HomeMy WebLinkAboutJC Constructors, Inc. for WWTP Expansion ProjectCHANGE ORDER 6
PROJECT: City of Meridian -Wastewater Treatment Plant Expansion Project
DATE OF ISSUANCE: May 2, 2008
OWNER: City of Meridian
CONTRACTOR: JC Constructors, Inc.
EFFECTIVE DATE: :May 2, 2008
ENGINEER: Carollo Engineers, P.C.
Page 1 of 2
You are directed to make the following changes in the Contract Documents.
• Blower Inlet Piping Modifications (WCD 33)
• Increase RS 42" DIP pothole (WCD 39)
• Relocate SPS Hatch Mechanism (WCD 43)
• Digester No.l and 2 Chemical Feed System (WCD 46)
• AB 2 handrail, ladder and grating modifications (WCD 48a)
• Power for PE sampler at SPS (WCD 49)
• City Trailer Power (WCD 50)
• Replacement of gas cleaning valves (WCD 51)
• Site paving adjustment (WCD 52)
• Credit for remaining wood baffle allowance (WCD 53)
• Redundant SPS level element (RFP 25)
• AB No. 1 and 2 concrete and metal work rehabilitation (RFP 27)
• AB No. 1 and 2 ML pipe blast and recoat (RFP 27a)
• Addition blast and recoat of ML pipe (RFP 27c)
Time Extension to include additional scope of work requested by the City.
Attachments: JC Constructors Change Proposal Request - (WCD 33) -March 26, 2008 for $4,982.37
JC Constructors Change Proposal Request - (WCD 39) -March 28, 2008 for $5,042.67
JC Constructors Change Proposal Request - (WCD 43) -April 18, 2008 for $760.99
JC Constructors Change Proposal Request - (WCD 46) -April 18, 2008 for $3,885.23
JC Constructors Change Proposal Request - (WCD 48a) -March 7, 2008 for $4,412.99
JC Constructors Change Proposal Request - (WCD 49) -April 21, 2008 for $454.28
JC Constructors Change Proposal Request - (WCD 50) -January 2, 2008 for $2,535.72
JC Constructors Change Proposal Request - (WCD 51) -April 1, 2008 for $1,257.90
JC Constructors Change Proposal Request - (WCD 52) -January 28, 2008 for $8,787.42
JC Constructors Change Proposal Request - (WCD 53) -April 14, 2008 for $8,878.21
JC Constructors Change Proposal Request - (RFP 25) -March 27, 2008 for $4,022.59
JC Constructors Change Proposal Request - (RFP 27) -September 29, 2007 for $29,019.75
JC Constructors Change Proposal Request - (RFP 27a) -September 29, 2007 for $28,284.27
JC Constructors Change Proposal Request - (RFP 27c) -February 18, 2008 for $2,912.78
Page 2 of 2
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price Original Contract Times
Substantial Completion: 670 Davs - September 1, 2007
Ready for Final Payment: 730 Davs -November 1, 2007
p
$ 8.367,SOO.OO daysordates
Net Changes from previous Change Orders No. l to No. 5 Net Changes from previous Change Orders No. 0 to No. 5
$ 646,783.23 One Hundred Twenty (120)
Days
Contract Price prior to this Change Order Contract Times prior to this Change order
Substantial Completion: 670 Davs - September I, 2007
~ 9,014,283.23 Ready for Final Payment: 850 Davs -February 28, 2008
days or dates
Net Increase (decrease of this Change Order) Net Increase (decrease of this Change Order)
$ 87
48
75 Nintv three (931
,
. days
Contract Price with all approved Change Orders Contract Times with all approved Change Orders
Substantial Completion: 670 Days - September 1, 2007
$ 9,1 ~ 1,763.98 Ready for final payment: 943 D_ys - Mav 3 I , 2008
days or dates
RECOMMENDED BY ENGINEER:
By:
William enko, .E.
Date: GS OZ ~
APPROVED BY OWNER:
. ~~
Clint olsby, P.E., Public Works
Date: Q'a /t~'~ ~
ACCEPTED BY CONTRACTOR:
Contractor (Authorized Signature)
Date:
Date:
Tammy de Weerd, Mayor
Attest:
Jay Cee Holman., City Clerk
Date:
CHANGE PROPOSAL REQUEST
1.PROJECT
MERIDIAN WWTF 2.CONTRACTOR 3.PROJECT NO.
~4s Change Proposal #
WCD #33
IMPROVEMENTS JC CONSTRUCTORS S.CONTRACT NO: 6.PROPOSAL DATE
26-Mar-08
DESCRIPTION OF CHANGE
Add reducing fitting to coordinate with valve supplied by others.
Supply a tight 90 due to height restrictions. '
COST SUMMARY
A. FOR CHANGE WORK DIRECTLY PERFORMED BY THE UNDERSIGNED CONTRACTOR
1. Direct labor w/ labor fringes (Attach supporting detail estimates with man-hours and rates) $ 164.52
2. Insurance and Labor Taxes $ 40.26
3. Materials and Equipment. Detailed quantities attached. $ 3,105.00
4. Overhead & Fee @ 75% $ 496.47
$ -
Time Extention Requested 0 working daV JC Constructors' Cost $ 3,806.24
B. For work to be performed by subcontractors, per proposals and detailed breakdowns
1.
SUBCONTRACTOR NAME
CATEGORY OF WORK
AMOVNT
Custom Electric Electrical Modifications 1050
z
TOTAL SUBCONTRACTOR AMOUNT (INCLUDING SUB. OHBPi'
$ 1 , OSO.OO
7
CONTRACTORS COMMISSION ON TOTAL SUBCONTRACTOR AMOUNT ~ 5 PERCENT:
$ 52.50
CONTRACTORS BOND COST ~ 5.018!1000 $ 73.63
C. TOTAL INCREASE OR DECREASE OF CONTRACT PRICE - (A8+g5) $ 4,982.37
JC CONSTRUCTORS, INC.
CONTRACTOR NAME
Jim Cox
PRINTED NAME ON PROPOSAL SIGNATURE 1 DA TE
Page 1, JCC
CHANGE PROPOSAL REQUEST
1.PROJECT
MERIDIAN WWTF 2.CONTRACTOR
JC CONSTRUCTORS 3.PROJECT NO.
~~
Change Proposal #
WCD # 39
IMPROVEMENTS S.CONTRACT NO: 6.PROPOSAL DATE
26-Mar-08
DESCRIPTION OF CHANGE ,
Pothole at primary supply line to investigate for obstructions and future alignment.
As requested JC performed this work on a T8~M basis.
This pricing does not include removal of demo and overburden to the owners land west of
the project. Maintenance of the stockpiled material is not anticipated with this pricing.
COST SUMMARY
A. FOR CHANGE WORK DIRECTLY PERFORMED BY THE UNDERSIGNED CONTRACTOR
1. Direct labor wl labor fringes (Attach supporting detail estimates with man-hours and rates) $ 1,872.37
2. Insurance and Labor Taxes $ 447.76
3. Materials and Equipment. Detailed quantities attached. $ 2,000.00
4. Overhead & Fee Q 15°k $ 648.02
$ -
Time Extention Requested 0 wOrklllq day JC Constructors' Cost $ 4,968.15
B. For work to be performed by subcontractors, per proposals and detailed breakdowns
i
SUBCONTRACTOR NAME
CATEGORY OF WORK
AMOUNT
2
TOTAL SUBCONTRACTOR AMOUNT (INCLUDING SUB. OHBP):
$ -
J I
CONTRACTORS COMMISSION ON TOTAL SUBCONTRACTOR AMOUNT ~ 5 PERCENT:
$ -
CONTRACTORS BOND COST ~ 5.078!1000 $ 74.52
C. TOTAL INCREASE OR DECREASE OF CONTRACT PRICE - (AS+BS) $ 5,042.67
JC CONSTRUCTORS, INC.
CONTRACTOR NAME
Jim Cox
PRINTED NAME ON PROPOSAL SIGNATURElOATE
Page 1, .fCC
o ~-
~}
CHANGE PROPOSAL REQUEST
1.PROJECT
MERIDIAN WWTF 2.CONTRACTOR 3.PROJECT NO.
148 Change Proposal #
WCD 043
IMPROVEMENTS JC CONSTRUCTORS 5.CONTRACT NO: 6.PROPOSAL DATE
18-Apr-07
DESCRIPTION OF CHANGE
Revise the SPS hatch door hold open to the south side for safe operation. .
COST SUMMARY
A. FOR CHANGE WORK DIRECTLY PERFORMED BY THE UNDERSIGNED CONTRACTOR
1. Direct labor w/labor fringes (Attach supporting detail estimates with man-hours and rates) $ 336.90
2. Insurance and Labor Taxes $ 77.55
3. Materials and Equipment. Detailed quantities attached. $ 237.50
4. Overhead & Fee @ 15% $ 97.79
$ -
Time Extention Requested 0 working day JC Constructors' Cost $ 749.74
B. For work to be performed by subcontractors, per proposals and detailed breakdowns
t
SUBCONTRACTOR NAME
CATEGORY OF WORK
AMOUNT
2
TOTAL SUBCONTRACTOR AMOUNT pNCLUDING SUB. OH&P):
$ -
7 '
CONTRACTORS COMMISSION ON 70TAL SUBCONTRACTOR AMOUNT ~ 5 PERCENT-.
$ -
CONTRACTORS BOND COST @ 8.078/1000 $ 11.25
C. TOTAL INCREASE OR DECREASE OF CONTRACT PRICE - (AB+BS) $ 760.99
JC CONSTRUCTORS, INC.
CONTRACTOR NAME
Jim Cox
PRINTED NAME ON PROPOSAL SIGNATURE: DATE
Page 1, JCC
~,~ o,~
CHANGE PROPOSAL REQUEST
1.PROJECT
MERIDIAN WWTF 2.CONTRACTOR
JC CONSTRUCTORS 3.PROJECT NO.
1a8 Change Proposal #
WCD 046
IMPROVEMENTS S.CONTRACT NO_ 6.PROPOSAL DATE
18-Apr-07
DESCRIPTION OF CHANGE .
Install piping and pump for temporary Ferric injection system.
COST SUMMARY
A. FOR CHANGE WORK DIRECTLY PERFORMED BY THE UNDERSIGNED CONTRACTOR
1. Direct labor w/ labor fringes (Attach supporting detail estimates with man-hours and rates) $ 82.26
2. Insurance and Labor Taxes $ 20.13
3. Materials and Equipment. Detailed quantities attached. $ -
4. Overhead & Fee Q 15°~6 $ 15.36
$ -
Time Extention Requested 0 working day JC Constructors' Cost $ 117.75
8. For work to be performed by subcontractors, per proposals and detailed breakdowns
1.
SUBCONTRACTOR NAME
CATEGORY OF WORK
AMOUNT
Capital Ci Plumbin Plumbin 3533.4
z
TOTAL SUBCONTRACTOR AMOUNT (INCLUDING SUB. OHBP)-
$ 3,533.40
3,
CONTRACTORS COMMISSION ON TOTAL SUBCONTRACTOR AMOUNT Q 5 PERCENT: r
$ ~ 76.67
CONTRACTORS BOND COST ~ 3.01817000 $ 57.42
C. TOTAL INCREASE OR DECREASE OF CONTRACT PRICE - (AS+BS) $ 3,885.23
JC CONSTRUCTORS, INC.
CONTRACTOR NAME
Jim Cox
PRINTED NAME ON PROPOSAL SIGNATURE! DATE
Page 1, JCC
C~IANGE PROPOSAL REQUEST
1.PROJECT
MERIDIAN WWTF 2.CONTRACTOR 3.PROJECT NO.
148 Change Proposal #
~ WCD 48a
IMPROVEMENTS JC CONSTRUCTORS 5.CONTRACT NO: 6 PROPOSAL DATE
7-Mar-08
DESCRIPTION OF CHANGE
Misc handrail, grating, and ladder modifications per the work change directive.
COST SUMMARY
A. FOR CHANGE WORK DIRECTLY PERFORMED BY THE UNDERSIGNED CONTRACTOR
1. Direct labor w! labor fringes (Attach supporting detail estimates with man-hours and rates) $ 1,978.70
2. Insurance and Labor Taxes $ 471.54
3. Materials and Equipment. Detailed quantities attached. $ 1,125.00
4. Overhead 8 Fee @ 15% $ 536.29
$ -
Time Extention Requested 0 wOfking_daV JC Constructors' Cost $ 4,111.53
B. For work to be performed by subcontractors, per proposals and detailed breakdowns
~.
SUBCONTRACTOR NAME
CATEGORY OF WORK
AMOUNT
Boise sawcuttin Concrete cutting 225
z
TOTAL SUBCONTRACTOR AMOUNT (INCLUDING SUB. OHBP)~
$ 225. ~O
7
CONTRACTORS COMMISSION ON TOTAL SUBCONTRACTOR AMOUNT @ 5 PERCENT: I
$ 11.25
CONTRACTORS BOND COST @ 5.018/7000 $ 65.22
C. TOTAL INCREASE OR DECREASE OF CONTRACT PRICE - (A8+g5) $ 4,412.99
JC CONSTRUCTORS, INC.
CONTRACTOR NAME
Jim Cox
PRINTED NAME ON PROPOSAL SIGNAT 'JRE /DATE
Page 1, JCC
CHANGE PROPOSAL REQUEST
1.PROJECT
MERIDIAN WWTF 2.CONTRACTOR
JC CONSTRUCTORS 3.PROJECT NO.
148
Change Proposal #
WCD # 49
IMPROVEMENTS S.CONTRACT NO' 6.PROPOSAL DATE
21-Apr-08
DESCRIPTION OF CHANGE .
Add power to the relocated sampler at the north side of the SPS
COST SUMMARY
A. FOR CHANGE WORK DIRECTLY PERFORMED BY THE UNDERSIGNED CONTRACTOR
1. Direct labor wl labor fringes (Attach supporting detail estimates with man-hours and rates) $ -
2. Insurance and Labor Taxes $ -
3. Materials and Equipment. Detailed quantities attached. $ -
4. Overhead & Fee @ 15% $ -
$ -
Time Extention Requested 0 working day JC Constructors' Cost $ -
B. For work to be performed by subcontractors, per proposals and detailed breakdowns
t.
SUBCONTRACTOR NAME
CATEGORY OF WORK
AMOUNT
Custom electric Electrical 426.25
2
TOTAL SUBCONTRACTOR AMOUNT (INCLUDING SUB. OHBP):
$ 426.25
a
CONTRAC70RS COMMISSION ON TOTAL SUBCONTRACTOR AMOUNT Q 5 PERCENT:
$ 2 ~ . 3
CONTRACTORS BOND COST (83 5.018n000 $ 6.7
C. TOTAL INCREASE OR DECREASE OF CONTRACT PRICE - (A8+BS) $ 454.28
JC CONSTRUCTORS, INC.
CONTRACTOR NAME
Jim Cox
PRINTED NAME ON PROPOSAL SIGNATURE i DAi 5
Page 1, JCC
/.
CHANGE PROPOSAL REQUEST
1.PROJECT
MERIDIAN WWTF 2.CONTRACTOR 3.PROJECT NO.
148 Change Proposal #
WCD 050
IMPROVEMENTS JC CONSTRUCTORS S.CONTRACT NO: 6.PROPOSAL DATE
2,Jan-08
DESCRIPTION OF CHANGE
Add power for the Owners temp trailer after JC removed their temp power pole.
COST SUMMARY
A. FOR CHANGE WORK DIRECTLY PERFORMED BY THE UNDERSIGNED CONTRACTOR
1. Direct labor wJ labor fringes (Attach supporting detail estimates with man-hours and rates) $ 158.30
2. Insurance and Labor Taxes $ 37.72
3. Materials and Equipment. Detailed quantities attached. $ 200.00
4. Overhead 8 Fee Q 1596 $ 59.40
$ -
Time Extenton Requested 0 WOfkIrIQ daV JC Constructors' Cost $ 455.42
B. For work to be performed by subcontractors, per proposals and detailed breakdowns
SUBCONTRACTOR~NAME CATEGORY OF WORK AMOUNT
Custom Electric Electrical 1945.55
70TAL SUBCONTRACTOR AMOUNT pNCLUOING SUB. OH8P} $ 1,945.55
3
CONTRACTORS COMMISSKMI ON TOTAL SUBCONTRACTOR AMOUNT ~ 5 PERCENT:
$ 97.28
coNTRACTORS eoNO cosy ~ s.oieriooo $ 37.47
C. TOTAL INCREASE OR DECREASE OF CONTRACT PRICE - (AB+B'~
$ 2,535.72
JC CONSTRUCTORS, INC.
CONTRACTOR NAME
Jim Cox
PRfNTED NAME ON PROPOSAL SIGNATURE /DATE
Page 1, JCG
CHANGE PROPOSAL REQUEST
1.PROJECT
MERIDIAN WWTF 2.CONTRACTOR
JC CONSTRUCTORS 3.PROJECT N0.
X48 Change Proposal #
WCD # 51
IMPROVEMENTS
S.CONTRACT NO:
6.PROPOSAL DATE
~~ / 1 Zo~~
DESCRIPTION OF CHANGE
3 of the existing HCL valves where leaking. Capital City Plumbing isolated the leaks,
replaced three monel three way valves, and re-tested system.
COST SUMMARY
A. FOR CHANGE WORK DIRECTLY PERFORMED BY THE UNDERSIGNED CONTRACTOR
1. Direct labor w/ labor fringes (Attach supporting detail estimates with man-hours and rates) $ -
2. Insurance and Labor Taxes $ -
3. Materials and Equipment. Detailed quantities attached. $ -
4. Overhead 8 Fee @ 15% $ -
$ -
Time Extention Requested 0 WOrkinq dam/ JC Constructors' Cost $ -
B. For work to be performed by subcontractors, per proposals and detailed breakdowns
i
SUBCONTRACTOR NAME
CATEGORY OF WORK ~
AMOUNT
Capital Cit Plumbing Plumbing 1180.3
z
7pTAL SUBCONTRACTOR AMOUNT (INCLUDING SUB. OHSP):
$ 1 , 1 80.30
3
CONTRACTORS COMMISSION ON TOTAL SUBCONTRACTOR AMOUNT ~ 5 PERCENT. ,
$ 59.02
CONTRACTORS BOND COST @ 3.018/1000 $ 18.59
C. TOTAL INCREASE OR DECREASE OF CONTRACT PRICE - (A8+g~) $ 1,257.90
JC CONSTRUCTORS, INC.
CONTRACTOR NAME
Jim Cox
P.R:NTeC NAME ON P.40POSAL S7GNArURE %CA 7c
Page 1, JCC
CHANGE PROPOSAL REQUEST
1.PROJECT 2.CONTRACTOR 3.PROJECT NO. Change Proposal #
MERIDIAN WWTF JC CONSTRUCTORS ~a8 WCD 52
IMPROVEMENTS S.CONTRACT NO: 6.PROPOSAL DATE
28-Jan-08
DESCRIPTION OF CHANGE
Final Asphalt rconciliation.
Asphalt at the north of the plant was eliminated from JC contract due to coordination issues
with the contractor at the north side of the site. JC is providing credit for this area.
Additional costs are for;
Overlay of drying bed
Inflation cost of asphalt oil
JC grade coordination, sawcut and removal of asphalt at admin building patch
COST SUMMARY
A. FOR CHANGE WORK DIRECTLY PERFORMED BY THE UNDERSIGNED CONTRACTOR
1. Direct labor wl labor fiinges (Attach supporting detail estimates with man-hours and rates) $ 2,544.92
2. Insurance and Labor Taxes $ 49$.17
3. Materials and Equipment. Detailed quantities attached. $ 550.00
4. Overhead & Fee @ 15% $ 538.96
$ -
Time Extention Requested 0 working day JC Constructors' Cost $ 4,132.05
B. For work to be performed by subcontractors, per proposals and detailed breakdowns
~.
SUBCONTRACTOR NAME
CATEGORY OF WORK
AMOUNT
CAA As halt Credit for avin at north of plant $ (9,600.00)
C8~A Asphalt As halt oil inflation $ 7,160.00
C8~A Asphalt D in bed overla $ 6,750.00
z
TOTAL SUBCONTRACTOR AMOUNT (INCLUDING SUB. OHdP): $ 4,31 O.OO
CONTRACTORS COMMISSION ON TOTAL SUBCONTRACTOR AMOUNT ~ 5 PERCENT $ 215, 5O
CONTRACTORS BOND COST ~ $.078/1000 $ 129.86
C. TOTAL INCREASE OR DECREASE OF CONTRACT PRICE - (AS+BS) $ $7$7.42
JC CONSTRUCTORS, INC.
CONTRACTOR NAME
Jim Cox
PRINTED NAME ON PROPOSAL S/GNATURE /DATE
Page 1, JCC
CHANGE PROPOSAL REQUEST
..PROJECT
MERIDIAN WWTF 2.CONTRACTOR
JC CO
T 3.PROJECT NO
1as Change Proposal ~
WCD # 53
IMPROVEMENTS NSTRUC
ORS 5.CONTRACT NO: 6.PROPOSAL DATE
14-Apr-08
DESCRIPTION OF CHANGE
Contract deduct to credit the unspent portion of the wood allowance
COST SUMMARY
A. FOR CHANGE WORK DIRECTLY PERFORMED BY THE UNDERSIGNED CONTRACTOR
1. Direct labor w! labor fringes (Attach supporting detail estimates with man-hours and rates) $ -
2. Insurance and Labor Taxes $ -
3. Materials and Equipment. Detailed quantities attached. $ (8,747.00)
4. Ovefiead 8, Fee @ 15°k $ -
$ -
Time Extension Requested 0 working dax JC Constructors' Cost $ (8,747.00)
For work to be performed by subcontractors, per proposals and detailed breakdowns
1.
SUBCONTRACTOR NAME
CATEGORY OF WORK
AMOUNT
2
TOTAL SUBCONTRACTOR AMOUNT (INCLUDING SUB. OHBPj:
$ -
3
CONTRACTORS COMMISSION ON TOTAL SUBCONTRACTOR AMOUNT ~ 5 PERCENT'
$ -
CONTRACTORS BOND COST (d 5.01811000 ~ $ (~ 3 ~ .21 )
C. TOTAL INCREASE OR DECREASE OF CONTRACT PRICE - (A8+65) $ (8 878 21)
JC CONSTRUCTORS, INC.
CONTRACTOR NAME
Jim Cox
PRINTED NAME ON PP.OPOSAL
SIGNATURE: GATE
Page 1, JCC
CHANGE PROPOSAL REQUEST
.PROJECT
MERIDIAN WWTF 2.CONTRACTOR 3.PROJECT NO.
~`~ Change Proposal r
RFP # 25
_.IMPROVEMENT`S JC CONSTRUCTORS S.CONTRACT NO: 6_PROPOSAL DATE-
28-Nov-07
DESCRIPTION OF CHANGE
Add new level sensor at the SPS.
COST SUMMARY
a FOR CHANGE WORK DIRECTLY PERFORMED BY THE UNDERSIGNED CONTRACTOR
1. Direct labor w/ labor finges {Attach supporting detail estimates with man-hours and rates) $ 593.61
2. Insurance and Labor Taxes $ 141.46
3. Materials and Equipment. Detailed quantities attached. $ 910.00
4. Overhead 8 Fee @ 1596 $ 246.76
$ -
Time Exteriflon Requested 0 working day Jc Constructors• cos: $ 1,891.83
-, For work to be perronmed by subcontractors, per proposals and detailed breakdowns
SUBCONTRACTOR NAME ~ ~ CATEGORY OF WORK
Custom electric ElectricaUControl 1972.68
2
TOTAL suecoNrnACroR AMOUNT Ia+ctuoiNC srJe- oNaPl-
$ 1, 972.68
3
CONTRACTORS COMMISSKTN ON TOTAL~SUBCONTRACTOR AMOUNT @ 5 PERCENT'
$ 98.63
coNTRACTORS BoNO cosT ~ ao~errooo $ 59.45
C. TOTAL INCREASE OR DECREASE OF CONTRACT PRICE - (A8+B5)
$ 4,022.59
JC CONSTRUCTORS, INC.
cavTRacTOnNM~
Jim Cox
Page 1, JCC
IC~iANGE PROPOSAL REQUEST
1.PROJECT
MERIDIAN WWTF 2.CONTRACTOR
JC CONSTRUCTORS 3.PROJECT NO. ~
148
Change ProDOSaI ~
RFP # 27
IMPROVEMENTS 5_CONTRACT NO: 6.PROPOSAL DATE
29Se -07
DESCRIPTION OF CHANGE '
Final costs for the patching of holes and the verticai joint between the original AB structure
and the 1997 addition.
This proposal request combines the earlier estimates of RFP # 27 and RFP # 27b.
COST SUMMARY
A. FOR CHANGE WORK DIRECTLY PERFORMED BY THE UNDERSIGNED CONTRACTOR
1. Diced labor vA labor fringes (Attach supporting detai estimates with man-hours and rates) $ 13,455.19
2 Insurance and Labor Taxes $ 3,206.46
3. Materials and Equipment Detaied quantities attactled. $ 8,200.00
4. Overhead 8 Fee @ 15% $ 3,729.25
$ -
7ime Extention Requested 0 working day JC Constructors' Cost $ 28,590.89
B. For work to be performed by subcontredors, per proposals and detailed breakdowns
1.
SUBCONTRACTOR NAME
CATEGORY OF YMORK
AMOUNT
2
TOTAL SUBCONTRACTOR AMOUNT (INCLUDING SUB. OMdP):
$ -
J
CONTRACTORS COMMISSION ON TOTAL 3UBC.ONTRACTOR AMOUNT ~ 5 PERCENF:
$ -
coNrnACrorts eoNO cosy ~ s.o+aneoo $ 428.86
C. TOTAL INCREASE OR DECREASE OF CONTRACT PRICE - (AB+BS)
$ 29,019.75
JC CONSTRUCTORS, INC.
coMRSCroR nwMr=
Jim Cox
PRIMED NAME ON PROPOSAL SIGNATURE /DATE
Page 1, JCC
CHANGE PROPOSAL REQUEST
1.PROJECT
MERIDIAN WWTF 2CONTRACTOR
JC CONSTRUCTORS 3.PROJECT NO.
~a8
Change Proposal #
RFP # 27a
IMPROVEMENTS S.CONTRACT NO: 6.PROPOSAL DATE
29-Sep-07
DESCRIPTION OF CHANGE
Blast and coat ML pipe, and remove old penetration cover plates in the AB 18L2.
Misc metal coating includes sand blasting and 12 mil coating of two part epoxy.
COST SUMMARY
A. FOR CHANGE WORK DIRECTLY PERFORMED BY THE UNDERSIGNED CONTRACTOR
1. Direct labor w/ labor finges (Attach supporting detail estimates with man-hours and rates) $ 12,663.70
2. Insurance and labor Taxes $ 3,017.84
3. Materials and Equipment. Detailed quantities attached. $ 8,550.00
4. Overhead & Fee @ 15°k $ 3,634.73
$ -
Time Extention Requested D working day JC Constructors' Cost $ 27,866.28
e. For work to be performed by subcontractors, per proposals and detailed breakdowns
1.
SUBCONTRACTOR NAME
CATEGORY OF WORK
AMOUNT
2
TOTAL SUBCONTRACTOR AMOUNT (INCLUDING SUB_ OH3P1 ~
$ -
J
CONTRACTORS COMMISSION ON TOTAL SUBCONTRACTOR AMOUNT @ S PERCENT:
$ -
CONTRACTORS BONG COST (off 5.01&1000 $ 417.99
C. TOTAL INCREASE OR DECREASE OF CONTRACT PRICE - (AB+BS) $ 28 284 27
JC CONSTRUCTORS, INC.
CONTRACTOR NAME
Jim Cox
PRINTED NAME ON PROPOSAL SIGNATURE /DA TE
Page 1, JCC
~~ o,~~.
CHANGE PROPOSAL. REQUEST
1.PROJEC7
MERIDIAN WWTF 18-Feb-08
JC CONST
UC 3.PROJECT NO.
148
Change Proposal #
RFP 27c
IMPROVEMENTS R
TORS S.CONTRACT NO: 6.PROPOSAL DATE
18-Feb-08
DESCRIPTION OF CHANGE ,
Repair existing leaking wall joint between AB's 182. Joint was prepared and caulked with
a polyuria caulking and primer.
Grind and patch previously repaired areas by others that where beginning to teak.
COST SUMMARY
A. FOR CHANGE WORK DIRECTLY PERFORMED BY THE UNDERSIGNED CONTRACTOR
1. Direct labor w/ labor fringes (Attach supporting detail estimates with man-hours and rates) $ 1,418.53
2. Insurance and Labor Taxes $ 326.51
3. Materials and Equipment. Detailed quantities attached. $ 750.38
4. Overhead & Fee @ 15% $ 374.31
$ -
Time Extention Requested 0 working day JC Constructors' Cost $ 2,869.73
B. For work to be peAormed by subcontractors, per proposals and detailed breakdowns
1.
SUBCONTRACTOR NAME
CATEGORY OF WORK
AMOUNT
2
TOTAL SUBCONTRACTOR AMOUNT (INCLUDING SUB. OH8PI:
$ -
~ ~
CONTRACTORS COMMISSION ON TOTAL SUBCONTRACTOR AMOUNT 3~ 5 PERCENT.
$ -
CONTRACTORS BOND COS7 @ 5 018/1000 $ 43.05
C. TOTAL INCREASE OR DECREASE OF CONTRACT PRICE - (AB+BS) $ 2 912 78
JC CONSTRUCTORS, INC.
CONTRACTOR NAME
Jim Cox
PRINTED NAME ON PP,OPOSAL SIGNATURE.'OATc
Page ~ . JCC
Fags 2 of 2
CHANtR~ W C~DavTPRACT PB[CE: C9ANCE IN CONTRACP TIMES:
Origiosl Contract Friae Oagioal C~ttact Tina
Subee~t Camplatioa: 0 Daps - S~6a 1.2007
Novan~bar 1.2U07
Rca~r fay Heal Pay~nmt T30 Davs -
$ 8.3b7.500 QO ~
Nat C6aoges From p[eviona (:6emgeOriwae iJu 1 >b 1Vo.~ Nat t'[om pceriWS C~ageOidas No. ~ to No.~
$ 646.7$x.23 one l;o~a T~aty (lam)
owe
Contras Peioepaor m f>da ~ Oi+dar Contma7~ psiaato ~ ~ ~
Sa6e1 Canplatiaac B70 Davs - September 1.2007
~ 9 alaz8~.z3 Readyt~a?anal Faymeot acso aa~ - Fa,~-z~ 20~
Net Increme (daaeaavof~av~ A~geOlde<) Nd Ia~se(deaaaaeoYtl>fs ( Ordd-
$ 87.480.75 Nmwthree(931
~+
Cemtr~t Prioe ~ all appiovad ~ l)edms (~ll$itd Z"tmE3 Wtt~i 8ll approved Change O[dtl3
Su»l Compldiam: f10 Dasrs - 3mtamber 1.2007
$ 9 I01.763.98 Ready fa~ 6ea1 payment 943 Davs - Mav 31. X08
agsar0eees
RTCO~iDF~D BY ~1TGII~: ACCBPTF.D HY COIVTRACISOR:
BY- ~~^
W ' J Benin , P.E
I?atie:
APPROVED 13Y OWNER:
Clint IabT, F.B., Pabhe or)oa
race: shz ~~8
Conttacta~
Date:
9 - 1\
• ~~
woad, l~r Ja}- con
Date: - ~ p~ Dales _
~wcd by trr7 ~;1: I~,j 13, ~p
,~~
~' .•`