HomeMy WebLinkAboutChange Order No. 1 with DC Engineering for PRV SCADA for Pressure Zone 1 Meridian Water Dept.CITY OF MERIDIAN 33 EAST IDAHO MERIDIAN, ID 83642 CONTRACT CHANGE ORDER Change Order No.: ~ Project Number: 0659 Date: 5/1/2008 Effective Date: CONTRACTOR: DC Engineering PROJECT: Pressure Zone 1 The Contractw is hereby dlrected to make the following changes from the Contract Dacuments and Plans. Desciption: 1) Relocation of 5 PRV's 2) Redesign of the PLC and radio system Reason for Change Order: Adclitional services Attachments: Request for change order from contractor CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price: $8,340.00' Original Contract Completion Date: Original ConUact Completion Days: Net changes fortn previous C.O.'s.: Net Days change form previous C.O.'s: No. Q to 0 No. 0 to 0 $0.00 Contract Price Priar to this C.O,: Contract Completion Date before this C.O.: $8, 340.00 Net Increase (decrease) of this C.O.: Net Days Increase (decrease) of this C.O.: $4, 500.00 Contract Prica with all Approved C.O.'s: Contract Completion Date with all Approved C.O.'s: $12,840:00 RECOMMENDED: (CONSTRUCTION MANAGER) ACCEPTED (CONTRACTOR) BY:~t ~~P BY: t.a,~s ~.dd~~~ Date: ~j ~OII OS Date: s~ g/Q g APPRO~V P ING AGENn COUNCIL APPROVAL By: K i atts ~ Date: ```````,~i~~niiiitir~~~~'''' . i N /\ ~ ~ _ Date: ``~• ~ i~~ ~-~ ~ APPROVE • 17'Y) ATTEST: ~ '~ , ~ By: Mayor Ta y eerd~~' By: City Clerk, Jaycee Ho~nan BEAL - Date: ~ , O~ Date: 5~ ~, Q~YY 7 ~ : ~~~~~; ~ -s T 1 S~ , ~~``~~~ ,,~~~~~~Y , ~,~.~~. ~~ ENG/NEER/NG April 24, 2UU8 Mr. Kyle Radek City of Meridian Public Works 660 E Water Tower Suite 2U0 Meridian, ID 83642 Subject: Meridian Water Dept. PRV SCADA Additional Services Mr. Radek, 440 E. Corporate Drive Suite 103 Meridian, Idaho 83642 Phone: 208.288.2181 Fex: 208.288.2182 The following additional services have been requested for the above referenced project. 'I~ese changes were not included in the original estimate and require additional time to complete. As a result we are asking for an additional $4,SOU.00 (Four Thousand Five Hundred Dollars) to complete the design. Project changes; • Relocation of five PRVs. • Added four additional analog points to be monitored per site, requiring a redesign of the PLC and radio system. If you have any questions, or require additional informafion, please do not hesitate to ask. Sincerely, DC ENGINEERING, P.C. Lane Huddleston DC Engineering