May 27, 2008
To: James R. Wylie
1676 N. Clarendon Way
Eagle, ID 83616
Subject: Knighthill Center /MPP-08-005
1~~~~
Carol A. McKee, President
Sherry R. Huber, 1st ice President
Dave Bivens, 2nd Vice President
John S. Franden, Commissioner
Rebecca W. Amold, Commissioner
~,EGEIVEj)
MAY 3 0 2008
CITY OF MERIDIAN
CITY CLERK nF~ICF
This is a staff level approval of a preliminary plat for Knighthill Center. On March 22, 2006 the Ada
County Highway District reviewed and approved a preliminary plat (MPP-06-005) proposed to contain
four commercial building lots and one common lot. The District had site specific requirements related to
right-of-way dedication, street improvements, and access to Linder Road. The same conditions and
restrictions apply to the proposed condominium plat.
The applicant has proposed not to change any of the access points that have previously been approved.
The District has no additional comments at this time.
The applicant will be required to pay all applicable platting and review fees prior to final approval.
If you have any questions, please feel free to contact me at 208-387-6177.
Sincerely,
ChP~Gt ~~C(.t~
Chelsee Kucera
Planning Intern
Right-of-way & Development Services
CC: Project file,
City of Meridian
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achd.ada.id.us
Submit a development application to a City or to the County
®The City or the County will transmit the development application to ACRD
®The ACHD Planning Review Division will receive the development application to review
®The Planning Review Division will do one of the following:
^Send a "No Review" letter to the applicant stating that there are no site specific requirements at this
time.
^Send a "Comply With" letter to the applicant stating that if the development is within a platted
subdivision or part of a previous development application and that the site specific requirements from the
previous development also apply to this development application.
®Write a Staff Level report analyzing the impacts of the development on the transportation system and
evaluating the proposal for its conformance to District Policy.
^Write a Commission Level report analyzing the impacts of the development on the transportation
system and
evaluating the proposal for its conformance to District Policy.
®The Planning Review Division will hold a Technical Review meeting for all Staff and Commission Level reports.
^For ALL development applications, including those receiving a "No Review" or "Comply With" letter:
• The applicant should submit iwo (2) sets of engineered plans directly to ACHD for review by the
Development Review Division for plan review and assessment of impact fees. (Note: if there are no
site improvements required by ACHD, then architectural plans may be submitted for purposes of impact
fee calculation.)
• The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-
way, including, but not limited to, driveway approaches, street improvements and utility cuts.
^Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval.
DID YOU REMEMBER:
Construction (Zone)
^ Driveway or Property Approach(s)
• Submit a "Driveway Approach Request" form to Ada County Highway District (ACHD) Construction (for
approval by Development Services & Traffic Services). There is a one week turnaround for this approval.
^ Working in the ACHD Right-of-Way
• Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit
Application" to ACHD Construction -Permits along with:
a) Traffic Control Plan
b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50'
or you are placing >600 sf of concrete or asphalt.
Construction (Subdivisions)
^ Sediment 8 Erosion Submittal
• At least one week prior to setting up a Pre-Con an Erosion & Sediment Control Narrative & Plat, done by a
Certified Plan Designer, must be turned into ACRD Construction -Subdivision to be reviewed and approved by
the ACRD Drainage Division.
^ Idaho Power Company
• Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con
being scheduled.
^ Final Approval from Development Services
ACHD Construction -Subdivision must have received approval from Development Services prior to scheduling aPre-
Con.
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achd.ada.id.us