Loading...
HomeMy WebLinkAboutChange Order No. 1 with Knife River for Black Cat Trunk Sewer Extension Phase 4City of Mer idi an Publ ic Wor ks D ept. Memo ~I To: Jaycee Holman; Tara Green From: Max Jensen, Engineeri kg Technician jensenm@meridiancity.org Meridian Public Works Department 660 E. Watertower, Suite 200 Phone: 898-5500 , Fax: 898-9551 CC: Clint Dolsby, P.E., Interim City Engineer ~~~~1~~ APR 10 2008 City Of 1Vleridiaai City Clerk Office Date: 4/10/08 Re: Proposed Agenda Item for April 15, 2008 City Council Meeting The Public Works Department respectfully requests the following item be placed on the April 15, 2008 City Council agenda under Consent Agenda, for Council's consideration: Black Cat Trunk Sewer. Phase 4. Schedule B&C (Construction) Chanae Order No. 1 Attached is Change Order '!No. 1 for changes/additional work required as construction progresses towards completion. This change order is for an additional $12,021.08 (0.02% of the original contract amount)., Recommended Council Action: The Public Works Department recommends that City Council , approves the Change Order with Knife River for changes/additional work required as construction progresses towards completion of the B:iack Cat Trunk Sewer, Phase 4, Schedule BBC project. Thank you for your consideration. I will send original contract for your signature upon your consideration. Please contact me if you have any questions. • Page 1 CITY OF MERIDIAN 33 EAST IDAHO i MERIDIAN, ID 8364_ CONTRACT CHANGE ORDER Change Order No.: 1 Project Number: 07388 Date: 3118/2008 Effective Oate: CONTRACTOR: Kriife River PROJECT: Black Cat Trunk Sewer, Phase 4, Schedule 68~C The Contractor is hereby directed to make the following changes from the Contract Documents and Plans. Desciption: 1) Sewer line re-alignment through Bear Creek Park (Knife River C.O.R. #1) ADD $ 1,553.78 '2) WCD No. 001 -Construct additional asp; alt pathway (Knife River C.O.R. #2) ADD $ 1,294.30 3) Revised Construction Starting Point (Knife River C.O.R. #3y ADC $ 3,803.00 4) WCD No. 002 -Construct and Install additional manhole (Knife River C.O.R. #4) ADD $ 5,370.00 $12,021.08 Reason for Change Order: Construction revisions as project proceeds. Attachments: 1) Knife River C.O.R. #1 ' 2) WCD No. 001 (Knife River C.O.R. fl2) 3) Knife River C.O.R. #3 4) WCD No. 002 (Knife River C.O.R. #4) CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price: '$626,979.20. Original Contract Completion Date: 5/3/2008 1 Original Contract Completion Days: 5/23/2008 Net changes form previous C.O.'s.: ~ Net Days change form previous C.O.'s: No. 0 to 0 p No. 0 to 0 $0.00 0 Contract Price Prior to this C.O.: iF Contract Completion Date before this C.O.: 5/3/2008 1 ':$626, 979.20 Net Increase (decrease) of this C.O.: ~ Net Days Increase (decrease) of this C.O.: 0 ,f $12, 021.08 Contract Price with all Approved C.O.'s: ~ $639,000.28 Contract Completion Date with all Approved C.O.'s: 5/3/2008 RECOMMENDED: (CONSTRUCTION MANAGE ACCEPTED (CONTRACTOR) R By: ~ti'k~~-- ~ By. Date:, _~~ Date: APPROVED: (CITY PURCHASING AGENT) ~~ 1 COUNCIL APPROVAL , By: Keith Watts ~ Date: Date: t APPROVED: (CITY) ~ ATTEST: B : Ma or T mm de We r y y a y e d I By: City Clerk, Jaycee Homan bate: ,~ Date: KNIFE fZIVE~t AN MDU RESOURCES COMPANY ~I Sub-Total: $(152,927.60) 5450 W. Gowen Road Boise, ID 83709 (208) 362152 (208) 362-6199 FAX March 14, 2008 Max S. Jensen i City of Meridian E60 E. ~;~atertower. S~:ite 200 Meridian.ID 83642 Re: Black Cat Trunk, Sewer, Phase 4, Schedule B & C Subject: C.O.R. #1 -Additional Work Black Cat Rev 1 Changes Old Design Southern Idaho Division Dear Max: ~~ Knife River requests a change older for the following additional work. The project was redesigned to eliminate going through the asphalt pathway and avoiding crossing the Hardin Drain in two locations. The new design allowed the work through the park to be completed at an accelerated schedule. ~. Delete 27" PVC j -1016 LF @ 83.90 $(85,242.40) 60" Manhole -3 EA @ 5370.00 $(16,110.00) 7?" Manhole ~~ -1 EA (7a, 7740.00 $(7,740.00) Hardin Drain Crossing -2 EA @ 1700.00 $(3,400.OOj AC Patch -341 LF @ 43.2.0 $(14,731.20) SOD Repair -595 LF @ 43.20 $(25,704.00) O:\Black Cat Trunk Sewer PH4, Sch B&C - #76066\CORVlI -Additional Work.doc l i KNIFE RIVER I New Design 27" PVC 1001 LF @ 83.90 $83,983.90 60" Manhole 1 EA @ 5370.00 $5,370.00 72" Manhole 2 EA @ 7740.00 $15,480.00 Storm Drain Crossing 1 EA @ 1100.00 $1,100.00 Grass Parer 60 SY (a~ 62.60 $3,756.00 AC Patch 238 LF @ 43.20 $10,281.60 SOD Repair ~ 740 LF @ 43.20 $31,968.00 Replace MH Bases (BV INV 16748), 1 LS @ 2310.80 $2,310.80 Contractor OH & M on BV Inv. , 0.1 % @ 2310.80 $ 231.08 I Sub-Total: $154,481.38 Grand Total: $1,553.78 i If you have any questions or comments, please contact me. Sincerely, ,I . ~..t__ essee Rosin Project Manager JR: km I O:\Black Cat Trunk Sewer PH4, Sch B&C - #760ti6\CORUtI -Additional Work.doc i 'I 20846342ti8 Boise VaulUG2B !I ~ ~ ~_~ BOISE VAULT '~ ::~~-~~~ & PRECAST I "~.~: ' 608 Carnation Dr. Nampa, Idaho 83687 .208 /465-6900 FAX 208 / 463-4268 ARRIVAL . .. N 'r~ i 'err P.O.tf PROJEC 09:35:40 02-OS-2008 1 /1 INV ~ t~, ji QUOTE ID ORDER DATE v SHIP DATE ~ ~ S ~ O I have inventoried quantity end quality and found all to be satisfactory. If not, I have so listed above items not satisfactory. In signing this receipt form, I hereby release 8olse Vauk & Precast of all future claims of any nature for above listed materiel. I also ackrmwledge that all above material and related debts must be paid for In full not later than the 10th day of the month following the month of delivery. Customer agrees to pay collection costs end reasonable attorney fees if account becomes delinquent. lien laws wfi be enforced. Retairiage or deductbns are not acceptable. Recei~ Date ~; KNIFE ftlVEf~ AN MDU RESOURCES COMPANY 5450 W. Gowen Road ~ Boise, ID 83109 (206) 362152 (208) 362199 fdX . March 14, 2008 Southern Idaho Division Max S. Jensen ~ City of Meridian 660 E. Watertower, Smite 200 ~ Meridian, ID 83642 i Re: Black Cat Trunk' Sewer, Phase 4, Schedule B & C Subject: C.O.R. #2 -Sidewalk Repair Change Dear Max: I Knife River requests a change order for the following additional work. I At the request of the City ofM ~ndian, the original design was changed from a Type III sidewalk repair to a Type II repair. Old Design Type III Sidewalk Repair -171 LF @ 14.70 $(2,513.70) Sub-Total: $(2,513.70) New Design IzstaEl Type P^ 5ur`ace 1?0 ! F n `. If you have any questions or comments, please contact me. Sincerely', ~/v ~~_ essee Rosin ~ Project Manager ~i JR: km O:~Black Cat Trunk Sewer PH4, Sch B&C - #760661CORW2 -Sidewalk RepairChange.doc 22.^0 ~R,RnR n~ Sub-Total: $3,808.00 Grand Total: $1,294.30 i CITY OF MERIDIAN i BLACK CAT TRUNK SEWER, PHASE 4, SCHEDULE B&C ADA COUNTY, IDAHO ~ WORK CHANGE DIRECTIVE ~j No. 001 ~ ~ - ~_- DATE OF ISSUANCE 2-12-08 ' EFFECTIVE DATE 2-12-08 _ '~ _ '~i OWNER City of Meridian CONTRACTOR Knife River Contract: Black Cat Trunk Sewer. Phase 4 Schedule B & C Project: Black Cat Trunk Sewer. Phase 4, Schedule B & C OWNER'S Contract No. _ 0635 a ,~' ENGINEER'S Project No. You are directed to proceed promptly with the foiio~~~iag change(s): Description: ' Construct an additional asphalt pathway near the east side parking lot of Bear Creek Park. The pathway is to be constructed fr~m Bear Claw to MH 27 as detailed in Attachment `A' and `B'. Purpose of Work Change Directive: Pathway access '~ Attachments: (List documents supporting change) Attachment `A' and `B" I I _ _ __ If OWNER or CONTRACTOR believe that the above change has affected Contract Price any Claim for a Change Order based thereon will involve one or more of the following methods as defined in the Contract Documents. , Method of determining change in , Contract Price: ' ^ Unit Prices ^ Lump Sum O ^ Cost of the Work , , Z g `~ .. 3 Estimate mcrease~d~esse) in Contract Price: $ ~,29y.3a If the change involves an increase;. the estimated amount is not to be exceeded without further authorization. Estimated increase (~eet°eese}in Contract Times: Substantial Completion: ~ days; Ready for final payment: _~ days. RECO MENDE ~ AUTHORIZED: ~~ ~~ O s P CT ANAGER ; OWNER's ENGINEER EJCDC o. 1910-8-F (1996 Edition) ~. Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America and the Construction Specificarions Institute. k ,~ i Attachment `A' ,; Additional asphalt paving and concrete work shall be constructed in accordance with Attachment `B', the current construction plans, project manual and ISPWC. . ~ ~ ~~ ~ ~ ~ ~ Q j OO+g ~ (n U Y ~ (n M r ~. L ~ ~ ; tnm~W 3~~ vaiU,` ~~~vWi oZ° i > a~ v~w~- O ~ ~ •0 Z N°~ N(n Q`~~~I d O~ a ~ r ~, I N n. ~ ~ ~ = o I ~ ~ p N ~ ~iN,! w a~ ~ 3 ~ WN Q J W W ~ ~ WW p ~w W ~~~ W ~'~, ~Z p~ Q pwp~0 Z ~U ~ ~Z~ ~'Z Z ~J r d o~~ ~Ww O a U~ N =~~ U ~ Q N N W N O 3 ~ p E- zxr - °~ a JzQ. } °wZ ~' Q Q ~~ W ~a3o ~ ~ma I ° ~ o Q0~ Z~H N OW I ~ W N W ^~ vNi~ wo? U Ja I ~ ~ a \ ~ NQ UW W ~N~ Z Qo ~ r p ~O a p rW Z~~ Q OO p N W N ~ N Z N~ ~Z Z m~Q (n ~O ~ U ~ ~Q O U NNW ~z ~ ~Za ~ ~ ~ J o~ p V x = W c.7 w ~ H N ~w v' v'pZ p ~ ``' ~ ~~ w - ~ ~ .~ co ~m w 3Z~ ~~ ''v ~ a\. +a JNm Q~Q ov ww + NW apx Q ~ ~ ~ co ~ w¢ N ¢QW ¢a - N to p3 w xxZ wa a ~ ~' zN m Q~N pp ~ ( ~ , ~~ ~ 3Q~ aw I 820.0 =Uw ZW~ oN ~ R10.0 'R20.0. cnzo ~ o~c~ ?~ ~~ '~~~~ R1 .0 ~_ U C9 ~,,~ (~ Z = O a Q az ~~ ;i 1 O W ~'~ ~~ ~ vJiao ~3 i ~ ~ ~~ i W~ (n _i (V Q IM N oQxw o~Q oa ~ $ Z~ (np Zpl-J ZN r •~ V ~., .~ C ~ ~ ~, E c u ~ ~ V ~.+ L O 3 III r- W J KNIFE fZIV~E~t' AN MDU RESOURCES COMPANY 5450 W. Gowen Road Bose, ID 83109 (208) 362-8152 (208) 362199 FAII March 14, 2008 I Max S. Jensen City of Meridian 660 E. Watertower, Suite 200 ,j ~:,~ id,an, ID 3? 542 Re: Black Cat Trunk Sewer, Phase 4, Schedule B & C Subject: C.O.R. #3 -Additional Time 'k. Dear Max: I Knife River requests a change order for the following additional work. Southern Idaho Division At the beginning of the project, Knife River was requested to start at MH No. 23 versus the tie-in manhole on Stoddard Road. This change required that Knife River would need to use different excavation methods to install the sewer between MH No. 23 and MH No. 22. This change required that Knife River would need one (1) additional day of crew construction to complete this change. Therefore the cost of this work is: Revise Construction Starting Point: (1) Additional Crew Day for ;Production 750 Excavator 644 Loader Hoepack Servi;;a Tru~K , Extra Fuel 1 Day @ $3,803.00 Sub-Total Gra^d Tc;~!: $3,803.00 $3,803.00 $3,803.40 Generator End Dump ~I Labor 5 Man Crew If you have any questions or comments, please contact me. Sincerely, , ~~ _- ~ essee Rosin Project Manager JR: km ' O:\Black Cat Trunk Sewer PHO, Sch B&C - #760ti61COR\#3 -Additional Time.doc t KNIFE ftlV~~t AN MDU RESOURCES COMPANY 545D W. Gowen Road - ' Beae, ID 83)09 (206) 362152 (208) 362-&199 FAX March 14, 2008 ~~ Southern Idaho Divi~on Max S. Jensen '. City of Meridian 6f;0 E. Watertower., Suitt' 200 Meridian, ID 83642 Re: Black Cat Trunkl Sewer, Phase 4, Schedule B & C Subject: C.O.R. #4 - WCD No. 002 60" Manhole Dear Max: Knife River requests a change der for the following additional work. At the request of the City of Mel idian, a 60" manhole is to be installed at Sta. 2+75 as per WCD No. 002. This~manhole will allow for better cleaning and maintenance for City personnel. New Design Install 60" Manhole I 1 EA @ $5,370.00 $5,370.00 ~, Sub-Total: $5,370.00 franc! Tots:!: $5,3?Q.00 If you have any questions or co ments, please contact me. Sincerely, .~ essee Rosin '~ Project Manager `I JR: km ' i Oc~Black Cat Trunk Sewer PH4, Sch B&C - N760661C +ORVt4 -Add 60 MH.doc I CITY OF MERIDIAN BLACK CAT TRUNK SEWER, PHASE 4, SCHEDULES B & C ADA COUNTY. IDAHO I WORK CHANGE DIRECTIVE No. 002 DATE OF ISSUANCE 02/25/0:8 EFFECTIVE DATE 02/25/08 L OWNER CONTRACTOR Contract: Project: OWNER's Contract No. ENGINEER'S Project No. 10-06-059 You are directed to proceed promptly with the following change(s): Description: A 60" Type "B" "Through" manhole shall be added to the Schedule C 10" sewer line in Stoddard Road at STA. 2 + 75.00. Critical elevations shall be as follows: Rim = 2620.93, 10" IE In = 10" IE out = 2602.94 Purpose of Work Change Directive: To better accommodate cleaning and maintenance operations on the sewer after construction. i Attachments: (List documents supporting change) If OWNER or CONTRACTOR believe that the above change has affected Contract Price any Claim fora Change Order based thereon will ~ volve one or more of the following methods as defined in the Contract Documents. Method of determining change in' Contract Price: ^ Unit Prices Lump Sum ^ Cost of the Work Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract $ ~ Times: If the change involves an increase, the estimated Substantial Completion: days; amount is not to be exceeded without further Ready for final payment: days. authorization. RECOMMENDED: ~ AUTHORIZED: I ER ENGIN ER j OWNER ENGINEE By: Cl:~t ~Is6y c By: ~ I,'~r (~vl sl~v EJCDC No. 191D-8-F (I996 Edition) ~ / Prepared by the Engineers Joint Contract Docmnents Conorrittee and endorsed by The Associated General Contractors of America and the Construction Specifications Institute: