Loading...
Email from Lars AndersonPage 1 of 1 Tara Green From: Jaycee Holman Sent: Wednesday, May 14, 2008 11:17 AM To: Tara Green Subject: FW: Regency at River Valley response to comments Follow Up Flag: Follow up Flag Status: Green Attachments: Letter to Mayor deWeerd.pdf This needs to go with the regency packet for 5/20 meeting. Jaycee L. Holm~n City Clerk City of Meridian From: Lars Anderson [mailto:lars.anderson@bachhomes.net] Sent: Tuesday, May 13, 2008 2:23 PM To: clerk Cc: Anna Canning; sstanfield@mseng.us; Sonya Watters Subject: Regency at River Valley response to comments Dear Ms. Holman: We ask that you enter the attached letter into the record for the Regency at River Valley. We also ask that you distribute the letter to the Mayor and members of the City Council. If there is anything else I need to provide to allow for this action, please let me know. Thank you very much, Lars _A__nderson Bach Homes, L.L.C. Projed Manager (801) 567-3029 (Direct Line) (801) 567-3091(F) lars.anderson@bachhomes.net 5/16/2008 ~~~~$ ~ MAY i '~ ~~"?~ City ~f Meridiar~ City Clerk Oflic~ May 13, 2Q08 Mayor Tammy de VJeerd City of Meridian 660 E. V~atertower Ln., Ste. 202 Mei~dian, Idaho 83642 Re: The Regency at River Valley Dear Mayor de Weerd: This letter is a zespoxise to a recent letter to the City concezning oux application for annexatio~ and a Conditional Use Permit for the Regency at River Va11ey Apartment Cornmunity. The comments were made by David Kleiner on April 22, 2008. In N1r. Kleiner's letter he has made the request (Request #1 } that Bach Homes pay for 50% of tb.e right of way costs at "fair rnarket va.lue". In our previous correspondence with Mr. Kleiner and Centercal we offered to dedicate 50% of the right of way and c~nstruction costs if fihe right of way had been on Bach Homes property. In oux applica.tion process with ACHD and ITD it was determined that the alignment of East River Va11ey Street was required to be south of our current property Iine. Therefore we are unable to piovide 50% of the right o£way because of the required roadway alignment. Please note that Bach Homes is providing 100% of the right of way and 100% of the cox~struction costs to build Alley's Way through our parcel as required by ACHD. We staiid by our initial offer to construct 50% of East River Valley Street even though it is i~ot on our property. In the aimexation approval of the Kleiner property on January 8, 200$ the dedication of the right of way from 1VI~. Kleiner was required to be "immedia~e". Therefore as soon as tlie City of Meridian grants approval to Bach Homes and ACHD acquues the proper dedication, Bach Hames is willing to proceed with the construction process. We do not believe it is the responsibilitv of Bach Homes to purchase the ri~ht of ~vvav for East River VaIIey Street from Mr. HIeiner. However we do recognize that if fhe Kleiner property is not going to be developed iminediately we are willix~g to construct 100% of East River Valley Slreet from the intersection of Eagle Road to our east property boundary. This offez in.cludes the original requirements of ACHD {curb and gutter and IO foot xnulti-use path along our south property Iine as well as 35' of asphalt) and now includes curb and gutter and asphalt along the future Kleiner Properly north boundary for the entire length of East River Valley Street (approx. 1,2501inear feet). 11650 South State Street, Suite 300 • Draper, Utah 84020 • Phone: 801.565.2224 ~ Fax. 801.566.2203 • www.bachhomes.net We believe t.~.is to be a generous offer going above the m;nimwn requiremez~ts of ACHD. The advazitage to the City of Meridia~l is having a cozaapleted roadway. When the Kleiner property is eventually developed they will be able to "cut" in their access points through the curb and gutter c~epeiiding on locations they agree to with ACHD and the City of Meridian. They are not required to provi.de any funds for ~he consixuction of East River Valley Sireet, however this offer is only valid if ~ey dedicate the necessary right of way within the ne~t suc months. ~ In response to Mr. Kleiner's requests #2 and #3 we beiieve our accesses da not preclude the development of ~their property. Our access locations have been appro~ed by ACHD and meet ACHD standards. Ftuthermore t31e Kleiner property will have the opportw~ity to access East River ValIey Stx eet in many locations along their 1,250 feet of fronta.ge. Bach Homes has been waiting to develop our properiy f~r 2 years and we do not belisve additional delay is necessaty or fair. We hope you will considez our offer and our point of view when our application is before you for review. Respectful.ly, --~---._._ Lars Anderson Projeet Manager Bach Homes Cc: Anna Borchers Caa~ning, Planning Director 11G50 Sou#h State Street, Suite 30d • Draper, Utah 840~0 • Phone: 801.566.2224 • Fax. 801.566.Z~03 • www.bachhomes.net