Memo
To; Jaycee Holman; Tara Green
From: Clint Dolsby, P.E., Acting City Engineer
CC: Thomas Barry, Public Works Director
Date: 04/17/2008
Re: Proposed Agenda Items for April 22, 2008 City Council Meeting
The Public Works Department respectfully requests the following item be placed on the April 22 City
Council agenda, under consent agenda, for Council's consideration:
Change Orders No. 6 7 and 8 for the North Black Cat Trunk Sevuer. Additional work is required for the
North Black Cat Trunk Sewer. This change order consists of the following work. This makes the total
changes from Change Order No.1 through 8 equal to 3.28% of the original contract amount
• Due to unforeseen conditions Brown Construction imported an additional 9,069 cubic yards in
Mare.
• Three additional manholes were added to the North Black Cat Trunk Sewer.
• A time extension of 23 days was requested by Brown Construction far hauling in Import backfill
material.
Brown Construction, Inc, has submitted cost estimates for these change orders as summarized below:
• Change Order Na. 6 $0.00
• Change Order No. 7 $24,721.00
• Change Order No. 8 $13,166.00
• Summary of Change Orders 6, 7 and 8 $37,887.00
Recommended Council Action: The Public Works bepartment recommends that City
Council approves Change Orders No. 6, 7 and 8 for the North Black Cat Trunk Sewer
with Brown Construction, Inc. for $37,887.00 and authorize the Mayor to sign them.
Thank you for your consideration. Please contact me if you have any questions regarding any of these
items.
• Page 1
CHANGE ORDER 6
PROJECT: North Black Cat Trunk Sewer
DATE OF ISSUANCE: 3/27/08 EFFECTIVE DATE:
OWNER: Primeland Development Co. I1.P
CONTRACTOR: Brown Construction, Inc. ENGINEER: JUB Engineers
Page I of 2
You are directed to make the following changes in the Contract Documents.
•
Attachments: Explanation of additional costs.
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price Original Contract Times
1 717 487.31 Substantial Completion: 168 Davs - Mav 1, 2008
R
d
f
i
ea
y
or F
nal Payment: 2) 3 Davs -June 15. 2008
days or datcx
Net Changes from previous Change Orders No. I to No.~ Net Changes from previous Change Orders No. 1 to No. 5
$ 2U
334
UU 2.5
,
.
_
- pays
Contract Price prior to this Change Order Contract Times prior to this Change order
Substantial Completion: _1_68.5 1]ays - Mav 1.2008
1 73 821.31 Ready for Final Payment:. 21.5 Days -June 15.2008
days or dates
Net Increase (decrease of this Change Order) Net Increase (decrease of this Change Order)
~ 23
day.
Contract Price with all approved Change Orders Contract Times with all approved Change Orders
Substantial Completion: Da - 197.5 Ma 24 2 O8
1 737 821.31 Ready for final payment: Days - 242.5 July 8.2008
days or dates
RECOMMENDED BY OWNER:
B:
Date: 3 /0
APPROVED BY OWNER:
Date:
Date:
ACCEPTED BY CONTRACTOR:
By:
Date_ ~ ~~ ~ ~'
Tammy de Weerd, Mayor
A[test:
William G. Berg, Jr., City Clerk
Date:
Approved by City Council:
Mar 24 08 12:ASp Todd M 2Q8 d66 dB81 p2
Brawn ~nnstruction, Inc.
6881 Bennett Road
Mampa, ID 83686
Phone: {~08) 465-Q~74
Fax: (2q$y 465-3532
Prirneiar~ 1]evelvpment
3 x.20 W. l3elitower Drnre
Suitt 1130
Meridian, ID $3646
Attn: Glenn Fltrh
ADb117ONAL HAUL IN TlMEFQR 1ME~RTED M~,.~RI~{
• (Z~, 656 CY IMPORTED MATERIAL/ ~.$ CY pER TRIP = 7Q3 WALL TRIPS
703 HAUL TRIPS J 10 MQUIi WO#iKING L7AY = %p V~RKING DAY(S)
^ 70 WORKING DAY{5) f 31'RUCKS PAR DAY:- 23 pAY{5) QF HAIJL-IN
^ TOTAL TIME FOR HAUL-tIY OF IAAPORI'ED MAT6RIpL ~ ?3 OAY(5)
Thank }/ou.
Sincerelyf _~~
',,5~ r ~f~~.
r''~ ~
Richard Brown
Brawn Construction, Inc.
CHANGE ORDER 7
PR07ECT: North Black Cat Trunk Sewer
DATE OF ISSUANCE: 3/28/08
OWNER: Primeland Development Co. I_I_P
EFFECTIVE DATE:
CONTRACTOR: Brown Construction, Inc. ENGINEER: IUB Engineers
Page I of 2
You are directed to make the following changes in the Contract Documents.
•
Attachments: Explanation of additional costs.
CHANGE liN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price Original Contract Times
1 717 487.31 Substantial Completion: 168 Davs - Mav I, 2008 _
ne 15 2008
f
al P
e
t
213 Da s -J
R
d
Fi
n
:
u
ea
y
or
n
aym
days or dales
Net Changes from previous Change Orders Nn. I to No. 6 Net Changes from previous Change Orders No. l to No. 5
20
34
00 2s.
$
.
3
pays
Contract Price prior to this Change Order Contract Times prior to this Change order
Substantial Completion: 168.5 Davs - Mav 1.2008
1 737 821.31 Ready for Final Paymcnt: _ 213 a s -June 5 2
days or dattx
Nct Increase (decrease of this Change Order) Net Increase (decrease of this Change Order)
21
00 3
.
,.,_ ,~
$ 24,7
-
._. ~y~
Contract Price with all approved Change Orders Contract Times with all approved Change Orders
Substantial Completion: Davs - 200.E M~7,2008
1 762 542.31 Ready for final payment: Da - 245.5 Jul 1 120
dayz or date.
RECOMMENDED BY OWNER:
BC~
Date: /28/08
APPROVED BY OWNER:
Date:
ACCEPTED BY CON TOR:
By:
Date: ~~~. _~~
Tammy de Weerd, Mayor
Date:
Atlesl:
William G. Berg, Jr., City Clerk
Date:
Approved by City Council:
roKlfl
o~rsfractco~
MG.
PRIMELAND DEVF.L,O.PMENT
3120 W. BELLTOWERDR.
SUITE I QO
Mi~RIDIAN, IDAHO 8364b
fi881 Benn®tt Rd. -Nampa, ID 83888
Ana (208) 465-0274 -~ Fax (208) 4655
I17VOIC@
PATE INVOICE NO.
3/27/2008 08-881
TERMS PROJECT
301 -1vORTH BLACK C'AT TRIO SEWER
ITEM QTY DESCRIPTION RATE AMOUNT
CHANGE ORDER FUR PAY REQUEST:
1 9,069 IMPORTEU'1'RENCH BACKFILL 2.D0 18,138.00
CALCULATION BREAKDOWN:
LINEAR Fi?.ET OF SEWER TRENCH-I6I i LF
AVERAGE DEPTH OF SEWER TRENCH~25.0 FT
SUBTRACT 3 F-f =PIPE ZgNE (I'1PE AND
BEDDING)
SUBTRACT 3 FT = RQAD BA5E (PIT RUN SECTION,
3i4 Rn MIx,
ASPHALT)
TOTAL ~ 19 FT AVERAGE DEP"T"H OF 1MPQRTEU
TRENCH BACKFILL
(19.0 FT X 8 FT WIDE X 161 I LF1/27 - 9,069 CY
C1iANG>; URUER MANHOLE:
1 1 MANHOLE 17A1 6,583.00 6,583.00
Total $24,721.00
~•d
eLZ=60 BD GZ ~eW
CHANGE ORDER 8
PROJECT: North Black Cat Trunk Sewer
DATE OF ISSUANCE: 4/2/08 EFFECTIVE DATE:
OWNER: Primeland Development Co. LLP
CONTRACTOR: Brown Construction, Inc. ENGINEER: JUB Engineers
Page 1 of 3
You are directed to make the following changes in the Contract Documents.
•
Attachments: Work Change Directives # 2 and 3
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price
$ 1,717,487,31 _ Original Contract Times
Substantial Completion: 168 Da s - Ma 12008
2008
t: 213 Davs -June 15
R
d
f
Fi
l Pa
m
,
ea
y
or
na
y
en
_ -
days qr dares
Net Changes from previous Change Orders No. I to No. 6 Net Changes from previous Change Orders No. I tq No. 6
45 055
00 zz.s
$
.
pays
Contract Price prior to this Change Order Contract Times prior to this Change order
Substantial Completion: 168.5 Davs - Mav 1, 2008_
$ 1,752 542.31 Ready for Final Payment: _ 2135 Days -June 15.2008
days or dates
Net Increase (decrease of this Change Order) Net Increase (decrease of this Change Order)
13166
00 6
$
.
dayn
Contract Price with all approved Change Orders Contract Times with all approved Change Orders
Suhstantial Completion: Days - 206.5 May 3Q.20U8
$ 1.773,708.31 Ready For final payment: Davs - 251.5 July l6 2008
' days or dare.
RECOMMENDED BY OWNER:
Date: 4/2/08
APPROVED BY OWNER:
Date:
ACCEPTED BY CO TOR:
By:
Date: 4/2/OR
Date:
Tammy de Weerd, Mayor
Attest:
William G. Berg, Jr., City Clerk
Date:
Approved by City Council:
qTY OF MERiD1AN
ORTH B1J1QC G4T TRUNK S~IVEli
FDA (:C1UN7Y, IDAHO
i
woRS CxA1vGE nutEC~vE
No. 002
DATE OF ISSUANCE 03/31/08 FFFECTTVI~ DATE _.03/3,[/08.
O~~ r _ _ Cites of Meridian
CONTRACTOR ~~, ,_ ,_ _ _. _ Srgwn C~gns lion
Contract:
Project: __ North Black Trunk ewer
OWNER's Contract No. ENGINEER's Project No, .10-05-026 _ _
You are directed to proceed promptly with the following change(s):
Description: A 60"Type "B" "Through" manhole shall he added at Station 136 + 13.1 I _ Critical
elevations shall be as follows: Rim =2541.30, 21" IE In = 21" lE out = 251b.80, 8" lE in (E) ~ 2517.72,
Northing = 724783.57, Fasting =2438892.69.
291inear feet of 8" sewer shall be installed east from the new 60" "Through" manhole at a 3.30 slope..
The 8" stub shall be at a 90 degree angle to the 21" sewer trunk. The end of the stub shall be capped and
marked to the surface and shall be located as follows: Northing w 724783.29, Fasting = 243$923.37.
Purpose of Work Change Directive: To accommodate sewer flows from the Bellhaven Subdivision:
Attachments: (List documents supporting change)
Lf OWNER or CONTRACTOR believe that the above change has affected Contract Price any Claim for a
Change Order based thereon will "involve one or more of the following methods as defined in the
Contract Documents.
Method of deternnining change in
Contract Price:
^ Unit Prices
^ Lump Sum ®~.
^ Cost of the Work
Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract
if the change involves an increase, the estimated Substantial Completion: -~ days;
amount is not to be exceeded without further Ready for final payment: ~ days.
authorization.
RECOMMENDED: - AUTHORl7~D:
ENGiNFF12 OWNER
By: $y•
gJCDC No. 1910-8-F (1996 gdition)
Pleparad by the Gogiaeers Join Coutraet pacwtetax Cooaeirn+e anA eedattead by The ASeaeiaced general ConoaQOrs of Aa+erica and d,e Coion 5px'dicetions
Insuttttc.
Ct7Y OF MERIDIAN
NORTH BLACK CAT' TRUNK SEWER
ADA COUIYIY, IDAHO
WURK CHANGE DIRECTIVE
No. 003 ,_„
DATE OF ISSUANCE 03/3 /0 EFFECTIVE DATE 03/3.1/08 ,
O~ ~ _ ~ _ _ City o_f meridian
CONTRACTOR ro C nsttuction
Contract:
Project: ._._, North Bak C~ Trunk Sewer
OWNER's Contract No. ENGIIVEER's I7roject No. 10-05-026
You are directed to proceed promptly with the following change(s):
Description: A SO" Type "B" "'Through" manhole shall be added at Station 149 + 96.72_ Critical
elevations shall be as follows: Rim = 2S41.t54, 2l" IE In = 2l" IE out = 2518.67, 8" IE Block-Out In (W)
= 2519.75, Northing = 726167.11, Fasting =2438906.89.
Propose of Work Change Directive: To accommodate sewer flows from the Coleman Subdivision.
Attachments: (List dacutnents supporting change)
if OWNER or CONTRACTOR believe that the above change has afFected Contract Frice any Claim for a
Change Order based thereon will involve one or more of the following methods as defined in the
Contract Documents.
Method of determining change in
Contract Price:
^ Unit Prices
^ Lump Sum _ ~ evD
~[ Cvst of the Work ~.~~ ~r
!Estimated increase (decrease) in Gantract Price: Estimated increase (decrease) in Contract
$_ ~ , ~ ~~ •~ Times:
If the change involves an increase, the estimated Substantial Completion: „~,_ days;
amount is not to lie exceeded without further Ready for final payment: ~~ days_
authorization.
RECOMMENDED: AUTHORIZED:
F.NG[NEER
owNe~
By: By: