray, Smith & Associates Inc. (MSA) and the City of Meridian. Services authorized by this Task Order No.3 shall be for professional engineering services in support of the City's Water System. The terms of this Task Order shall be in accordance with the MSA Master Agreement for Professional Services dated June 18, 2007. Background A Water Master Plan Update (WMP) was completed for the City of Meridian in May of 2006 and was subsequently approved by the Idaho Department of Environmental Quality (IDEQ). Many of the requirements listed in the updated IDAPA 58.01.08.502 were addressed in that plan; however, a comprehensive evaluation of the City's water infrastructure in terms of redundancy and storage was subsequently required by IDEQ. A redundancy analysis was prepared by MSA in January of 2008 and was subsequently approved by the City and IDEQ. . The City is now preparing to switch Well 14 from Zone 3 to Zone 4. IDEQ has notified the City that an addendum to their master plan will be required for this change. The addendum is required to document that the City will still have adequate supply to all areas of the system in particular Zone 3. Documentation of adequate backup power and distribution capacity will also be required. SCOPE OF SERVICES Task -1 Provide an addendum to the 2006 WMP that evaluates the adequacy of the system to supply and distribute water under average, peak, and fire flow conditions after Well 14 has been switched to Zone 4. This will include an evaluation of the standby power available in each zone and system-wide. It will also provide a description of how the distribution system will transfer water between zones as needed to meet peak or fire flow demands. The addendum will be prepared in technical memorandum format that can be attached to the existing WMP document. Up to two (2) iterations to address IDEQ comments have been included in the budget, which includes time for face to face and phone meetings. Assumptions: Demand information available in the 2006 WMP will be used for the evaluation. The "Redundancy" evalua.tion provided to IDEQ in early 2008 will be used City of Meridian MURRAY, SMITH & ASSOCIATES, INC. Task Order No.0768 May 2008 Engineers/Planners as a basis for this addendum. 2007 total production numbers will be provided by the City to validate projections provided in the 2006 WMP. No time to redistribute demand between pressure zones is included in this scope. If demand distribution information can be provided by the City it will be utilized to update the zonal demands. City Staff will provide hydraulic modeling validations on providing peak and fire flows if required by IDEQ. Water production numbers will be verified for each well and booster station. Deliverables: A draft addendum to the 2006 WMP will be prepared for IDEQ that will address the Facility Plan Requirements of the "Idaho Rules for Public Drinking Water Systems" per IDAPA 58.01.08.502, specifically in regards to supplying and distributing water in the system once Well 14 is switched to Zone 4. After City review and comments, a final technical memorandum will be submitted to the IDEQ. City of Meridian MURRAY, SMITH & ASSOCIATES, INC. Task Order No.0768 May 2008 Engineers/Planners BUDGET The overall Not-to-Exceed Budget for this task is shown in Table 1. The work will be billed on a time and expenses basis under the terms of the MSA Master Agreement for Professional Services. The total budget shall not be exceeded without written authorization. Table 1 Labor Hours and Total Project Costs Task Number Labor Hours Total Cost Task 1- Provide Master Plan Addendum 70 $10,000 Project Totals 70 $10,000 TIME OF PERFORMANCE The completion date for this Task Order is 60 calendar days from Authorization to Proceed. MSA will make every effort to complete the work in a timely manner; however, it is agreed that MSA cannot be responsible for delays occasioned by factors beyond its control, nor by factors that could not reasonably have been foreseen at the time this Task Order was executed. ~~ f,~ ``,~~,,,, ~ ~ ~ ~ ~ ~ ~ ~ ~,,,,~~`~ ~<~ Tammy de We , Mayor ``~~~`~.~`~ ~ -" "~/ ~~'~,,~~ .~ ~ ~ ~ O~ `~~ ~ ~°'~O ~ Date: Attest: $~iAL Jaycee olman, City Clerk ; ~ ~ ~ .' Date: ' f~~ C~~ '~~~~9e_ t~~C •, P,~`~,~` ~ ' ~~~ ~ ,,,~%''~~„-~~~,~~~``,.~`'~~ Approved by City Council: Murray, Smith & A sociates Inc. By: Title: A, o~ ~ ~ U ~ ~ ~ Date: ~~2U/~ City of Meridian MURRAY, SMITH & ASSOCIATES, INC. Task Order No.0768 May 2008 Engineers/Planners