HomeMy WebLinkAboutACHD Comments* ~~~~3l~
~ ' ~!~-.
~oswmn~`u~~o ~r~r.v~sco
April 17, 2008
To: Stanley S. Silman
1749 W. Lowry St.
Meridian, ID 83646
Carol A. McKee, President
Sherry R. Huber, ist Vice President
Dave Bivens, 2nd Vice President
]ohn S. Franden, Commissioner
Rebecca W. Amold, Commissioner
~~~~~~~~~
Subject: MVAR-08-003 APR Z~ 200~
Setback Variance
1749 W. Lowry Street GI`C~ OF ~V1 ER f la IAN
In response to your request for comment, the Ada County Highway Dist~~~~~n~jcF~~~i~w
staff has reviewed the submitted application arid site plan for the item referenced above. It has been
c~rterr~~ineri tnat there are no site specific r~quirements for you at this time due to the fact that the
proposed developm~nt wi{I: -
• Generate less than 10 auUition :! ~~~'!a~ k~ ~~s per d~y ;~~?'!~).and is not a change in use.
If the site plan or use should change in the future, ACHD Planning Review will review the site plan
and may require improvements to the transportation system at that time.
Prior to the construction or installation of any roadway improvements (curb, gutter, sidewalk,
pavement widening, driveways, culverts, etc), a permit or license agreement must be obtained from
ACHD.
If you have any questions, please feel free to contact me at (208) 387-6174.
Sincer
rrod
Plan er I
Right-of-Way and Development Services
CC: Project file
City of Meridian
l4da County Highway District • 3775 Adams Street • Garden Gty, ID • 83714 • PH 2O8-387-b100 • FX 345-7650 • www.achd.ada.id.us
Development Process Checklist
~Submit a development application to a City or to the County
~The City or the County will transmit the development application to ACHD
~The ACHD Planning Review Division will receive the development application to review
~The Planning Review Division will do one of the following:
~Send a"No Review" letter to the applicant stating that there are no site specific requirements at this time.
^Send a"Comply With" letter ta the applicant stating that if the development is within a platted subdivision or part of a
previous development application and that the site specific requirements from the previous development a{so apply to this
development application.
OWrite a Staff Level report analyzing the impacts of the development on the transpo~tation system and evaluating the
proposal for its conformance to District Policy.
~Write a Commission Levc~t report analyzing the innpacts of the development on the transportatiore system and
evaluating the proposal for its conformance to District Policy.
~The Planning Review Division will hold a Technical Review meeting for all StafF and Commission Level reports
^For ALL development applications, including those receiving a"No Review" or "Comply With" letter.
The applicant should submit one set of engineered plans directly to ACHD for review by the Development Review Division for plan
review and assessment of impact fees. (Note: if there are no site improvements required by ACHD, then architectural plans may be
submitted for purposes of impact fee calculation.)
The applicant is required to get a permit from Constru~tion Services (ACHD) for ANY work in the right-of-way, induding, but not limited to
driveway approaches, street improvements and utility cuts.
^Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval.
DlD YOU REMEMBER:
Construction (Zone)
^ Driveway or Property Approach(s)
Submit a"Driveway Approach Request" form to Ada County Highway District (ACHD) Construction (for approval by Development
Services & Traffic Services). There is a one week turnaround for this approval.
^ Working in the ACHD Right-of-Way
Four business days prior to starting work have a bonded contractor submit a"Temporary Highway Use Permit Application' to ACHD
Gonstruction - Permits along with:
Traffic Control Plan
An Erosion 8~ Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are placing >60Q sf of
concrete or asphalt.
Gonstruction (Subdivisions)
^ Sediment 8 Erosion Submittal
At feast one week prior to setting up a Pre-Con an Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer
must be turned into ACHD Construction - Subdivision to be reviewed and approved by the ACHD Drainage Division.
^ Idaho Power Company
Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con being scheduled.
^ Final Approval from Development Services
ACHD Construction - Subdivision must have received approval from Development Services prior to scheduling a Pre-Con.
Ada Counry Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 2O8-387-61flfl • FX 345-7650 • www.achd.ada.id.us